NALP LCT · Get comfortable with the vocabulary.

Scope of Work

A written statement listing every task, material, and deliverable a contractor will provide under a contract. It defines what is included and, by omission, what is excluded.

Related: Change Order, Contract Documents
Contract Documents

The complete set of drawings, specifications, scope of work, general and supplementary conditions, and addenda that together legally define a project. Conflicts among them are usually resolved by a stated order of precedence.

Related: Scope of Work, Specifications, Change Order
Change Order

A written amendment signed by owner and contractor that modifies the contract price, schedule, or scope after execution. Without one, extra work is often unpaid.

Related: Scope of Work, Punch List
Punch List

A documented list of incomplete or deficient items identified near substantial completion that the contractor must correct before final acceptance and final payment.

Related: Substantial Completion, Change Order
Substantial Completion

The stage at which the work is sufficiently complete for the owner's intended use, even though minor items remain. It typically starts warranty periods and releases retainage in part.

Related: Punch List, Retainage, Warranty Period
Retainage

A percentage of each progress payment withheld by the owner until project milestones or final completion are met. It protects the owner against unfinished or defective work.

Related: Progress Payment, Substantial Completion, Lien
Progress Payment

Periodic payment to a contractor for work completed and materials stored during a billing period, usually based on a schedule of values and approved by the owner or architect.

Related: Schedule of Values, Retainage
Schedule of Values

A breakdown allocating the contract sum across work items, used to evaluate progress payment requests. It should reflect the actual distribution of cost, not an arbitrary front-loaded split.

Related: Progress Payment, Retainage
Lien

A legal claim against a property securing payment for labor, materials, or services provided. Landscape contractors and suppliers must follow strict statutory notice and filing deadlines to preserve it.

Related: Retainage, Lien Waiver
Lien Waiver

A document in which a contractor or supplier gives up the right to file a lien, either conditionally upon payment or unconditionally after receiving it. Signing one prematurely can forfeit leverage.

Related: Lien, Progress Payment
Bid Bond

A surety instrument guaranteeing that a bidder will enter the contract at the bid price if selected. It protects the owner if the low bidder withdraws.

Related: Performance Bond, Payment Bond
Performance Bond

A surety guarantee that the contractor will complete the work according to the contract terms. If the contractor defaults, the surety funds completion or pays the owner's loss.

Related: Bid Bond, Payment Bond
Payment Bond

A surety guarantee that subcontractors, laborers, and material suppliers will be paid. It substitutes for lien rights on bonded public projects where liens are generally unavailable.

Related: Performance Bond, Lien
General Conditions

Contract provisions covering administration of the work, such as payments, submittals, insurance, and dispute resolution. They apply across the whole project rather than to one trade.

Related: Contract Documents, Specifications
Specifications

Written requirements describing materials, products, workmanship, and quality standards. They complement drawings and typically govern where dimensions or quality conflicts arise.

Related: Contract Documents, Shop Drawing
Shop Drawing

A contractor-prepared drawing detailing how a specific component will be fabricated or installed. It is submitted for review and does not relieve the contractor of design responsibility unless stated.

Related: Specifications, Submittal, Request for Information
Submittal

Any product data, sample, mockup, or drawing the contractor sends for approval before installation. Review confirms general conformance but does not authorize deviations from the contract documents.

Related: Shop Drawing, Request for Information
Request for Information

A formal written question from the contractor asking the design team to clarify ambiguous or conflicting documents. The answer becomes part of the record and may lead to a change order.

Related: Submittal, Change Order
Warranty Period

The time after acceptance during which the contractor must repair defects in materials or workmanship at no cost. Plant warranties are usually separate and shorter than hardscape warranties.

Related: Substantial Completion, Punch List
Critical Path Method

A scheduling technique that identifies the longest sequence of dependent tasks, which determines the shortest possible project duration. Delays on critical activities push the completion date.

