NC Fire Sprinkler · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Fire Sprinkler System Design and Installation Standards & Fire Sprinkler System Components and Materials

  • Map the occupancy hazard classification scheme (light, ordinary Group 1 and 2, extra Group 1 and 2) and label ten real building types by class

  • Trace the design-approach decision tree: pipe schedule vs. hydraulic calculation, wet vs. dry vs. preaction, and when each applies

  • Build a one-page comparison of design density and remote-area requirements across all four hazard classes

  • Identify the five most commonly tested spacing rules (sprinkler spacing, branch-line spacing, deflector distance, obstruction rules) and write them from memory

Your checkpoint

A single hazard-class quick-reference sheet covering density, remote area, and maximum sprinkler spacing for all four classes, produced without notes

Week 2

Fire Sprinkler System Design and Installation Standards & Fire Sprinkler System Components and Materials

  • Differentiate the major sprinkler types (pendent, upright, sidewall, concealed, ESFR, residential) by application and temperature rating

  • Explain the function of each major component: alarm check valve, dry pipe valve, preaction valve, deluge valve, flow switch, and inspector's test connection

  • Diagram a wet system riser assembly from supply main through test connection, labeling every valve and gauge

  • Match pipe and fitting materials (black steel, galvanized, CPVC, copper) to the systems and environments where each is permitted

Your checkpoint

A hand-drawn riser diagram with every component labeled and a written note on when each valve type is used

Week 3

Water Supply, Hydraulics, and System Sizing & Fire Sprinkler System Design and Installation Standards

  • Perform a full hydraulic calculation by hand for a simple tree system using the density/area method, showing each step

  • Convert between flow, pressure, and pipe friction using the Hazen-Williams relationship and explain how C-factors change with pipe material and age

  • Calculate pressure loss through fittings using equivalent pipe length and explain when that shortcut is acceptable

  • Determine the required supply pressure at the base of the riser including elevation and device losses

Your checkpoint

A complete hand-calculated hydraulic worksheet for a 12-sprinkler tree system with density, remote area, friction loss, and total demand shown

Week 4

Water Supply, Hydraulics, and System Sizing

  • Interpret a water supply flow test curve and plot it against the system demand curve to find the safety margin

  • Explain how a storage tank, booster pump, or city main affects available pressure and when each is needed

  • Size a standpipe and sprinkler combination system given a fixed available supply

  • Identify the causes of insufficient supply and the accepted remedies for each

Your checkpoint

A plotted supply-versus-demand curve on graph paper with the safety margin calculated and a written recommendation for one remedial option

Week 5

North Carolina General Statutes Chapter 87, Article 2 and 21 NCAC Chapter 50

  • Outline the structure of North Carolina General Statutes Chapter 87, Article 2, including licensing, scope, and enforcement provisions

  • Summarize the key requirements of 21 NCAC Chapter 50 covering licensure, examinations, and continuing education

  • Explain the difference between a licensed sprinkler contractor, a certified installer, and an unlicensed helper under North Carolina rules

  • List the disciplinary grounds and penalties a licensee can face and the process that applies

Your checkpoint

A one-page statutory summary of Chapter 87, Article 2 and 21 NCAC Chapter 50 with the licensing, CE, and discipline requirements in your own words

Week 6

North Carolina General Statutes Chapter 87, Article 2 and 21 NCAC Chapter 50 & Contracting, Plans, Inspections, and Business Practices

  • Describe the plan submittal and review process in North Carolina, including who may prepare and seal plans and what must accompany a submittal

  • Explain the roles of the state fire marshal, local code official, and design professional in approval and inspection

  • List the required inspections from rough-in through final and what the inspector verifies at each

  • Identify the records a contractor must keep and the notification duties before covering work

Your checkpoint

A process flowchart from plan submittal to final inspection with the responsible party named at each step

Week 7

Contracting, Plans, Inspections, and Business Practices & Fire Sprinkler System Components and Materials

  • Draft a sample contract scope that allocates responsibility for design, permits, inspections, and as-built documents

  • Explain the acceptance testing sequence for a wet system, dry system, and preaction system, including hydrostatic and flow tests

  • Describe the maintenance and inspection intervals a contractor should communicate to an owner after turnover

  • Identify common change-order and liability pitfalls in sprinkler contracting and how to document them

Your checkpoint

A two-page sample scope-and-testing checklist a contractor could hand to a client at project start

Week 8

Fire Sprinkler System Design and Installation Standards & Water Supply, Hydraulics, and System Sizing & North Carolina General Statutes Chapter 87, Article 2 and 21 NCAC Chapter 50

  • Complete a timed 100-question practice set across all five domains and score each domain separately

  • Re-derive your weakest three calculations from scratch without reference material

  • Recite the licensing and continuing education requirements from memory

  • Review every missed question and write a one-line rule for each to prevent repeat errors

Your checkpoint

A scored practice exam with a domain-by-domain breakdown and a written list of rules for every missed item

Milestones

Week 2: Can label every component on a wet riser diagram and state the hazard class, density, and remote area for any building described to you, without notes

Week 4: Can complete a full hand hydraulic calculation and plot the supply-versus-demand curve with a correct safety margin in under 45 minutes

Week 6: Can explain North Carolina licensing, CE, and plan review requirements accurately enough to teach them to another candidate

Week 8: Scores at least 75 percent overall on the timed practice exam with no domain below 65 percent