AARE study materials
AARE study resources

AARE flashcards

AARE · Build recall with a focused review session.

33 cards. Read the term and the definition here. The deck at the top of this page is optional.

Net assignable area
The usable floor area of a building excluding circulation, mechanical, and structural elements; used in programming to determine space needs.
Life-cycle cost analysis
Method of evaluating total cost of ownership over time, including initial, operating, maintenance, and replacement costs, discounted to present value.
Critical path method
Scheduling technique identifying the longest sequence of dependent activities; delays on critical path delay project completion.
Design-build delivery
Project delivery method where a single entity provides both design and construction services under one contract with the owner.
Sun path diagram
Graphical plot of the sun's altitude and azimuth throughout the year for a specific latitude; used to design shading and orientation.
Soil bearing capacity
The maximum pressure soil can support without failure; determined by geotechnical investigation and used to size foundations.
Rational method
Formula Q = CiA for estimating peak stormwater runoff; Q is flow, C runoff coefficient, i rainfall intensity, A drainage area.
100-year floodplain
Area with 1% annual chance of flooding; building codes restrict construction and require elevation or floodproofing.
Occupant load
Number of people a space is designed to hold, calculated by dividing floor area by occupancy-specific area per person.
Travel distance
Maximum allowed distance from any point to an exit; typically 250 ft unsprinklered and 400 ft sprinklered for business occupancies.
Daylight factor
Ratio of interior illuminance to exterior horizontal illuminance under overcast sky; expressed as percentage; target 2% for offices.
STC rating
Sound Transmission Class; single-number rating of airborne sound insulation; higher values indicate better sound isolation.
Dead load
Permanent static load on a structure from its own weight and fixed building components such as walls, floors, and roofs.
Live load
Variable load on a structure from occupancy, furniture, equipment, and environmental effects such as snow or wind.
Moment of inertia
Geometric property of a cross-section measuring resistance to bending; for rectangle I = bd^3/12; stiffness increases with depth cubed.
Euler buckling load
Critical axial load at which a slender column buckles: Pcr = π²EI/(KL)²; K depends on end support conditions.
Sensible heat ratio
Ratio of sensible heat to total heat in an HVAC load; indicates proportion of sensible to latent cooling required.
Psychrometric chart
Graph showing relationships among dry-bulb, wet-bulb, dew point, humidity ratio, and enthalpy; used to analyze air conditioning processes.
Fixture unit
Unit measure of plumbing demand; one fixture unit approximately equals 1 gallon per minute; used to size water and drain pipes.
Illuminance
Amount of light falling on a surface, measured in footcandles (fc) or lux; 1 fc = 10.76 lux; office target about 50 fc.
Floor area ratio
Zoning metric: gross floor area divided by lot area; determines maximum allowable building bulk on a site.
Setback
Minimum required distance from a property line to a building; established by zoning to provide light, air, and open space.
Accessible route
Continuous unobstructed path connecting accessible elements and spaces; minimum 36 inches clear width; must comply with ADA Standards.
Ramp slope
Maximum permitted slope for accessible ramps is 1:12 (8.33%); maximum rise per run is 30 inches; landings required at top and bottom.
Water-cement ratio
Ratio of water to cementitious materials in concrete mix; lower ratio increases strength and durability but reduces workability.
MasterFormat
CSI standard organizing construction specifications into 50 divisions by work type; used for consistent specification writing.
Submittal
Shop drawing, product data, or sample submitted by contractor to architect for review to verify compliance with design intent.
Curing
Maintaining moisture and temperature of concrete after placement to allow cement hydration and achieve design strength; typically 7 days.
Request for information
Formal written question from contractor to architect seeking clarification of contract documents; response becomes part of documents.
Change order
Written modification to contract signed by owner, contractor, and architect; adjusts contract sum, time, or both.
Substantial completion
Stage when work is sufficiently complete for owner occupancy; triggers warranty start, retainage reduction, and punch list.
Standard of care
Legal benchmark requiring architect to perform with reasonable skill and care of ordinary professional under similar circumstances; not a guarantee.
Conflict of interest
Situation where professional judgment could be influenced by personal or financial interests; must be disclosed and avoided.