Week 1

Air Distribution System Components and Terminology & Duct Design, Sizing, and Static Pressure

  • Sketch and label a complete air distribution system from return grille to supply diffuser, naming plenum, trunk, branch, takeoff, boot, and register at the correct locations

  • Define at least 25 core terms (CFM, FPM, velocity pressure, static pressure, total pressure, equivalent length, friction rate, aspect ratio, and similar) in your own words without copying a glossary

  • Match each fitting type (elbow, tee, wye, transition, offset, scoop, turning vane) to a sketch of where it appears in a residential and a light-commercial layout

  • Compute total external static pressure for a simple system by summing filter, coil, supply, and return drops you looked up or measured

Your checkpoint

A one-page labeled system schematic with a term list of 25+ definitions and a worked static pressure summation showing each component's pressure drop

Week 2

Duct Design, Sizing, and Static Pressure

  • Apply the equal-friction duct sizing method to size a trunk and three branches for a given CFM, target friction rate, and available static pressure

  • Calculate equivalent length for a run that includes two elbows, a transition, and a takeoff using fitting loss tables

  • Compare a low-aspect-ratio rectangular layout against a round layout for the same CFM and list the tradeoffs in pressure loss and space

  • Convert between velocity pressure, velocity, and CFM using the standard relationships and check your answers against a duct calculator

  • Identify the available static pressure budget after subtracting filter, coil, and grille allowances from blower total external static pressure

Your checkpoint

A sized duct layout table listing segment, CFM, velocity, friction rate, equivalent length, and computed pressure drop for every run, with totals that stay within the available static pressure

Week 3

Duct Design, Sizing, and Static Pressure & Airflow Measurement, Balancing, and Diagnostics

  • Explain how velocity pressure, static pressure, and total pressure relate at a measurement point and why a pitot tube reads velocity pressure

  • Describe the correct location for a duct traverse (straight-run distance upstream and downstream) and explain what happens to accuracy when you deviate

  • Perform a velocity traverse calculation from a set of pitot readings and convert average velocity to CFM

  • Select the right instrument (manometer, pitot tube, anemometer, flow hood, balometer) for a given measurement task and justify the choice

  • Distinguish system effect from fitting loss and give two examples of each

Your checkpoint

A traverse worksheet with raw readings, computed average velocity, computed CFM, and a written comparison of that result against the design CFM with a stated percentage difference

Week 4

Airflow Measurement, Balancing, and Diagnostics

  • Describe the proportional balancing method step by step, from identifying the index run to setting the last branch

  • Explain why you balance to the index circuit and what happens if you start with the branch closest to the fan

  • Diagnose three common airflow complaints (low flow at far register, high flow at near register, noisy register) and list the likely causes and the corrective action for each

  • Read a static pressure profile across a system and identify the segment with the largest unexplained loss

  • Explain how fan curves and system curves interact when a damper is added or a filter loads

Your checkpoint

A written balancing procedure for a one-trunk, four-branch system that names the index run, the adjustment order, and the target airflow for each branch, plus a diagnostic table of three complaints with causes and fixes

Week 5

Duct Installation, Sealing, and Insulation

  • Classify duct sealing methods (mastic, mesh-and-mastic, foil tape, aerosol, gasket) by where each is appropriate and where each fails

  • Explain the duct leakage classes and how a leakage test is set up, including what pressure the test runs at and what the result tells you

  • Select insulation R-value and vapor barrier strategy for a supply duct in an unconditioned attic versus a conditioned space

  • List the support spacing, sag limits, and clearance requirements that apply to flexible and rigid duct and state why each exists

  • Identify the top five installation defects that cause pressure loss or leakage and describe how to spot each on a walkthrough

Your checkpoint

A field inspection checklist of at least 15 items covering sealing, support, insulation, and clearances, each with a pass/fail criterion and a one-line reason it matters

Week 6

Duct Installation, Sealing, and Insulation & Indoor Air Quality, Filtration, and Ventilation

  • Explain how duct leakage and insulation defects in unconditioned space affect both energy use and the pressure boundary of the building

  • Describe how return duct leakage in an attic or garage can change the pressure of the house and pull in contaminants

  • Outline the steps of a duct leakage test to a specified pressure and state what a passing result requires

  • Explain the interaction between duct location, building envelope tightness, and ventilation requirements

  • Give three examples of how a duct repair changes measured airflow at the registers and how you would verify the change

Your checkpoint

A two-page case write-up of a duct system located in an unconditioned attic that links leakage and insulation defects to measured airflow, pressure boundary, and contaminant entry, with a prioritized repair list

Week 7

Indoor Air Quality, Filtration, and Ventilation

  • Compare MERV ratings and explain what each rating range captures and what it does not, including the pressure drop tradeoff

  • Explain how filter loading changes static pressure and airflow over time and how to account for it in design

  • Describe the purpose and basic intent of the main ventilation standards for residential and commercial spaces without quoting clause text

  • Calculate a required outdoor air quantity for a simple space from a per-person and per-area rate

  • Explain how pressure imbalances, humidity, and filtration interact to produce or prevent indoor air quality problems

Your checkpoint

A filter and ventilation selection sheet for a sample space showing required outdoor CFM, chosen filter MERV and its clean and loaded pressure drop, and a written justification for each choice

Week 8

Air Distribution System Components and Terminology & Duct Design, Sizing, and Static Pressure & Airflow Measurement, Balancing, and Diagnostics & Duct Installation, Sealing, and Insulation & Indoor Air Quality, Filtration, and Ventilation

  • Complete a timed practice set across all five domains and score each domain separately to find weak areas

  • Re-derive the key formulas (velocity pressure, CFM from velocity and area, equivalent length, available static pressure) from memory and check them

  • Review every missed item and write the correct reasoning in your own words rather than memorizing the answer

  • Re-read your week 1 term list and correct or expand any definition you now understand better

  • Build a one-page quick-reference sheet you can review in the final days before the exam

Your checkpoint

A scored practice result with a per-domain breakdown, a corrected-errors log with reasoning for each miss, and a finished one-page formula and concept reference sheet

Milestones

Week 2: You can size a trunk and three branches from a CFM and friction rate and show a total pressure drop that fits within the available static pressure without looking at a worked example

Week 4: You can state the index run, the adjustment order, and the target CFM for every branch of a four-branch system, and you score 70% or better on a self-made 20-question set covering domains 1 through 3

Week 6: You can explain, without notes, how attic duct leakage changes house pressure and contaminant entry, and your inspection checklist covers at least 15 items with pass/fail criteria

Week 8: You complete a timed all-domain practice set, score each domain separately, and every domain is at or above your target passing margin with a written errors log for every miss