NABCEP SH Associate cheat sheet
NABCEP SH Associate · Keep the key ideas within reach.
Conducting a Site Analysis, Including Load Analysis
Daily energy demand (Wh/day) = sum of (appliance wattage × hours used per day) for every load; add an inverter/system loss factor of roughly 1.3–1.5 to size array output.
Solar window is the period with no shading; usable peak sun hours (PSH) is the daily insolation in kWh/m²/day, numerically equal to equivalent hours at 1 kW/m².
Shading survey tools: solar pathfinder or smartphone sun-path app plus a physical walk of the array footprint at multiple times of day; record obstructions with azimuth and elevation.
Roof structural check: confirm rafter/truss spacing, span, and condition; verify dead load capacity for modules, racking, and ballast before layout.
Roof surface assessment: measure usable area, note penetrations, parapets, HVAC units, skylights, and set required fire-access pathways per local code.
Load analysis distinguishes continuous loads (×1.25 for conductor/OCPD sizing), intermittent loads, and surge loads such as motor starting.
Battery-based systems: usable capacity (Wh) = nominal capacity (Wh) × depth of discharge × inverter/round-trip efficiency; size autonomy in days of no-sun.
Site data to record: latitude/longitude, tilt and azimuth of mounting plane, annual and worst-month PSH, ambient temperature range, snow/wind loads, and utility interconnection point.
SH Safety Practices, Standards, Codes and Certification
NEC Article 690 governs PV systems; Article 690.12 requires rapid shutdown - conductors within 1 ft of the array and 3 ft of conduit must be de-energized to ≤30 V within 30 seconds of shutdown.
NEC 690.7: maximum PV system voltage = module Voc × correction factor for lowest expected ambient temperature, and it must not exceed inverter/equipment ratings.
NEC 690.8: continuous current = Isc × 1.25 for conductor ampacity; OCPD rating = Isc × 1.25 × 1.25 (1.56), then rounded to the next standard size.
Arc-flash and shock hazards persist because modules are energized whenever illuminated; cover modules or work at night/low light for DC conductor work.
Required PPE: voltage-rated gloves, arc-rated clothing per incident-energy analysis, safety glasses, and insulated tools; lockout/tagout the AC side before service.
Fall protection is required at heights per OSHA 1926 Subpart M (generally 6 ft in construction); use harness, anchor points, and guardrails.
Standards to know: UL 1703/UL 61730 (modules), UL 1741 (inverters/grid support), UL 2703 (racking/bonding), UL 9540 (energy storage), IEC 61215/61730.
Certifications: NABCEP PV Associate, PV Installation Professional, and Solar Heating; state electrical licensing and local AHJ permitting are separate requirements.
Identifying Systems for Specific Climates and Applications
Hot climates: high cell temperature reduces voltage and power (typical power temp coefficient about −0.3 to −0.45 %/°C); specify modules with better temperature coefficients and ensure array ventilation.
Cold climates: Voc rises at low temperature, so use the coldest expected ambient for maximum voltage calculations; snow shedding favors steeper tilt (≥40°) and smooth frameless modules.
Coastal/marine: specify corrosion-resistant racking (anodized aluminum, stainless hardware), avoid dissimilar-metal contact, and account for salt-fog testing.
Dusty/arid: soiling losses can reach 5–20 %; plan cleaning schedules, use anti-soiling coatings, and consider higher tilt for self-cleaning.
Off-grid applications: size array for worst-month PSH, include battery autonomy (typically 2–5 days), and use MPPT charge controllers for efficiency.
Grid-tied with battery backup: hybrid inverters with critical-load subpanels; verify backup transfer time and surge capacity for motor loads.
Solar thermal vs PV: SHW (solar hot water) uses collectors and a heat-transfer loop; PV uses modules and inverters; hybrid PV-T combines both but adds complexity.
Utility-scale vs rooftop: ground-mount uses single-axis trackers in high-DNI regions; rooftop prioritizes usable area and structural limits over tracker gains.
Identifying Proper Orientation and Installation Methods
Fixed-tilt in the northern hemisphere faces true south (azimuth 180°); tilt approximately equal to latitude maximizes annual yield, with steeper tilt favoring winter and shallower favoring summer.
Azimuth deviations of ±15–20° from true south typically cost only a few percent of annual yield; larger deviations are weighed against roof constraints.
Row spacing: avoid inter-row shading between about 9 a.m. and 3 p.m. on winter solstice; spacing depends on tilt, latitude, and module height.
Racking types: flush-mount (roof-parallel), tilted/standoff, ballasted (no penetrations, for flat roofs), and ground-mount (pole or fixed).
Roof-mount attachment: lag bolts into structural members, flashed penetrations, and standoff heights that allow airflow and module cooling.
Module clamping: follow manufacturer clamp zones and torque specs; do not clamp on non-clampable frame edges; allow expansion gaps.
Grounding/bonding: bond module frames and racking with listed bonding hardware (UL 2703) and a continuous equipment grounding conductor.
Commissioning: verify string polarity, Voc and Isc per string, insulation resistance, and inverter startup; document with as-built and photos.
Identifying Proper Use of Balance of System Components and Materials
Balance of system (BOS) includes racking, wiring, disconnects, OCPD, combiners, grounding, inverters, charge controllers, and monitoring.
Conductor sizing: ampacity ≥ 1.25 × Isc for PV source/output circuits; account for temperature correction and conduit fill derating.
String combiners: fuse each string at 1.56 × Isc (per NEC) and use a DC-rated disconnect; verify fuse voltage rating exceeds max system voltage.
Inverters: string inverters for simple arrays, microinverters for module-level MPPT and shade tolerance, and hybrid for battery integration; match DC/AC ratios (typically 1.0–1.3).
Charge controllers: PWM for small systems with matched voltages; MPPT for larger systems and higher array voltages; size to array Isc and battery voltage.
Disconnects: DC-rated for PV circuits; AC disconnect accessible to utility/first responders; rapid shutdown devices for roof-mounted arrays.
Wiring methods: use PV-rated (sunlight-resistant, wet-rated) conductors outdoors, UV-rated conduit, and proper strain relief; keep DC and AC circuits separated.
Materials: use corrosion-resistant hardware, listed connectors (MC4-compatible), and proper junction boxes; avoid mixing connector brands.
Identifying Common SH Maintenance Items
Cleaning: remove soiling (dust, pollen, bird droppings) with water and soft brushes; avoid abrasive tools; schedule based on soiling rate and rainfall.
Visual inspection: check for cracked glass, hot spots, delamination, discoloration, snail trails, and loose or corroded connections.
Electrical checks: measure string Voc and Isc, compare to commissioning baseline; check for ground faults, insulation resistance, and inverter fault logs.
Thermal imaging identifies hot spots, bypass-diode failures, and loose terminations not visible to the eye.
Racking/hardware: torque-check bolts, inspect for corrosion and loose clamps, verify flashing and roof seal integrity after storms.
Battery maintenance (if present): check electrolyte (flooded), terminal torque, ventilation, temperature, and state of charge; replace at end of life.
Inverter maintenance: clean/replace air filters, verify cooling, check firmware and monitoring connectivity, and record fault codes.
Documentation: maintain a maintenance log with dates, findings, and corrective actions; track performance ratio to detect degradation trends.