NSSCO Building Studies 6186: Setting Out and Site Preparation

NSSCO Building Studies 6186 · Work through your exam, one topic at a time.

All guide sections

Setting Out and Site Preparation

What the domain tests

Setting Out and Site Preparation tests transferring building position and levels from drawings to the ground: site clearance, datum, profiles, grid lines, squaring, levelling and excavation.

Core rules

  • Establish a datum and transfer levels with a dumpy level or laser level; record readings in the site diary.
  • Set out from the building line or grid, not from a boundary unless the drawing says so.
  • Square corners with the 3-4-5 method or by checking diagonals. A true rectangle has equal diagonals.
  • Profiles or batter boards carry lines at the wall face; string lines should be taut and protected from disturbance.
  • Verify dimensions, right angles and diagonals before excavation.
  • Strip topsoil and stockpile it; provide temporary drainage and protect services.

Worked example

Set out a 12 m x 8 m rectangle. Mark A, B, C, D with AB = 12 m and AD = 8 m. The diagonal should be the square root of 12 squared plus 8 squared, which equals 14.422 m. If AC measures 14.47 m, the rectangle is out of square by about 48 mm and must be adjusted. Reasoning: equal diagonals prove a rectangle; 3-4-5 gives an initial right angle.

Traps

  • Measuring along the boundary instead of the building line.
  • Skipping the diagonal check.
  • Disturbing pegs or string lines without rechecking.
  • Mixing datum levels between drawings and site.
  • Excavating before services are located.