NALP LCT study materials
NALP LCT study resources

NALP LCT study plan

NALP LCT · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Landscape Industry Training and Professional Development & Safety Training and Workplace Safety Practices

  • Map the four LCT domains against your current job duties and write a one-page gap list ranking your weakest three subtopics

  • Define landscape industry career pathways (entry installer, crew leader, irrigation technician, designer, account manager) and list the typical training and certification each one requires

  • Draft a personal 12-month professional development plan naming two credentials you will pursue and the prerequisites for each

  • List the core OSHA-style hazard categories that apply to landscape crews (equipment, heat, chemical, electrical, traffic, excavation) and note one control for each

Your checkpoint

A one-page development plan plus a ranked gap list covering all four domains, saved for weekly review

Week 2

Landscape Industry Training and Professional Development & Safety Training and Workplace Safety Practices

  • Explain how adult learning principles (hands-on practice, spaced repetition, feedback) shape effective crew training sessions

  • Build a 20-minute toolbox talk outline on a single high-frequency hazard such as heat illness or string trimmer kickback

  • Identify the training documentation an employer must keep for new hires, equipment operators, and pesticide applicators

  • Describe how to evaluate whether a training session changed on-the-job behavior rather than only recalling facts

Your checkpoint

A complete toolbox talk package: outline, sign-in sheet template, and three-question comprehension check

Week 3

Safety Training and Workplace Safety Practices & Design, Installation, and Maintenance Project Excellence

  • Walk through the hierarchy of controls and apply it to three real landscape tasks: chainsaw felling, trenching for irrigation, and loading trailers

  • Outline required personal protective equipment for chemical handling, mowing, and chainsaw work, citing the hazard each item addresses

  • Sequence the steps of a job hazard analysis and produce one for a recurring task your crew performs weekly

  • Identify the safety controls specific to installation work: utility locating before digging, slope stability, and overhead power line clearance

Your checkpoint

A written job hazard analysis for one real task, including hazard, risk rating, controls, and responsible person

Week 4

Landscape Industry Training and Professional Development & Safety Training and Workplace Safety Practices & Design, Installation, and Maintenance Project Excellence

  • Summarize incident investigation basics: securing the scene, interviewing, root cause versus proximate cause, and corrective action follow-up

  • Describe emergency action plan elements for a landscape site, including communication, first aid, and severe weather response

  • Explain how safety performance metrics (recordable rate, near-miss reporting, inspection scores) are calculated and used

  • Connect training design to safety outcomes by identifying which training gaps most often precede common landscape injuries

Your checkpoint

A 10-question self-quiz on safety and training content scored at 80 percent or higher, with missed items logged

Week 5

Business Management and Industry Insights & Design, Installation, and Maintenance Project Excellence

  • Build a sample annual maintenance contract outline covering scope, visit frequency, exclusions, and renewal terms

  • Calculate a labor burden rate from base wage, payroll taxes, insurance, and paid time off, and apply it to a bid

  • Explain the difference between markup and gross margin and compute a selling price from a target margin

  • Identify the line items that most often cause residential installation jobs to lose money and how to estimate them defensively

Your checkpoint

A one-page bid worksheet with labor burden, material markup, overhead recovery, and target margin, checked against a worked example

Week 6

Business Management and Industry Insights

  • Compare pricing models (flat fee, time and materials, cost-plus, tiered packages) and state when each fits a landscape business

  • Draft a client communication sequence for a project from estimate through final walkthrough, including change-order handling

  • Describe how to read a basic job cost report and identify which variance lines demand action

  • Identify the business and legal considerations for hiring subcontractors versus employees, including insurance and licensing

Your checkpoint

A written client communication and change-order protocol covering estimate, approval, mid-project change, and closeout

Week 7

Business Management and Industry Insights & Design, Installation, and Maintenance Project Excellence

  • Outline a plant establishment care plan for the first 90 days after installation, including watering, mulch, staking, and inspection intervals

  • Explain soil preparation, drainage, and grading decisions that determine whether installations succeed long term

  • Sequence a maintenance visit checklist by season and justify each task's timing

  • Describe how to diagnose three common landscape failures (poor drainage, wrong plant for exposure, irrigation coverage gaps) and prescribe corrective action

Your checkpoint

A seasonal maintenance calendar for one property type with task, frequency, and the risk each task mitigates

Week 8

Landscape Industry Training and Professional Development & Safety Training and Workplace Safety Practices & Business Management and Industry Insights & Design, Installation, and Maintenance Project Excellence

  • Re-test all four domains with timed practice sets and record scores by domain

  • Review every item missed across weeks 1 through 7 and rewrite each as a one-line rule you can recall

  • Explain to a colleague, out loud, one key concept from each domain in under two minutes each

  • Finalize the 12-month development plan with the first credential application date and the training you will deliver to your crew

Your checkpoint

A final domain-by-domain score sheet plus a one-page consolidated review sheet of personal rules and the updated development plan

Milestones

Week 2: Can explain the four domains and their weights without notes, and has delivered or rehearsed one toolbox talk end to end

Week 4: Scores 80 percent or higher on the safety and training self-quiz and has a completed job hazard analysis for a real task

Week 6: Computes labor burden and a target-margin selling price correctly on a fresh example without referring to the worksheet

Week 8: Scores at least 75 percent in every domain on timed practice sets and has a written review sheet plus a dated 12-month development plan