Lift Director stop-work authority
The Lift Director may halt any lift at any time for safety without seeking approval from the crane owner, site superintendent, or general contractor.
Gross load calculation
Gross load equals the weight of the load plus all rigging, the hook block, and any below-the-hook device. It must not exceed the chart capacity at the working radius.
Working radius definition
The horizontal distance from the crane's rotation center to the center of gravity of the load, measured with the boom in the planned configuration.
Net capacity definition
The published gross capacity from the load chart minus the weight of all lifting attachments such as the block, ball, slings, and spreader beam.
Sling angle tension formula
Tension per leg equals the load divided by the number of legs, then divided by the sine of the leg angle from horizontal. At 30 degrees, tension doubles.
Choker hitch capacity
A choker hitch reduces the sling's vertical rated capacity by a manufacturer-specified percentage, commonly around 75 to 80 percent, depending on sling type and choke angle.
Basket hitch capacity
A basket hitch can increase capacity over a vertical hitch when legs are vertical, but capacity decreases as the angle between legs widens.
Center of gravity control
The rigger locates the load's center of gravity and selects pick points so the load lifts level without unexpected rotation or tilt.
Tag line purpose
A tag line controls load rotation and drift. Handlers stay outside the fall zone and never wrap the line around a hand or body.
Shock loading avoidance
Slack is taken up slowly so the crane and rigging are not subjected to dynamic forces exceeding the static load used in the capacity calculation.
Two-blocking hazard
Two-blocking occurs when the hook block contacts the boom tip, damaging the crane and potentially dropping the load. Anti-two-block devices must be functional.
Side loading prohibition
Pulling or dragging a load sideways imposes forces the boom was not designed for and can cause structural failure. Side loading is not permitted.
Power line clearance rule
The crane and load must maintain the minimum required distance from energized lines. If that distance cannot be held, the line is de-energized and grounded.
Wind limit determination
The manufacturer's load chart wind speed governs, but the Lift Director also considers the load's sail area, which may require a lower limit than the crane's own rating.
Ground bearing pressure check
Outrigger or track reactions are compared to the soil's rated bearing capacity. Mats or cribbing spread the load over a larger area.
Underground hazard assessment
Voids, utility trenches, backfilled areas, slopes, and underground tanks can collapse under outrigger loads and must be identified before setup.
Swing radius barricade
The area the superstructure and load can reach must be barricaded to exclude non-essential personnel. Tail swing is a separate hazard from the load path.
Pre-lift meeting purpose
A documented meeting before the lift where the Lift Director reviews the plan, roles, signals, hazards, and emergency procedures with everyone involved.
Critical lift criteria
Employer or project criteria typically include loads over 75 percent of capacity, multiple cranes, personnel lifting, and lifts over occupied structures.
Multi-crane load sharing
Each crane's share depends on rigging geometry and the load's center of gravity, not simply half the load. Each crane must be rated for its share plus margin.
Personnel platform trial lift
Before lifting people, an approved platform is required, a trial lift is performed, and fall protection is verified for everyone in the platform.
OSHA 29 CFR 1926 Subpart CC
The federal construction standard for cranes and derricks. It addresses ground conditions, power line clearance, qualification of operators and riggers, and inspection.
Qualified rigger verification
The Lift Director confirms the rigger's qualification level matches the lift category, since critical lifts may require a certified rather than merely qualified rigger.
Operator certification check
The Lift Director verifies the operator's certification matches the crane type and capacity and that the operator is familiar with the specific model on site.
Pre-shift inspection record
The daily pre-shift inspection must be completed and documented before the crane is used. The Lift Director confirms the record exists.
Load weight verification
When the load weight is unknown, the Lift Director obtains a verified weight from shipping papers, a scale ticket, or a documented calculation rather than estimating.
Lift plan deviation rule
A longer radius, heavier load, softer ground, or higher wind invalidates the plan. Re-planning and re-authorization are required before the lift continues.
Most protective requirement rule
When OSHA, a state plan, the manufacturer's instructions, and site rules conflict, the requirement offering the greatest protection governs the lift.
Below-the-hook device inspection
Spreader beams, magnets, vacuum lifters, and clamps need current periodic inspections and a rated capacity at least equal to the load being lifted.
Single signal person rule
The Lift Director confirms one designated signal person, agreed signals or radio channel, and a tested emergency stop method before the lift begins.
Outrigger configuration rule
Load charts assume fully extended outriggers unless the chart states otherwise. Partial extension changes capacity and must be planned from the correct chart.
Post-lift closeout duties