NBAA CAM study materials
NBAA CAM study resources

NBAA CAM cheat sheet

NBAA CAM · Keep the key ideas within reach.

Quick reference

Leadership and Management

  • Situational leadership: directing (low competence/high commitment), coaching, supporting, delegating (high competence/high commitment) - match style to follower readiness, not to personal preference.

  • Tuckman stages: forming, storming, norming, performing, adjourning; a new flight department team typically regresses to storming after any major staffing or mission change.

  • Maslow and Herzberg: pay and working conditions are hygiene factors that prevent dissatisfaction but do not motivate; responsibility, recognition, and advancement drive performance.

  • Span of control: a chief pilot directly supervising more than roughly 8-10 pilots or dispatchers loses effective oversight; add a lead or assistant chief before adding headcount.

  • Progressive discipline sequence: verbal coaching, written warning, performance improvement plan with measurable milestones and dated review, suspension, termination - document each step contemporaneously.

  • Termination risk rises when an employee can show protected activity (safety reporting, FAA whistleblower complaint under 14 CFR 129.5 / AIR-21) preceded the adverse action; timeline documentation is the defense.

  • FTE math: annual available hours per employee = 2,080 minus vacation, sick, training, and duty-rest overhead; a 24/7 dispatch desk needs about 4.2 FTE per continuously staffed seat.

  • Delegation rule: authority must equal accountability; a manager who retains approval on every decision has delegated task, not responsibility.

Quick reference

Business Aviation Operations

  • Operational control under Part 135 rests with the certificate holder and is exercised jointly by the pilot in command and the director of operations through an established flight-following and dispatch system; Part 91 operators retain it with the PIC.

  • Part 135 duty limits: 10 hours flight time in 24, 8 hours flight time in 24 for single-pilot or unscheduled operations with more than 8 passenger seats; 14 CFR 135.265 also caps duty at 14 hours and requires 10 consecutive hours rest in the preceding 24.

  • Part 91 vs 135 rest: Part 91 has no regulatory flight/duty limit - policy must impose one (common baseline: 14-hour duty day, 10 hours rest, 8 hours flight in 24).

  • Fuel: Part 91 IFR requires enough fuel to destination plus alternate plus 45 minutes; Part 135 flag or supplemental rules can require more - build the reserve into the release, not the crew's discretion.

  • International trip lead time: ePassport/APIS filings, overflight and landing permits (many states require 24-72 hours), and customs slots drive a realistic 72-hour planning minimum for new international destinations.

  • Stage length and utilization: annual utilization hours / block speed = approximate flight hours; a light jet at 350 knots and 300 hours per year flies about 85,000 nm.

  • Dispatch release content: weather, NOTAMs, fuel, alternate, weight and balance, MEL/CDL status, and ATC routing; the PIC must sign acceptance before departure.

  • Crew scheduling rule: build pairings to a 12-hour planned duty day so irregular operations (weather, ATC, maintenance) can be absorbed without exceeding limits.

Quick reference

Safety and Risk Management

  • SMS four components (ICAO Annex 19): safety policy and objectives, safety risk management, safety assurance, safety promotion - all four are required, not optional add-ons.

  • Risk matrix: likelihood (1-5) x severity (1-5); a 5x5 score of 15 or higher is typically unacceptable without executive sign-off and mitigation; 5 or below is broadly acceptable.

  • IS-BAO: voluntary, performance-based, audited by an accredited auditor; Stage 1 initial, Stage 2 full SMS-based system, Stage 3 highest maturity with a three-year audit cycle and annual progress reporting.

  • Just culture: honest error is not punished, reckless behavior is; the line between them is whether the person knowingly violated a rule or substituted their own risk assessment for the organization's.

  • Human factors: fatigue, complacency, and press-on-itis are the dominant causal factors in business aviation accidents; FRMS and a no-fault go-around/divert policy are primary mitigations.

  • Emergency response plan: must cover notification, family assistance, media, records preservation, and a designated go-team; test with a tabletop exercise at least annually and record findings.

  • Safety assurance loop: collect data (ASAP, FOQA/FDM, voluntary reports), analyze, implement corrective action, verify effectiveness, and feed the result back into the risk register.

  • Leading vs lagging indicators: hazard reports and audit findings per 100 flight hours are leading; accident and incident rates are lagging and too rare to manage by.

