Humidity and Pressure in a Medical Office Retrofit

AARE · Put your knowledge to work in context.

All case studies

Humidity and Pressure in a Medical Office Retrofit

A 12,000 sf outpatient clinic is being retrofitted in a humid climate. It has 24 exam rooms and 2 procedure rooms. The existing 40-ton packaged rooftop unit delivers 8,000 cfm with 20% outdoor air (1,600 cfm), single-zone VAV control, no reheat, and no economizer. Summer design is 95°F db/78°F wb; the clinic targets 75°F and 50% RH. Staff report 64% RH, mold on diffusers, exam rooms that are not negative to the waiting area, and procedure rooms that smell musty. The owner proposes adding a 10-ton unit to “get more cooling.” The ceiling is 9 ft, the plenum is tight, and the clinic cannot shut down for more than a weekend. The architect must advise on mechanical scope before design development.

1. Diagnose the humidity problem and evaluate the owner’s proposal to add 10 tons of cooling.

Read the worked answer

The symptoms point to poor dehumidification, not insufficient sensible capacity. A 40-ton single-zone VAV unit at part load reduces airflow across the coil; without reheat or a dedicated dehumidification sequence, the coil may not stay cold enough long enough to remove latent heat, and the space drifts to 64% RH. Adding 10 tons increases sensible capacity and makes short cycling worse, so it is likely to increase moisture problems and energy use. The 1,600 cfm of outdoor air in a humid climate is a large latent load; the unit must be selected for latent capacity at the actual entering air conditions. The architect should recommend a dedicated outdoor air system with enthalpy recovery and independent dehumidification, plus terminal reheat or fan-powered boxes so space airflow can be maintained while the central unit dehumidifies. Before sizing, the team needs a load calculation and a psychrometric review of the coil at part-load conditions.

2. Establish a pressure relationship scheme for waiting, exam rooms, procedure rooms, and toilet rooms. What evidence should the architect require before accepting the design?

Read the worked answer

The clinic needs a documented pressure cascade rather than a single building-wide pressure. Procedure rooms should be positive relative to the corridor and adjacent spaces to protect the sterile field; exam rooms are generally neutral or slightly negative to the corridor; waiting areas and toilet rooms should be negative so odors and airborne contaminants do not migrate into clinical areas. The design should show supply, return, and exhaust quantities for each room, door undercuts or transfer grilles, and the expected pressure differential in pascals. The architect should require a room-by-room air balance schedule, a controls sequence that maintains pressure when VAV boxes modulate, and commissioning that includes pressure verification at full and part load. A musty smell in procedure rooms suggests the current return/exhaust layout is crossing the cascade. The architect should not accept a narrative “we will balance it” without the schedule and functional performance test.

3. The owner wants to keep the existing rooftop unit and add standalone dehumidifiers in each exam room. What are the risks, and what alternative would you recommend?

Read the worked answer

Standalone dehumidifiers in 24 exam rooms create maintenance, drainage, noise, and infection-control problems, and they do not fix the outdoor-air latent load or the pressure relationships. They also add electrical and condensate loads in tight plenums. The better approach is to treat ventilation air centrally with a dedicated outdoor air unit sized for latent load and enthalpy recovery, then use the existing rooftop unit for sensible cooling where it can perform. If the existing unit must remain, the design should add a reheat coil or a wrap-around heat pipe and a controls sequence that prevents short cycling. The architect should require an energy model comparing the options and a life-cycle cost analysis; the cheapest first-cost fix is likely the most expensive in maintenance and mold remediation. The clinic should plan a weekend tie-in with temporary cooling and a commissioning plan.