Quick reference

Loop System Design Fundamentals

  • Heating-dominated loads typically require longer loop fields per ton than cooling-dominated loads because of lower ground temperatures and greater extraction.

  • Borehole spacing rule of thumb: 15–20 ft (4.5–6 m) center-to-center for vertical loops to limit thermal interference.

  • Total loop length depends on ground thermal conductivity, borehole thermal resistance, and peak block/ground loads-not just tonnage.

  • Vertical loop lengths often estimated at 150–250 ft per ton for residential, but must be verified by simulation or ASHRAE methods.

  • Hybrid systems (loop + cooling tower or boiler) can reduce loop size where peak loads are short-duration.

  • Series vs. parallel headers: parallel reverse-return equalizes flow; series increases velocity and pressure drop.

  • Minimum fluid temperature entering heat pump typically 25–40°F depending on antifreeze concentration; design must stay above freeze protection.

  • Loop design must account for long-term ground temperature drift, not just first-year performance.

Quick reference

Site Assessment and Load Calculation

  • Manual J (ACCA) or equivalent room-by-room load calculation is required for sizing; rules of thumb are not acceptable.

  • Ground thermal conductivity test (thermal response test) provides site-specific data for vertical loop design.

  • Site survey must identify utilities, setbacks, easements, soil/rock type, water table, and available land area.

  • Horizontal loop requires approximately 1,500–3,000 sq ft per ton depending on soil and climate; verify with design.

  • Soil classification (sand, clay, rock) affects drilling method, grout selection, and thermal performance.

  • Check local codes for well setbacks, groundwater protection zones, and required permits before design.

  • Load calculation should include block load and peak load; loop sizing uses both.

  • Document existing HVAC, insulation, and envelope conditions to validate load model inputs.

Quick reference

Loop Field Materials and Components

  • HDPE pipe for ground loops typically SDR-11 (e.g., 3/4" or 1" IPS) with pressure rating ≥160 psi at 73°F.

  • PE 3408/PE 3608 resin is common; pipe must meet ASTM D3035 or D2513 and NSF/ANSI 14 for potable water contact if applicable.

  • U-bend fittings: factory-fused or field-fused; use pre-manufactured U-bends with tested joints.

  • Grout: bentonite-based or cementitious thermal grout; permeability ≤1×10⁻⁷ cm/s where required.

  • Antifreeze: propylene glycol (food grade) or ethanol/methanol; concentration based on minimum loop temperature.

  • Headers: HDPE or copper manifolds; use reverse-return piping and isolation valves for each circuit.

  • Vaults: pre-cast or HDPE; must be traffic-rated if in vehicle areas and sized for valve access.

  • Flow center: circulator, expansion tank, air separator, and pressure relief valve; size for loop head loss.

Quick reference

Borehole and Trench Excavation

  • Vertical boreholes typically 4–6 in diameter, drilled to 100–400 ft depth; maintain plumbness within 1–2%.

  • Horizontal trenches usually 4–6 ft deep, 12–18 in wide; bottom must be free of sharp rocks and debris.

  • Maintain minimum separation between boreholes and property lines, wells, septic systems, and foundations per code.

  • Use drilling fluid (mud) or casing as needed to stabilize borehole in unconsolidated formations.

  • Trench bedding: sand or fine-gravel bedding around pipe; backfill in lifts and compact to avoid settlement.

  • Slope trench bottom to a low point for purging/drainage; avoid trapped air pockets.

  • Mark and protect buried utilities before excavation; call 811 or local one-call service.

  • Record as-built borehole depths, locations, and trench routes for future maintenance.

Quick reference

Pipe Joining, Fusion, and Pressure Testing

  • Butt fusion: heat pipe ends to 500°F ±10°F (260°C), apply interfacial pressure, cool undisturbed per pipe manufacturer's table.

  • Socket fusion: heat fitting and pipe simultaneously, insert fully, hold without twisting until cool.

  • Electrofusion: use fittings with barcode or input parameters; ensure clean, dry surfaces and proper scraping.

  • Pressure test: hydrostatic test at 1.5× design pressure (or per code) for at least 1 hour with no loss; isolate sections.

  • Test before backfilling; record test pressure, duration, and ambient temperature.

  • Inspect fusion joints for uniform bead, no gaps, and proper alignment; cut out and re-fuse defective joints.

  • Use only compatible HDPE materials and fittings; never mix different SDR or resin without manufacturer approval.

  • Air testing is not permitted for HDPE ground loops; always hydrostatic test with water.

Quick reference

Grouting and Backfilling

  • Grout from bottom up using tremie pipe to avoid voids and contamination; displacement method must fill annulus completely.

  • Thermal grout conductivity typically 0.8–1.4 Btu/(h·ft·°F); bentonite grout ~0.4–0.6.

  • Grout mix: bentonite or cement-bentonite with water per manufacturer; do not exceed water ratio.

  • Backfill trenches with approved material free of rocks >1 in; compact in 6–12 in lifts.

  • Provide sand or fines around pipe to prevent point loading; avoid direct contact with sharp aggregate.

  • In frost-susceptible areas, use frost-protected backfill or insulation above horizontal loops.

  • Grout must be placed within 24 hours of drilling or per code to prevent borehole collapse.

  • Document grout volume used vs. theoretical borehole volume to detect voids or overbreak.

Quick reference

Header, Manifold, and Vault Installation

  • Manifolds should be reverse-return or use balancing valves to equalize flow among circuits.

  • Install isolation valves on each circuit for flushing and maintenance.

  • Vault must be watertight, accessible, and sized for valve operation; use traffic-rated cover where required.

  • Support headers to prevent stress on fused joints; allow for thermal expansion/contraction.

  • Insulate exposed headers and fittings in vault to prevent condensation and freeze damage.

  • Pressure-test manifold and header assemblies before burying or enclosing.

  • Provide drain and air vents at high points; slope header to drain.

  • Label each circuit and valve with permanent tags for future balancing.

Quick reference

Circulating Fluid, Flushing, and Purging

  • Flush each loop individually at minimum 2 fps velocity to remove debris and air; use a flushing cart with filters.

  • Flush until discharge water is clear; then purge air by operating at high velocity and venting high points.

  • Antifreeze concentration must be verified with a refractometer and match design freeze protection.

  • Fill loop with filtered water and add corrosion inhibitors if specified; maintain pH 7–9.

  • Perform a final flow test and record flow rates per circuit; balance to design flow ±10%.

  • Air in loop causes poor performance and pump cavitation; use air separators and purge valves.

  • Do not use automotive antifreeze; use HVAC-grade propylene glycol or approved fluid.

  • After flushing, replace filters and verify no leaks under operating pressure.

Quick reference

Safety, Codes, and Environmental Compliance

  • Follow OSHA excavation rules: protective systems for trenches ≥5 ft deep, ladder access every 25 ft.

  • Call 811 before digging; wait required time and respect utility markings.

  • Use personal protective equipment: hard hat, safety glasses, gloves, steel-toe boots, and hearing protection.

  • Handle antifreeze per SDS; prevent spills to storm drains or waterways; dispose of waste per local regulations.

  • Grout and drilling fluids must be contained; prevent runoff into surface water.

  • Obtain required permits for wells, boreholes, and discharge of flushing water.

  • Lock out/tag out electrical and mechanical equipment before service.

  • Maintain MSDS/SDS for all chemicals on site and train workers on hazard communication.