- Rated capacity
- The maximum load a digger derrick may lift at a given radius and configuration, equal to the lowest of structural, stability, winch, and auger limits shown on the load chart.
- Load radius
- The horizontal distance from the center of rotation to the center of the load, measured with the boom at its actual angle and extension, not along the boom.
- Load moment indicator
- A device that senses boom angle, length, and load to compute the load moment and warn or stop the operator before the rated capacity is exceeded.
- Anti-two-block device
- A switch that stops hoisting when the hook block approaches the boom tip too closely, preventing rope damage and load loss from two-blocking.
- Wire rope removal criteria
- Common criteria include six or more randomly distributed broken wires in one lay, three in one strand in one lay, or a ten percent diameter reduction.
- Outrigger float
- The pad or float attached to the outrigger beam that spreads the outrigger force over a larger ground area to reduce soil bearing pressure.
- Full outrigger spread
- Fully extending all outrigger beams and setting pads on stable, level ground, which is required for the highest capacity chart entries.
- Carrier leveling
- Using the outriggers to bring the carrier bubble level before lifting, so the load chart and stability calculations remain valid.
- Soil bearing capacity
- The allowable pressure the ground can support under an outrigger pad, used to size pads so the machine does not settle or tip.
- Utility tolerance zone
- The band on each side of a marked underground utility, commonly 18 to 24 inches, within which excavation must be by hand or vacuum.
- Minimum approach distance
- The closest distance any part of the machine, load, or personnel may come to an energized line, set by voltage and employer rules.
- Equipotential zone
- A work area where all conductive objects are bonded together so they remain at the same potential, protecting workers near energized lines.
- Pole grabber
- A hydraulically actuated attachment on the boom that clamps and holds a pole during lifting and setting, and whose weight reduces allowable load.
- Tag line
- A rope attached to the load and controlled by a ground worker to restrain rotation and swing without the worker touching the load.
- Digger motor
- The hydraulic motor that rotates the auger, producing high torque and a reaction force that the boom and turntable must resist.
- Auger torque reaction
- The counter-rotating force on the boom and turntable when the auger turns, which can swing the boom if not controlled.
- Pilot bit
- The center point on the auger that guides the bit into the soil and helps start the hole at the marked location.
- Signal person
- The single designated crew member who directs the operator with hand signals or radio, and whose stop signal must always be obeyed.
- Emergency stop signal
- A prearranged signal that any crew member may give to halt all machine motion immediately, regardless of who is directing the lift.
- Pre-lift meeting
- A briefing covering load weight, radius, rigging, signals, tag line assignments, exclusion zones, and emergency procedures before the lift begins.
- Swing radius
- The area swept by the boom, load, and counterweight during rotation, which must be barricaded and kept clear of personnel.
- Side loading
- Pulling or dragging a load sideways with the boom or auger, which is outside the load chart and can buckle the boom.
- Dynamic load
- Additional force from sudden starts, stops, or load release that can exceed the static rated capacity and overload the boom or rope.
- Pre-operation inspection
- The documented check of wire rope, hooks, hydraulics, safety devices, auger, and outriggers performed before each shift and after incidents.
- Boom deflection
- The downward bending of the boom under load, which increases actual radius and reduces capacity compared with the unloaded geometry.
- Winch line pull
- The maximum pulling force of the winch, rated at the bare drum and reduced as rope layers build up on the drum.
- Pole setting depth
- The depth the pole butt is buried, commonly about ten percent of pole length plus two feet, confirmed before backfill.
- Backfill compaction
- Compacting soil around a set pole to restore lateral support and uplift resistance, preventing the pole from leaning or pulling out.
- De-energized verification
- Confirmation by the utility that a line is de-energized, followed by visible grounding, before work within the minimum approach distance.
- Ground gradient hazard
- Voltage differences across the soil near a downed or contacted line that can injure workers through step and touch potential.
- Hand signal
- A standard arm and hand motion used by the signal person to direct boom, swing, hoist, and stop functions when radio is unavailable.
- Load chart configuration
- The specific boom length, outrigger spread, and counterweight setup that a load chart entry applies to, which must match the machine.