AARE · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Pre-Design and Project Planning & Building Design and Programming

  • Map the ARE 5.0 exam structure and AARE domain weights onto a personal tracker, converting each of the nine domains into a checklist of sub-skills you can rate 1–5.

  • Draft a written pre-design workflow that sequences client interview, existing-conditions survey, code and zoning research, and budget/schedule validation before schematic design begins.

  • Build a one-page programming matrix template linking space types to square footage, adjacency requirements, occupancy, and code-driven egress assumptions.

  • Solve five practice scenarios that require converting a client's stated needs into a written program with net-to-gross area calculations.

  • Explain in writing how a project budget, schedule, and program constrain one another, using one worked example with numbers.

Your checkpoint

A 2–3 page pre-design and programming playbook: workflow diagram, programming matrix template, and one fully worked program-to-area calculation.

Week 2

Pre-Design and Project Planning & Building Design and Programming

  • Analyze three case-study building types (e.g., clinic, school, small office) and list the programming drivers unique to each.

  • Practice writing measurable design objectives that respond to a client's operational and budget constraints.

  • Compute net-to-gross ratios and usable-area yields for at least three hypothetical floor plates.

  • Draft a schematic-design phase schedule with review gates tied to owner sign-off and code-review checkpoints.

  • Self-quiz on pre-design vocabulary (feasibility study, conditions assessment, charrette, basis of design) until you can define each without notes.

Your checkpoint

A completed programming package for one hypothetical project: client goals, program matrix, area calculations, and a phased schedule with sign-off gates.

Week 3

Site and Environmental Analysis & Structural Systems and Building Technology

  • Conduct a written site analysis for a hypothetical urban infill parcel covering solar orientation, prevailing wind, noise, views, drainage, and access.

  • Compute sun angles and shadow impacts for at least two dates using a simple solar-position method, and record conclusions in writing.

  • Compare shallow versus deep foundation systems and list the site conditions that drive each choice.

  • Diagram how structural bay spacing, floor-to-floor height, and lateral system choice affect a building's planning module.

  • Identify the environmental regulations (wetlands, floodplain, stormwater, erosion control) that could constrain a chosen site and note which agency governs each.

Your checkpoint

A site and structure analysis brief: annotated site plan, solar/shadow summary, foundation recommendation with justification, and a structural grid diagram tied to the planning module.

Week 4

Structural Systems and Building Technology & Construction Materials, Methods, and Specifications

  • Compare steel, concrete, masonry, and wood structural systems on span capability, fire resistance, cost, and schedule, and record the comparison in a table.

  • Select and justify a structural system for two hypothetical building programs with different span and load requirements.

  • Assemble a materials matrix matching at least six common assemblies (wall, roof, floor, glazing) to their performance attributes and typical specifications.

  • Write three specification-style paragraphs using correct CSI MasterFormat division language for one assembly.

  • Explain in writing how structural movement, tolerances, and connection detailing affect finish and envelope selection.

Your checkpoint

A structural and materials selection matrix covering at least four structural systems and six assemblies, with written justifications and three sample specification paragraphs.

Week 5

Environmental, Mechanical, Electrical, and Plumbing Systems & Construction Materials, Methods, and Specifications

  • Calculate heating and cooling load drivers for a simple building and explain how envelope, orientation, and internal gains change the result.

  • Diagram a complete HVAC, plumbing, and electrical distribution concept for a two-story building, labeling shafts, chases, and equipment rooms.

  • Compare at least three HVAC system types on first cost, energy use, space requirements, and maintenance.

  • Identify the code and energy-standard requirements that drive mechanical, electrical, and plumbing design decisions for your hypothetical project.

  • Write a paragraph explaining how an integrated envelope-and-systems decision reduces total energy use, citing specific measures.

Your checkpoint

An MEP integration package: labeled systems diagrams for one two-story building, a system comparison table, and a one-page energy strategy narrative.

Week 6

Building Codes, Zoning, and Accessibility & Contract Administration and Construction Observation

  • Build a code-compliance checklist covering occupancy classification, egress width and travel distance, fire separations, and accessibility for one hypothetical project.

  • Apply accessibility requirements to a restroom and an entry sequence, documenting clearances and reach ranges with written dimensions.

  • Interpret zoning parameters (setbacks, FAR, height, parking) to determine maximum buildable envelope for a sample parcel.

  • Draft a construction-observation log entry and a field report describing a nonconforming condition and the correct follow-up action.

  • Outline the contract-administration sequence from pre-construction meeting through substantial completion and punch list, naming each party's role.

Your checkpoint

A code and contract administration packet: completed compliance checklist, an accessibility-dimensioned plan detail, a zoning envelope calculation, and two sample field reports.

Week 7

Contract Administration and Construction Observation & Professional Practice, Ethics, and Project Management

  • Analyze at least four ethical scenarios (conflict of interest, undisclosed error, owner pressure, gift acceptance) and write the defensible course of action for each.

  • Map the standard AIA contract family to project delivery methods and identify which agreement governs each phase.

  • Draft a risk-management plan for a small firm project covering scope creep, fee negotiation, and documentation standards.

  • Practice writing a professional disagreement memo that separates technical facts from business judgment.

  • Self-quiz on professional-practice vocabulary (standard of care, indemnity, lien, submittal, RFI, change order) until definitions are automatic.

Your checkpoint

A professional practice and ethics workbook: four written ethical analyses, a delivery-method-to-contract comparison table, and one risk-management plan.

Week 8

Pre-Design and Project Planning & Building Design and Programming & Environmental, Mechanical, Electrical, and Plumbing Systems & Building Codes, Zoning, and Accessibility

  • Complete a timed full-length practice exam under test conditions and score it by domain.

  • Review every missed item and write a one-sentence correction note that names the underlying principle, not just the answer.

  • Re-rate your nine-domain skill checklist and identify the two weakest domains for targeted review.

  • Build a final two-week review schedule that prioritizes weak domains while maintaining weekly practice on strong ones.

  • Rehearse a verbal walkthrough of one integrated design scenario, connecting pre-design, programming, systems, and code decisions in a single narrative.

Your checkpoint

A scored practice exam with a domain-by-domain error analysis and a written two-week final review plan targeting your two weakest domains.

Milestones

Week 2: Can produce a complete program matrix with net-to-gross calculations for an unfamiliar building type in under 45 minutes without notes.

Week 4: Can justify a structural system choice and match it to a materials palette for an unfamiliar program in a written response of 200 words or more.

Week 6: Can complete a code and accessibility compliance checklist for an unfamiliar floor plan, correctly identifying egress and clearance issues, scoring at least 80% against your own answer key.

Week 8: Practice exam score at or above 70% overall, with no single domain below 60%, and a written review plan in place.