Quick reference

Aircraft Maintenance and Airworthiness

  • Airworthiness certificate is valid only while the aircraft meets its type design and is in a condition for safe operation; maintenance, preventive maintenance, and alterations must be performed per 14 CFR Part 43.

  • Annual inspection under Part 91 requires an IA-certificated mechanic; Part 135 operators use an approved continuous airworthiness maintenance program with a CAMP and a designated inspection program.

  • 100-hour inspection applies to aircraft carrying persons for hire (Part 135) and to flight instruction for hire; it may be exceeded by up to 10 hours to reach a place where inspection can be done, but the next interval is not extended.

  • AD compliance: must be accomplished within the stated interval; recurring ADs are tracked by calendar or hours, whichever comes first, and the record must show method, date, and signature.

  • MEL: an approved Minimum Equipment List permits dispatch with specified inoperative items under stated conditions; without an MEL, the operator uses the FAA master MEL or must repair before flight.

  • CDL (Configuration Deviation List) covers non-airworthiness-related missing exterior parts (fairings, seals); it is not a substitute for the MEL.

  • Maintenance tracking: airframe hours, cycles, engine hours, APU hours, and life-limited parts each have independent limits; a single 'total time' field is not sufficient.

  • Return to service: only an appropriately rated mechanic, repair station, or the pilot for authorized preventive maintenance may sign off; the logbook entry is the legal record.

Quick reference

Regulatory Compliance and Legal Issues

  • Part 91: no economic authority required, but cost-sharing is limited to the pro rata share of fuel, oil, and airport fees (14 CFR 61.113(c)); a private pilot may not pay less than their pro rata share.

  • Part 135: requires an FAA air carrier certificate and OpSpecs; the operator controls the flight, holds out to the public, and must meet crew, duty, maintenance, and training requirements.

  • Dry lease vs wet lease: a dry lease (aircraft only, no crew) may be arranged under Part 91; a wet lease or interchange involving crew and operational control generally requires Part 135 or 121 authority.

  • Time-sharing, interchange, and joint ownership are the only structures that let a Part 91 operator receive compensation for carriage; anything else that looks like holding out risks an illegal charter finding.

  • International: overflight and landing permits, APIS/eAPIS, customs and immigration, and ICAO differences from the host state's AIP must be confirmed before dispatch; the PIC is responsible for compliance with local rules.

  • Drug and alcohol testing: Part 135 operators must have an FAA-approved program covering pre-employment, random, reasonable suspicion, post-accident, and return-to-duty testing under 14 CFR Part 120.

  • Recordkeeping: pilot training and duty records, maintenance logs, and drug testing records have distinct retention periods; assume 12 months minimum for training records and longer where an AD or OpSpec specifies.

  • Registration: FAA registration is valid for seven years and must be renewed; an expired registration makes flight unlawful regardless of airworthiness status.

Quick reference

Business Management and Finance

  • Operating cost per hour = (fuel + maintenance reserve + crew + insurance + hangar) / annual hours; fixed costs (depreciation, management fee, insurance) do not fall with utilization, so cost per hour drops as hours rise.

  • Break-even utilization = annual fixed cost / (charter or hourly revenue per hour minus variable cost per hour); below this, ownership costs more than on-demand charter.

  • Depreciation: MACRS 5-year property for aircraft used in a trade or business, with mid-quarter convention if more than 40% of assets are placed in service in Q4; bonus depreciation rules change by tax year and must be verified.

  • Personal use of a business aircraft creates imputed income under the SIFL (Standard Industry Fare Level) formula; the value depends on aircraft weight and passenger status, and must be reported on the employee's W-2.

  • Section 1031 like-kind exchange no longer applies to aircraft after the Tax Cuts and Jobs Act; aircraft sales are taxable, so plan basis and depreciation recapture (25% on prior depreciation) before sale.

  • Pre-buy inspection and escrow: title search, lien release, and escrow closing are standard; a title defect or undisclosed lien transfers with the aircraft and is the buyer's problem.

  • Insurance: hull (agreed value vs stated value) covers the aircraft; liability covers bodily injury and property damage; a waiver of subrogation and additional insured endorsements protect the management company and lender.

  • Management fee structures: fixed monthly fee plus hourly, or cost-plus; compare total cost of ownership including crew salaries, training, and hangar against a fractional or jet card program at the actual annual hours.