Related: Gantt Chart, Float
Float

The amount of time an activity can slip without delaying the project completion date. Activities on the critical path have zero float.

Related: Critical Path Method
Gantt Chart

A bar chart showing activities against a calendar timeline, with durations and overlaps visible at a glance. It is useful for communication but shows dependencies less clearly than a network diagram.

Related: Critical Path Method, Float
Job Hazard Analysis

A process that breaks a task into steps, identifies hazards at each step, and defines controls before work begins. It is most effective when crews participate in writing it.

Related: Hierarchy of Controls, Toolbox Talk, Personal Protective Equipment
Hierarchy of Controls

A ranked approach to reducing risk: eliminate the hazard, substitute something safer, engineer controls, adjust administrative practices, then rely on personal protective equipment last.

Related: Job Hazard Analysis, Personal Protective Equipment
Personal Protective Equipment

Gear worn to reduce exposure to hazards, such as eye protection, gloves, hearing protection, and chaps for chainsaw work. It is the last line of defense, not a substitute for eliminating hazards.

Related: Hierarchy of Controls, Job Hazard Analysis
Toolbox Talk

A short, focused safety meeting held at the start of a shift to review a specific hazard or task. Documentation of attendance supports compliance and reinforces accountability.

Related: Job Hazard Analysis, Near Miss
Near Miss

An unplanned event that did not cause injury or damage but could have. Reporting near misses reveals failing controls before a serious incident occurs.

Related: Toolbox Talk, Incident Rate
Competent Person

An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective action. Trenching, scaffolding, and tree work standards often require one on site.

Related: Excavation Protective System, Job Hazard Analysis
Excavation Protective System

Shoring, shielding, sloping, or benching used to protect workers in trenches from cave-ins. A competent person must inspect it daily and after rain or other changing conditions.

Related: Competent Person, Utility Locate
Utility Locate

The process of marking underground lines before digging, typically through a one-call service plus private locating. Hand digging near marked lines protects workers and prevents service outages.

Related: Excavation Protective System, Job Hazard Analysis
Incident Rate

A standardized measure of recordable injuries or lost workdays per hours worked, commonly per 200,000 hours. It allows fair comparison of safety performance across crews or years.

Related: Near Miss, Job Hazard Analysis
Soil Texture

The relative proportions of sand, silt, and clay particles in a soil. It governs drainage, water holding capacity, and how easily roots penetrate.

Related: Soil Structure, Percolation Test
Soil Structure

The arrangement of soil particles into aggregates and pore spaces. Good structure supports air and water movement, while compaction destroys it and stresses roots.

Related: Soil Texture, Soil Compaction
Soil Compaction

The densification of soil that reduces pore space and restricts air, water, and root growth. Construction traffic is a common cause, and remediation may require aeration or soil replacement.

Related: Soil Structure, Percolation Test
Percolation Test

A field measurement of how quickly water moves through soil, used to size drainage and infiltration systems. Results depend on soil texture, structure, and moisture at the time of testing.

Related: Soil Texture, Soil Compaction
Plant Hardiness Zone

A geographic rating based on average annual minimum temperature that guides which plants are likely to survive winter. It does not account for soil, moisture, or summer heat.

Related: Right Plant, Right Place, Native Plant
Right Plant, Right Place

A design principle of matching a plant's light, water, soil, and space requirements to the site so it thrives with minimal inputs. It reduces replacement costs and maintenance.

Related: Plant Hardiness Zone, Native Plant
Native Plant

A species that occurs naturally in a region without human introduction and has adapted to local climate and soils. Natives often support pollinators and need less irrigation once established.

Related: Right Plant, Right Place, Plant Hardiness Zone
Sustainable Sites

Design and construction practices that limit environmental harm, such as preserving existing vegetation, managing stormwater on site, and reducing irrigation demand. Documentation of these measures can earn green certification credits.

Related: Percolation Test, Native Plant