Mistake 1

Treating the minimum casing length and grout column requirements as fixed statewide numbers instead of applying the rule's depth-based tiers, so a candidate answers with a single casing length for every well regardless of total depth.

Study guides often summarize casing and grouting tables as one headline number; candidates memorize that number and never learn that the required casing length and annular seal interval change with well depth and with the type of overburden penetrated.

What to do instead

Rebuild the casing and grout requirements as a depth-indexed table you write out by hand: for each depth band, list minimum casing length, minimum grout interval, and any gravel-pack or filter-pack exception. Then drill yourself with total-depth scenarios and state which tier applies before answering.

Mistake 2

Confusing the required annular seal interval with the total casing length, or assuming grout must always run the full length of casing, and picking the answer that sounds most conservative.

The two requirements appear together in the same rule section and both are expressed in feet, so candidates conflate them; the 'most conservative' instinct fails because some questions test the minimum that satisfies the rule, not the maximum.

What to do instead

For each question, write two separate lines before choosing: 'casing required = X ft' and 'seal required = Y ft, from surface to Z ft.' Answer only from those lines, and check whether the question asks for the minimum compliant value or the maximum permitted.

Mistake 3

Applying setback distances measured from the wrong reference point, such as measuring from the property line when the rule measures from the wellhead to a specific feature, or ignoring that different contamination sources carry different distances.

Setback tables list many features (septic systems, animal enclosures, fuel tanks, streams, property lines) with different distances, and candidates memorize a single 'magic number' instead of the feature-distance pairing.

What to do instead

Build a two-column flashcard set pairing each feature with its distance and its measurement reference point. Practice scenario questions by naming the feature first, then recalling the distance, then confirming the reference point before selecting.

Mistake 4

Answering siting questions using general hydrogeologic judgment (e.g., 'uphill and away from the septic field') instead of the specific regulatory distance or prohibition the question tests.

Field experience is genuinely useful and candidates lean on it, but exam items are written to the rule text; plausible-sounding best practice answers are frequently the distractors.

What to do instead

Separate the two in your notes: a 'good practice' column and a 'rule requirement' column. When a question cites a distance or a prohibition, answer from the rule column even if the practice column suggests something stricter or looser.

Mistake 5

Describing grouting procedure in the wrong direction or with the wrong method, e.g., saying grout is poured from the top down or that the annular space is filled before the casing is set, when the rule and standard practice require positive placement from the bottom up.

Candidates learn the material mix and the equipment but skim the placement sequence, and top-down pouring is an intuitive but non-compliant mental image.

What to do instead

Memorize the sequence as a numbered chain: set casing, run tremie or grout pipe to the bottom of the interval, pump grout until it returns at the surface, hold, then verify. Recite the chain aloud until the order is automatic, and flag any answer that describes gravity pouring from the top.

Mistake 6

Treating well abandonment as simply 'fill the hole with grout' and missing that different intervals (open borehole, casing, screened section) require different sealing materials and that the top must be capped and the site restored.

Abandonment is a short rule section compared with construction, so candidates under-study it and miss the interval-by-interval material requirements and the documentation and surface-restoration steps.

What to do instead

Write an abandonment checklist with one line per interval and one line per material, plus a final line for the cap and surface restoration. Practice by describing abandonment of a cased, screened well and a dry open-hole well side by side.

Mistake 7

Mixing up well development goals with drilling or rehabilitation goals, or choosing a development method that does not match the formation, such as surging a well completed in fine sand or overdeveloping a well until it produces sediment.

Development, drilling, and rehabilitation share vocabulary (surge, surge block, air lift, jetting, bailing), and candidates memorize method names without attaching each to the formation type and the purpose it serves.

What to do instead

Make a three-column table: method, formation it suits, and the outcome it produces. Add a warning row for each method describing the damage it can cause if misapplied. Test yourself by naming the formation first and then selecting the method.

Mistake 8

Confusing pump performance curve concepts, such as mixing up shutoff head with operating head, or assuming a pump delivers its rated flow at any depth, instead of accounting for total dynamic head and the pump setting depth.

Pump questions blend vocabulary from hydraulics with practical installation, and candidates who have installed pumps by rule of thumb skip the curve reading and the head calculation.

What to do instead

Practice reading a described curve in words: state shutoff head, state the flow at the design head, and compute total dynamic head as static lift plus drawdown plus friction loss. Do this for several described scenarios until the terms stop blurring.

Mistake 9

Answering permitting and licensing items from general contractor intuition rather than the specific statutory duties, such as who must sign the well record, when the record must be filed, and what work is exempt from licensing.

This domain is pure rule text with little field analogue, so experienced drillers answer from habit and miss the statutory actor, deadline, or exemption the item is testing.

What to do instead

Build a one-page 'who, what, when' sheet: who may perform which activity, what document must be submitted, and the deadline. Include the exemption list verbatim in your own words and review it weekly, since these items are easy points when memorized.

Mistake 10

Skipping the question stem's qualifiers, such as 'minimum', 'first', 'except', or 'before', and selecting the first technically true statement encountered.

Well driller items often present several true statements and ask for the one that is required first, the exception, or the minimum compliant value; candidates reading at speed answer the true statement rather than the asked one.

What to do instead

Adopt a fixed routine for every item: circle the qualifier, restate the question in your own words in one sentence, then evaluate each option as true or false against that restatement. Only then choose, and re-read the qualifier once more before moving on.