Grouting and backfilling questions focus on sealing the borehole, improving thermal contact, and restoring the trench. Know grout types, mixing, tremie placement, and backfill compaction.
Core rules
- Grout seals the borehole against surface water and aquifers and improves heat transfer by filling the annular space.
- Common grouts include bentonite, cement-bentonite, sand-cement, and thermally enhanced bentonite or graphite blends.
- Place grout from the bottom up with a tremie pipe; do not pour from the top.
- Backfill trenches with suitable material, compact in lifts, and install warning tape and surface restoration.
- Keep grout and backfill compatible with the pipe and the environment.
Worked example
A 240-ft borehole is 5 in in diameter and contains a 1.25-in U-bend. Borehole area = π × 2.5² = 19.6 in². Two pipes displace about 2 × 2.2 = 4.4 in². Annulus = 15.2 in² = 0.106 ft². Volume = 0.106 × 240 = 25.4 ft³. Add 10% for loss = about 28 ft³. Order grout by volume, not by bag count alone.
Traps
Grouting from the top; using neat cement that shrinks; skipping the tremie; backfilling before the test; failing to compact; not accounting for lost circulation.