NABCEP PVDS study plan
NABCEP PVDS · Give each week a clear focus.
8 weeks · About 7 hours per week
PV system electrical design
Trace a complete PV circuit from array through inverter to point of interconnection, labeling every conductor, overcurrent device, and disconnect on a one-line diagram
Compute string open-circuit voltage at the coldest expected design temperature and confirm it stays below the inverter maximum input voltage
Compute string operating voltage at the hottest expected cell temperature and confirm it stays above the inverter minimum MPPT voltage
Apply NEC 690.7 temperature correction factors to module Voc and record the source of each correction value
Your checkpoint
A one-line diagram of a 10 kW residential system with a table showing cold-temperature Voc, hot-temperature Vmp, and pass/fail against inverter voltage window
PV system electrical design
Size string conductors and the dc equipment grounding conductor using NEC 690.8 current calculations and 310.16 ampacity tables
Select and justify overcurrent protection for source circuits, output circuits, and the inverter output using 690.8 and 690.9
Calculate maximum PV system voltage and verify 690.7 compliance for a bipolar or ungrounded array configuration
Explain how rapid shutdown requirements in 690.12 constrain conductor routing and combiner placement
Your checkpoint
A conductor and OCPD sizing worksheet for the same 10 kW system showing every calculation step and the governing NEC article
PV system mechanical design
Compute roof dead load and wind uplift pressure for a flush-mounted array using ASCE 7 load combinations and module datasheet values
Determine minimum setback and access pathway dimensions required by the International Fire Code and local amendments
Specify rail spans, attachment spacing, and lag screw embedment for a given rafter spacing and module dimension
Identify when structural stamped engineering is required versus prescriptive attachment per code
Your checkpoint
A racking layout drawing with attachment spacing schedule, load assumptions, and a written justification for whether stamped engineering is needed
PV system mechanical design & Project site assessment
Perform a shade analysis and translate the result into row spacing and minimum inter-row pitch for a ground-mount array
Evaluate roof condition, age, and covering type to determine whether re-roofing must precede installation
Document structural framing observed in the attic and flag deficiencies that affect attachment strategy
Compare flush mount, tilt mount, and ballasted options for a low-slope commercial roof against waterproofing and load constraints
Your checkpoint
A site structural and mounting feasibility memo covering two candidate roof surfaces with a recommended mounting method for each
Project site assessment
Measure and record service entrance parameters including main breaker rating, busbar rating, and available panel spaces for a 120 percent busbar rule check
Conduct a shade study at multiple times of day and season and convert results into an annual production estimate
Assess utility interconnection options by reading a sample interconnection application and identifying the applicable review tier
Identify obstructions, clearances, and working space constraints at the proposed point of interconnection
Your checkpoint
A completed site assessment form for a real or simulated property including service panel photos-equivalent data, shade results, and interconnection tier determination
Design documentation, permitting, and safety
Assemble a permit package checklist covering structural, electrical, and zoning submittal requirements for a typical jurisdiction
Produce a bill of materials and a labeling schedule matching NEC 690 and 705 marking requirements
Write a lockout/tagout and fall protection plan for a rooftop installation day
Draft a commissioning checklist covering insulation resistance, polarity, ground continuity, and IV curve tracing
Your checkpoint
A complete permit submittal package index with a labeling schedule and a one-page site safety plan
PV system electrical design & Design documentation, permitting, and safety
Perform a full design review of a sample plan set and log every code deficiency found with the governing article
Verify the 120 percent busbar rule and supply-side versus load-side connection math for a service panel upgrade scenario
Reconcile as-built documentation against the approved plan set and describe the change order process
Explain inspection checkpoints a plan reviewer or field inspector will verify for the electrical portion
Your checkpoint
A redline review of a sample plan set listing at least ten findings with code citations and recommended corrections
PV system mechanical design & Project site assessment & Design documentation, permitting, and safety
Complete two timed full-length practice exams and score each domain separately to find weak areas
Re-derive the ten calculations you missed most often without reference material
Build a one-page formula and reference sheet from memory covering voltage correction, ampacity, and load calculations
Review missed items across all four domains and confirm you can state the reasoning, not just the answer
Your checkpoint
A scored practice exam log with per-domain percentages and a personal formula sheet demonstrating closed-book recall
Milestones
Week 2: Can complete a full dc and ac conductor and OCPD sizing calculation for an unfamiliar system in under 20 minutes with correct NEC citations
Week 4: Can justify a mounting method and attachment spacing for an unfamiliar roof with reference to load calculations and fire code setbacks
Week 6: Can assemble a permit-ready package index and labeling schedule without referring to a template
Week 8: Scores at least 80 percent overall with no domain below 70 percent on a timed practice exam