DWC flashcards
DWC · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Verification
- Objective confirmation that specified requirements have been met, answering whether the item was built correctly according to the stated requirement, typically by inspection, analysis, demonstration, or test.
- Validation
- Confirmation that the delivered item fulfils its intended use or the user's needs, answering whether the correct item was built, usually assessed under actual or simulated operating conditions.
- Quality assurance versus quality control
- Assurance is preventive and process-oriented, building quality into how work is done; control is detective and product-oriented, measuring outputs against acceptance criteria after the fact.
- Corrective action
- Action taken to eliminate the cause of an already detected nonconformity so that it does not recur; it is distinct from containment, which only stops the immediate effect.
- Preventive action
- Action taken to eliminate the cause of a potential nonconformity or other undesirable situation before it occurs, usually triggered by trend analysis rather than an actual failure.
- Shall versus should
- In normative documents, shall marks a mandatory requirement subject to audit, should marks a recommendation where alternatives are permitted, and may marks a permissible option.
- Residual risk
- The risk that remains after existing controls have been applied; it is compared with the documented acceptability criterion to decide whether further treatment is required.
- SMART requirement
- A requirement framed as Specific, Measurable, Achievable, Relevant, and Time-bound so that it is singular, unambiguous, and verifiable by a defined method.
- Requirement traceability matrix
- A cross-reference table linking each requirement to its design element, realisation activity, verification method, and acceptance record, proving full coverage and exposing orphans.
- Work breakdown structure
- A hierarchical decomposition of total scope into manageable deliverable-oriented elements, governed by the 100% rule that children must sum exactly to the parent's scope.
- Critical path
- The longest total duration path through the activity network, which fixes the shortest possible project duration; every activity on it has zero total float.
- Total float
- The amount of time an activity can be delayed without delaying the project finish, calculated as Late Start minus Early Start or Late Finish minus Early Finish.
- Baseline
- The approved and version-controlled reference set for scope, schedule, or cost, against which performance is measured and which changes only through formal change control.
- Design review gate
- A formal checkpoint at which a design is assessed against defined exit criteria, and approval is recorded before work is released into the next phase.
- PDCA cycle
- Plan, Do, Check, Act: an iterative improvement loop that sets objectives, implements the process, measures results against objectives, and standardises or corrects accordingly.
- Change control board
- A designated body that reviews change requests for impact on scope, schedule, cost, risk, and compliance, then approves, rejects, or defers them and authorises baseline updates.
- Process capability index Cpk
- Cpk equals the minimum of (upper limit minus mean) or (mean minus lower limit), divided by three sigma; it accounts for mean off-centre and never exceeds Cp.
- RACI matrix
- A responsibility assignment grid marking who is Responsible for doing work, Accountable for the outcome with exactly one per activity, Consulted for input, and Informed of progress.
- Leading versus lagging indicator
- Leading indicators measure upstream conditions that predict future results, such as open corrective actions; lagging indicators report outcomes already realised, such as incident counts.
- Special cause variation
- Variation attributable to a specific assignable event rather than inherent process noise; it produces control chart signals and demands investigation of that occurrence, not process redesign.
- Hierarchy of controls
- A ranking of risk controls by effectiveness: elimination, substitution, engineering controls, administrative controls, and personal protective equipment as the least effective last resort.
- Lockout tagout
- An energy isolation procedure requiring isolation of the energy source, application of a lock and tag, release of stored energy, and verified zero energy state before work begins.
- Near miss
- An unplanned event that did not cause injury or damage but had genuine potential to do so, and is reported to expose failed or missing controls.
- ALARP
- As low as reasonably practicable: a test requiring risk to be reduced further unless the cost or difficulty of additional control is grossly disproportionate to the benefit gained.
- Permit to work
- A documented authorisation for a defined high-hazard task, valid for a stated location and period, recording the specified precautions, isolations, and signatures of issuer and receiver.
- Compliance obligations register
- A maintained list of every applicable legal and regulatory obligation, recording its source, accountable owner, evidence of fulfilment, and scheduled review date.
- Document control
- The system that assigns each controlled document a unique identifier, revision status, approval, effective date, and distribution, and withdraws superseded versions from use.
- Record
- Retained evidence that an activity was performed or a result obtained; unlike a document it is not revised, only corrected by an annotated, attributable addendum.
- Nonconformance report
- A record describing a failure to meet a specified requirement, its containment, its disposition such as rework, repair, concession, or reject, and the corrective action required.
- Hold point
- A stage in an inspection and test plan at which work must not proceed until the designated inspection has been performed and documented approval has been issued.
- Five Whys
- A root cause technique that repeatedly asks why a condition occurred, typically about five times, to move from the symptom to the underlying systemic cause.
- ALCOA principles
- Data integrity criteria for records: Attributable to a person, Legible, Contemporaneous at the time of activity, Original rather than a copy, and Accurate to the observation.