Article 230 (services), Article 215 (feeders), Article 210 (branch circuits), and Article 220 load calculations. Expect questions on continuous versus noncontinuous loading, the dwelling small-appliance/laundry/bathroom rules, receptacle spacing, and the distinction between service point, service equipment, feeder, and branch circuit.
Concepts to own
- A continuous load operates 3 hours or more. Conductors and overcurrent devices: 125% of continuous plus 100% of noncontinuous (210.19(A), 210.20(A), 230.42).
- The overcurrent device protects the conductor; the conductor's corrected/adjusted ampacity must carry the load, with the next standard size allowed only under 240.4(B).
- 210.11(C): a dwelling needs two 20 A small-appliance circuits in the kitchen, one 20 A laundry circuit, one 20 A bathroom circuit.
- 210.52 spacing: receptacle outlets arranged so no point along the wall is more than 6 ft from an outlet (12 ft maximum spacing), including wall spaces 2 ft or wider.
- Service-entrance conductors sized per 230.42 from Table 310.16, generally using the 75 °C column for terminations.
Traps
Applying 125% twice; using the 90 °C column; counting the grounded conductor as current-carrying on a 120/240 V multiwire circuit; confusing "service" with "feeder" in a detached-building question; counting a bathroom receptacle as part of the kitchen small-appliance circuits.
Worked example
A 40 A continuous load: 40 × 1.25 = 50 A. Conductors must have an ampacity of at least 50 A and the overcurrent device is 50 A. 8 AWG copper at 75 °C (50 A) is the minimum; 6 AWG at 75 °C (65 A) gives margin for ambient correction or voltage drop.