NCCCO Digger Derrick study materials
NCCCO Digger Derrick study resources

NCCCO Digger Derrick study plan

NCCCO Digger Derrick · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Digger Derrick Components, Terminology, and Load Charts & Stability, Outriggers, and Load Moment/Radius Management

  • Define every major digger derrick component and its function: boom, digger motor, auger, pole guide, winch, outriggers, turntable, and controls

  • Read a manufacturer-style capacity chart and state the capacity for at least five boom-length and radius combinations

  • Explain how radius is measured and how it differs from boom length and boom angle

  • Convert between working radius, boom angle, and load moment for three sample configurations

  • List the factors that reduce chart capacity: outrigger configuration, boom deflection, and load-line reeving

Your checkpoint

A one-page reference sheet with a labeled component list and five worked chart-reading examples showing radius, capacity, and the reason capacity changes

Week 2

Stability, Outriggers, and Load Moment/Radius Management & Site Evaluation, Setup, and Ground Conditions

  • Describe how the load moment indicator or rated capacity limiter warns and limits operation, and state the operator response to each warning stage

  • Identify the four outrigger deployment checks: full extension, pad contact, level machine, and firm footing

  • Evaluate three soil and site scenarios and decide where cribbing or matting is required

  • Explain the stability difference between outrigger and on-rubber operation and when each is permitted

  • Calculate the effect of a swinging load on stability using radius and load weight

Your checkpoint

A written setup checklist plus three site scenarios with a stability verdict and justification for each

Week 3

Pole Handling, Setting, and Lifting Operations & Stability, Outriggers, and Load Moment/Radius Management

  • Sequence a complete pole-setting operation from pre-lift planning through final release of the pole

  • Determine the required boom and radius for a given pole weight and set point without exceeding chart capacity

  • Explain how to control pole rotation and sway using tag lines and the pole guide

  • Identify the hazards of side loading the boom and the conditions that create it during pole handling

  • Describe the steps for setting a pole in an energized or congested right-of-way

Your checkpoint

A step-by-step pole-setting procedure with a sample lift plan that shows load weight, radius, chart capacity, and margin

Week 4

Digging Operations and Auger Use & Stability, Outriggers, and Load Moment/Radius Management

  • Describe auger selection factors including diameter, flighting type, and soil conditions

  • Explain the correct sequence for positioning, starting, and withdrawing an auger

  • Identify the causes of auger kickback and the controls that prevent it

  • State the procedure for handling a stuck auger without side loading the boom

  • Explain how spoil placement and hole integrity affect stability of the machine and the pole

Your checkpoint

A digging procedure card covering auger setup, kickback prevention, and stuck-auger recovery, plus a 15-question self-quiz scored at 80 percent or better

Week 5

Pre-Operation Inspection and Maintenance & Site Evaluation, Setup, and Ground Conditions

  • Perform a documented pre-shift walkaround inspection covering structural, hydraulic, electrical, and safety-device items

  • Distinguish between operator-level checks and items requiring a qualified mechanic

  • Interpret fluid levels, hose condition, and wear indicators against rejection criteria

  • Explain the purpose and test method for the load moment system, outrigger interlocks, and boom holding devices

  • Describe the daily and periodic maintenance items that affect lifting capacity and safe operation

Your checkpoint

A completed pre-shift inspection form with pass, fail, or monitor status for at least 25 line items and a short note on any item that would take the machine out of service

Week 6

Electrical Hazards and Utility Work Near Energized Lines

  • State the minimum approach distance concept and explain why distances vary with voltage and why the operator must confirm the utility's requirements

  • Identify the three primary electrical hazards: direct contact, arcing, and step or touch potential

  • Describe how an insulated or non-conductive boom affects hazard exposure and what it does not protect against

  • Explain grounding, equipotential matting, and bonding practices used in utility work

  • Outline emergency response for an electrical contact incident involving the machine

Your checkpoint

An electrical hazard job briefing sheet listing voltage-based approach concerns, required controls, and the contact emergency sequence

Week 7

Signals, Communication, and Personnel Coordination & Digging Operations and Auger Use & Pole Handling, Setting, and Lifting Operations

  • Demonstrate the standard hand signals for boom raise, lower, extend, retract, swing, and stop

  • Explain who is authorized to give signals and how to handle conflicting or unclear signals

  • Describe the signalperson and spotter duties during digging, pole handling, and blind lifts

  • Integrate communication into a multi-person operation with a utility crew and a flagger

  • Resolve a simulated communication failure scenario using the stop-and-verify rule

Your checkpoint

A hand-signal quick card plus a written scenario response describing a conflicting-signal event and the correct operator action

Week 8

Digger Derrick Components, Terminology, and Load Charts & Pre-Operation Inspection and Maintenance & Stability, Outriggers, and Load Moment/Radius Management

  • Re-take a full-length practice exam across all eight domains and record the score by domain

  • Re-work every missed item to identify whether the error was knowledge, chart reading, or misread question

  • Recite the ten highest-risk operator errors and the control that prevents each

  • Review chart-reading and stability calculations under time pressure

  • Build a final pre-test checklist for the day before and the day of the exam

Your checkpoint

A domain score report with a remediation list of no more than ten weak areas and a dated plan to close each before test day

Milestones

Week 2: Read a capacity chart cold and correctly state capacity for five radius and boom-length combinations with no reference sheet

Week 4: Score at least 80 percent on a self-made 15-question quiz on digging, auger use, and stability

Week 6: Explain electrical approach distances and the contact emergency sequence aloud in under five minutes without notes

Week 8: Achieve at least 85 percent overall on a full-length practice exam with no domain below 70 percent