NATE Ground Source HP Loop Installer flashcards
NATE Ground Source HP Loop Installer · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Borehole thermal resistance
- The resistance to heat flow between the circulating fluid and the borehole wall, influenced by pipe spacing, grout conductivity, and borehole diameter. Lower resistance improves loop performance.
- Block load
- The total simultaneous heating or cooling load of all connected spaces at a given time. Used with peak load to size loop fields and equipment.
- Reverse-return header
- A piping arrangement where the supply and return manifolds are connected so that each circuit has nearly equal pressure drop, promoting balanced flow without balancing valves.
- Thermal response test
- A field test that measures ground thermal conductivity and borehole resistance by injecting a known heat rate into a test borehole and monitoring fluid temperature response.
- Manual J
- ACCA's residential load calculation method that estimates room-by-room heating and cooling loads based on envelope, orientation, and internal gains; required for accurate sizing.
- Horizontal loop land area
- The ground area needed for a horizontal ground loop, typically 1,500–3,000 square feet per ton depending on soil, climate, and loop configuration.
- SDR-11 HDPE
- A standard dimension ratio for high-density polyethylene pipe where outside diameter is 11 times wall thickness; commonly used for ground loops with pressure ratings around 160 psi.
- Thermal grout
- A cementitious or bentonite-based grout with enhanced thermal conductivity, used to fill the annulus between borehole wall and loop pipe to improve heat transfer and seal the hole.
- Propylene glycol
- A food-grade antifreeze used in ground loop circulating fluid to prevent freezing; concentration must be selected based on minimum expected loop temperature.
- Borehole plumbness
- The vertical alignment of a drilled borehole, typically required to be within 1–2% of depth to ensure proper U-bend insertion and grout coverage.
- Trench bedding
- A layer of sand or fine gravel placed at the bottom of a trench to support loop pipe and protect it from sharp rocks and point loading before backfilling.
- One-call utility locate
- A service (such as 811 in the U.S.) that marks underground utilities before excavation; required by law in most areas to prevent damage and injury.
- Butt fusion
- A joining method where two pipe ends are heated to melting and pressed together; requires proper heating temperature, interfacial pressure, and undisturbed cooling time per manufacturer.
- Hydrostatic pressure test
- A test that fills the loop with water and pressurizes it to at least 1.5 times design pressure for a specified duration to verify joint integrity before backfilling.
- Fusion bead inspection
- Visual examination of a fused joint for a uniform, continuous bead around the circumference; gaps, misalignment, or uneven beads indicate a defective joint that must be cut out.
- Tremie grouting
- A method of placing grout from the bottom of a borehole upward using a pipe (tremie) to prevent voids and ensure complete filling of the annulus.
- Grout thermal conductivity
- A measure of a grout's ability to conduct heat, typically 0.8–1.4 Btu/(h·ft·°F) for enhanced thermal grouts; higher values improve borehole heat transfer.
- Backfill compaction
- The process of placing and compacting approved backfill material in lifts (usually 6–12 inches) to prevent settlement and maintain soil contact with loop pipes.
- Isolation valve
- A valve installed on each loop circuit or header branch to allow isolation for flushing, maintenance, or repair without draining the entire system.
- Traffic-rated vault
- An underground enclosure for headers and valves designed and labeled to support vehicle loads when installed in driveways, parking areas, or roadways.
- Manifold balancing
- The process of adjusting valves or using reverse-return piping to achieve design flow rates in each circuit, typically within ±10% of design.
- Loop flushing velocity
- The minimum flow speed (about 2 feet per second) used to scour debris and air from loop piping during flushing; higher velocities may be needed for larger pipes.
- Air purging
- The removal of trapped air from a loop by circulating fluid at high velocity and venting high points, often using a purge cart and air separator.
- Refractometer
- A handheld optical instrument used to measure the concentration of antifreeze in the loop fluid by refractive index, ensuring proper freeze protection.
- OSHA trench protective system
- A required method (sloping, shoring, or shielding) to protect workers in trenches 5 feet or deeper from cave-ins, per OSHA 29 CFR 1926 Subpart P.
- Safety Data Sheet
- A document required by OSHA that provides information on chemical hazards, handling, storage, and emergency procedures for products such as antifreeze and grout.
- Drilling fluid containment
- The use of berms, liners, or tanks to prevent drilling mud and cuttings from running into storm drains, waterways, or sensitive environmental areas.
- Well setback
- The minimum required horizontal distance between a borehole or loop and a water well, typically specified by local code to protect groundwater from contamination.
- PE 3408 resin
- A high-density polyethylene resin classification used for ground loop pipe, indicating minimum required strength and stress crack resistance under ASTM standards.
- Electrofusion joining
- A pipe joining method using fittings with embedded heating coils; an electrofusion machine applies current to melt and fuse the fitting to the pipe.
- Flow center
- A pre-assembled unit containing the circulator pump, expansion tank, air separator, and valves that circulates fluid through the ground loop and heat pump.
- Ground temperature drift
- Long-term change in ground temperature around a loop field caused by unbalanced annual heat extraction or rejection, which can degrade performance over time.