NCCCO Drill Rig study materials
NCCCO Drill Rig study resources

NCCCO Drill Rig study plan

NCCCO Drill Rig · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Site and Operational Planning

  • Draft a complete pre-job site plan for a hypothetical drill rig job, listing access routes, exclusion zones, underground utility clearance steps, and spoil placement

  • Sequence the site planning checklist in the order work actually proceeds on a real job, from permit review to rig demobilization

  • Explain how soil bearing conditions and slope affect where a rig can be positioned and how to document that decision

  • Identify which site conditions require a written lift plan or engineered approval before mobilization

Your checkpoint

A one-page site planning checklist covering access, exclusion zones, utility clearance, spoil, and soil/slope review, applied to a written sample job scenario

Week 2

Site and Operational Planning & Drill Rig Setup, Inspection, and Maintenance

  • Write the setup sequence for leveling and stabilizing a drill rig on a prepared pad, including outrigger or track mat placement

  • List the pre-shift inspection items a competent person would check on a drill rig before operation begins

  • Describe how to verify rig stability after setup and what conditions force a re-check

  • Match each site planning decision from week 1 to the rig setup step it controls

Your checkpoint

A combined setup-and-inspection checklist of at least 20 items, each with the reason it matters and the failure it prevents

Week 3

Drill Rig Setup, Inspection, and Maintenance

  • Build a preventive maintenance schedule covering fluids, filters, wire rope, sheaves, pins, and safety devices with intervals

  • Diagnose three common rig faults from symptoms alone and state the inspection or repair action each requires

  • Explain wire rope inspection criteria including broken wires, wear, and when removal from service is required

  • Describe recordkeeping expectations for inspections, maintenance, and repairs

Your checkpoint

A maintenance log template with inspection intervals, acceptance criteria, and sign-off fields for a sample rig

Week 4

Drill Rig Operation and Production

  • Explain the drilling process from pad preparation through hole completion and how each stage affects production rate

  • Identify the variables that most often reduce penetration rate and how to test for each cause

  • Describe safe handling and connection procedures for tooling and drill string components

  • Explain how to monitor and respond to changes in return flow, torque, and penetration rate during drilling

Your checkpoint

A production troubleshooting table listing at least eight symptoms, likely causes, and the corrective action for each

Week 5

Drill Rig Operation and Production & Load Charts, Rigging, and Lifting

  • Read a load chart and determine capacity for a given radius, boom angle, and configuration without relying on memory

  • Apply deductions for attachments, rigging, and jib configuration to arrive at net allowable load

  • Calculate load weight and center of gravity for a multi-component pick and compare it to chart capacity

  • Identify rigging inspection rejection criteria for slings, shackles, and hooks

Your checkpoint

Five worked load chart problems with full calculations, including one that fails capacity and requires a revised lift plan

Week 6

Load Charts, Rigging, and Lifting

  • Draft a lift plan for a drill tooling or casing pick, including rigging selection, capacity check, and exclusion zone

  • Explain how wind, ground bearing, and swing affect capacity and when a lift must be stopped

  • Describe the roles of signalperson, operator, and lift director and the communication required

  • Identify the conditions that make a lift critical and require additional planning

Your checkpoint

A complete written lift plan for one sample pick, with capacity calculation, rigging list, and stop-work criteria

Week 7

Safety, Regulations, and Emergency Procedures

  • Map the regulatory requirements that govern drill rig operation to the specific practices they drive on site

  • Write the emergency response steps for rig collapse, struck-by, electrical contact, and injury scenarios

  • Explain lockout/tagout and energy isolation steps for rig maintenance and tooling changes

  • Describe the required actions and notifications after an incident or near miss

Your checkpoint

A one-page emergency action card covering four scenarios, each with immediate actions, notifications, and shutdown steps

Week 8

Site and Operational Planning & Drill Rig Setup, Inspection, and Maintenance & Drill Rig Operation and Production & Load Charts, Rigging, and Lifting & Safety, Regulations, and Emergency Procedures

  • Complete a full timed practice exam and score each domain separately to find weak areas

  • Re-study the two lowest-scoring domains using the checklists and tables built in earlier weeks

  • Rehearse load chart and rigging calculations under time pressure until accurate and fast

  • Review all personal error notes and confirm each mistake is understood and corrected

Your checkpoint

A scored practice exam with a written remediation list showing the specific errors corrected and the study action taken for each

Milestones

Week 2: Can produce a complete site planning and rig setup checklist from memory, with reasons for each item, in under 20 minutes

Week 4: Scores at least 80 percent on a self-made quiz covering site planning, setup, inspection, and production basics

Week 6: Solves a load chart problem with rigging deductions correctly and explains the result aloud without notes

Week 8: Scores at least 85 percent overall on a full timed practice exam with no domain below 75 percent