NCCCO Drill Rig flashcards
NCCCO Drill Rig · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Allowable soil bearing pressure
- The maximum pressure soil can support without excessive settlement or shear failure. Pad area equals outrigger load divided by this value; soft fill and backfill require larger pads or matting.
- Minimum approach distance
- The closest a rig, boom, or load may come to an energized power line. It is voltage-dependent: 10 feet for lines up to 50 kV, increasing at higher voltages.
- Competent person
- A person capable of identifying existing and predictable hazards and who has authority to take prompt corrective action. Required for excavation, scaffolding, and many site safety decisions.
- Utility locate ticket
- A request to the regional one-call service that marks buried utilities before excavation. Treat unmarked ground as containing a hazard until proven otherwise.
- Spoil containment
- Control of drill cuttings, slurry, and contaminated soil so they do not enter storm drains or waterways. Includes berms, liners, and vacuum recovery.
- Level before mast raise
- The rig must be leveled within the manufacturer's tolerance, usually about one degree, before the mast is raised. Outriggers must be set on competent, stable pads.
- Wire rope removal criteria
- Rope is removed for broken wires exceeding the count for its construction, diameter reduction, severe corrosion, heat damage, or kinking. Follow rope manufacturer and OSHA guidance.
- Anti-two-block device
- A safety device that stops hoisting before the hook block contacts the boom tip. It must be tested and functional; a defective device removes the rig from service.
- Lockout/tagout
- Isolation of energy sources before maintenance or jam clearing. The rig is shut down, controls locked, and the tool landed or blocked before anyone works on it.
- Pre-shift inspection
- A documented check of fluids, hoses, wire rope, sheaves, brakes, safety devices, and fire extinguisher before each shift. Records are retained as evidence of compliance.
- Mast lock verification
- Confirmation that mast pins, locks, and safety devices are fully engaged before drilling. Personnel stay clear of the mast fall zone during raising and lowering.
- Hydraulic leak search
- Never use hands to find a pressurized leak. Use cardboard or paper to detect the pinhole stream, then relieve pressure before opening any fitting.
- Weight on bit
- The crowd force applied to the drill tool. Too much causes hole deviation, rod bending, and bit damage; too little causes slow penetration and bit polishing.
- Kelly alignment
- The kelly must align with the rotary table and bushing. Misalignment causes vibration, hole deviation, and rapid wear on the kelly drive and bushings.
- Hole cleaning
- Removal of cuttings at a rate matching penetration. Slowed returns or rising torque mean reduce penetration rate or increase flush volume before continuing.
- Temporary casing
- Steel pipe installed to hold unstable ground and control groundwater while drilling. Casing advancement must keep pace with drilling in caving formations.
- Tripping loads
- Hoisting loads during rod or tool changes must stay within the rig's rated capacity at the working radius, with the rotary stopped and the hole stabilized.
- Drilling record
- Per-hole documentation of depth, strata, penetration rate, fluid loss, and anomalies. It supports quality control and reveals conditions that affect safety.
- Stop-work conditions
- Conditions requiring drilling to stop: loss of returns, uncontrolled fluid flow, rig instability, or approach to an indicated utility. Reassess before resuming.
- Rated capacity
- The load a rig may lift in a specific configuration, from the load chart for that boom length, radius, counterweight, outrigger spread, and quadrant.
- Net capacity
- Gross chart capacity minus the weight of all lifting attachments, including hook block, slings, shackles, and any below-the-hook device.
- Load radius
- The horizontal distance from the center of rotation to the center of gravity of the load. Radius is not measured to the hook.
- Sling leg tension
- For a two-leg bridle, tension per leg equals half the load divided by the cosine of the angle from vertical. Flatter angles sharply increase tension.
- Sling angle effect
- As the angle from horizontal decreases, tension rises. A 60-degree angle gives about 1.15 times the load per leg; 30 degrees nearly doubles it.
- Critical lift
- A lift requiring a written plan, often when the load exceeds about 75 percent of chart capacity, passes over personnel, or uses multiple rigs.
- Shackle rating
- Working load limit based on the pin or bow size and marked on the shackle. Never exceed it, and never side-load a hook beyond the manufacturer's allowance.
- Outrigger reaction
- The load at each pad, determined by load moment and geometry. Chart capacities assume the specified pad support and level ground.
- Operator certification
- Crane operators under 29 CFR 1926 Subpart CC must be certified by an accredited body and evaluated. Rig-specific training and employer qualification are separate.
- Signal person qualification
- A qualified signal person is required whenever the operator cannot see the load or lift path. Hand signals must match the standard set.
- Fall protection threshold
- Employees on rigs or elevated platforms need protection at 4 feet in general industry and 6 feet in construction, or guardrails or a personal fall arrest system.
- Fatality reporting
- Fatalities must be reported to OSHA within 8 hours; in-patient hospitalizations, amputations, and eye loss within 24 hours. Preserve the scene and records.
- Emergency shutdown
- A means to stop the rig from the ground, plus a muster point, first aid and rescue capability, and a spill response plan, drilled before work starts.