NATE GS Installation study plan
NATE GS Installation · Give each week a clear focus.
8 weeks · About 6 hours per week
Air Distribution & HVAC Fundamentals
Explain how total external static pressure is built from supply and return duct losses, filter, coil, and grille resistance
Convert between cfm, velocity, and duct cross-sectional area for rectangular and round ducts using the continuity equation
Identify the components of a simple air distribution system: return grille, filter, blower, heat exchanger or coil, supply plenum, trunk, branches, and diffusers
Read a duct layout sketch and label each fitting that adds resistance (elbows, tees, transitions, takeoffs)
Your checkpoint
A one-page worked example computing velocity and friction loss for a 1,200 cfm trunk and two branches, with all units shown
Air Distribution & Refrigeration Cycle
Size supply and return ducts for a given cfm using a target friction rate and velocity limit
Describe how blower performance curves shift with static pressure and predict airflow change when a filter loads
Trace the refrigeration cycle states (compressor discharge, condenser outlet, metering device inlet/outlet, evaporator outlet) and name the phase at each point
Relate evaporator airflow and coil condition to sensible heat ratio and supply air temperature split
Your checkpoint
A table matching five airflow symptoms (low cfm, high cfm, uneven rooms, high static, short cycling) to likely causes and the measurement that confirms each
Air Distribution & Electrical
Balance a simple system on paper: set dampers to hit design cfm in each branch and explain the order of adjustment
Measure static pressure with a manometer and interpret readings across filter, coil, and plenum
Identify the electrical components in an air handler circuit: contactor, sequencer, relay, capacitor, transformer, and blower motor
Read a ladder diagram and trace the call-for-cool sequence from thermostat to blower and outdoor unit
Your checkpoint
A hand-drawn ladder diagram of a cooling call annotated with expected voltage at each test point
Electrical & Refrigeration Cycle
Calculate current, voltage, and resistance in series and parallel circuits with a meter, including start and run windings
Test a run capacitor and a compressor winding set for opens, shorts, and grounds, and state pass/fail criteria
Explain superheat and subcooling targets and how each shifts with load, airflow, and charge
Diagnose three charging scenarios (undercharge, overcharge, restricted metering device) from superheat, subcooling, and pressures
Your checkpoint
A diagnostic worksheet with measured pressures, temperatures, superheat, and subcooling for three practice scenarios and a written verdict for each
Piping and Ductwork & HVAC Fundamentals
Lay out a refrigerant line set with correct sizing, trapping, and support spacing, and explain why each rule exists
Describe brazing procedure: nitrogen purge, flux use, heat direction, and leak testing steps
Assemble and seal duct joints and explain the purpose of mastic, tape, and mechanical fasteners
Explain the psychrometric relationships among dry bulb, wet bulb, relative humidity, and dew point and use them to find coil entering and leaving conditions
Your checkpoint
A piping and ductwork checklist of at least 15 items with the code or manufacturer reason written next to each
Air Quality & Piping and Ductwork
Identify the three pollutant pathways (combustion products, moisture, volatile organics) and the control strategy for each
Explain how filter MERV rating, pressure drop, and airflow interact, and select a filter for a stated application
Describe duct leakage testing and why return-side leakage in an unconditioned space matters
Explain combustion air requirements and how to verify adequate ventilation for a gas appliance
Your checkpoint
A one-page air quality plan for a single-family home naming source control, ventilation, and filtration measures with a stated MERV and cfm
Safety and Codes & Electrical
State lockout/tagout, PPE, and refrigerant handling requirements for common service tasks
Identify electrical code requirements for disconnects, grounding, bonding, and overcurrent protection at the unit
Explain clearance, venting, and condensate disposal requirements that affect installation layout
List the personal and environmental hazards of refrigerant exposure and the recovery steps required
Your checkpoint
A safety and code review sheet covering ten items with the specific requirement and where it applies
Air Distribution & Refrigeration Cycle & HVAC Fundamentals
Complete a timed set of mixed-domain practice questions and score each domain separately
Re-teach the three weakest topics aloud from memory without notes
Re-perform the static pressure, superheat, and airflow calculations under time pressure
Build a one-page formula and reference card covering the highest-frequency calculations
Your checkpoint
A scored practice exam log by domain plus a final one-page reference card
Milestones
Week 2: Can size a trunk and branch for a given cfm and defend the friction rate and velocity chosen without notes
Week 4: Scores at least 70 percent on a mixed electrical and refrigeration practice set and can explain superheat and subcooling targets from memory
Week 6: Can state the correct MERV, ventilation rate, and duct leakage concern for a described home in under five minutes
Week 8: Scores at least 80 percent overall on the timed practice exam with no domain below 70 percent