NCCCO Mobile Crane study materials
NCCCO Mobile Crane study resources

NCCCO Mobile Crane cheat sheet

NCCCO Mobile Crane · Keep the key ideas within reach.

Quick reference

Site and Equipment Inspection

  • Pre-shift inspection covers wire rope, hooks, rigging, brakes, clutches, limit switches, LMI/RCL, outriggers, tires, fluid leaks, and alarms; correct defects before lifting.

  • Wire rope removal: 6 randomly distributed broken wires in one lay, 3 broken wires in one strand in one lay, wear exceeding 1/3 of wire diameter, or kinking/crushing.

  • Hook removal: cracks, deformation, throat opening increase greater than 15%, wear greater than 10% of original dimension, or missing/damaged safety latch.

  • Verify LMI/RCL and anti-two-block devices are powered, calibrated, and functioning; never bypass or disable safety devices.

  • Outrigger pads must distribute force over enough area to prevent settlement; check soil bearing, voids, utilities, and slopes under each float.

  • Level the crane within manufacturer tolerance before lifting; many charts require level within 1% of grade.

  • Inspect slings and rigging for cuts, broken wires, burns, knots, distorted hardware, and missing tags; remove damaged gear from service.

  • Check site for power lines, excavations, underground utilities, traffic, pedestrians, wind, and weather before setup and throughout the shift.

Quick reference

Crane Setup and Configuration

  • Extend outriggers fully and set floats on stable cribbing unless the load chart specifically covers a partial or on-rubber configuration.

  • Ground bearing pressure = total weight on each outrigger ÷ effective pad area; include crane, counterweight, load, and rigging.

  • Match load chart to actual boom length, jib, counterweight, outrigger spread, and reeving; a different configuration requires a different chart.

  • Barricade the swing radius and keep personnel clear of the counterweight and rotating superstructure.

  • Keep setup away from excavations, trenches, utility trenches, and buried utilities; maintain required slope setback and clearance.

  • Assemble boom and jib with correct pins, retainers, and reeving; confirm boom angle and length sensors read correctly.

  • Check that outrigger beams, jacks, and floats are free of damage and that beams are pinned or locked in the charted position.

Quick reference

Crane Operation

  • Avoid shock loading: start and stop smoothly, take up slack gradually, and never jerk a load.

  • Never leave the operator station with a load suspended; if leaving controls, lower load and secure crane.

  • Avoid side loading and dragging loads; boom and rope are designed for vertical lifting unless manufacturer approves otherwise.

  • Travel with a load only when the manufacturer's pick-and-carry chart permits it; keep boom low, load near ground, and travel slow.

  • Use anti-two-block device and warning; two-blocking can part wire rope and drop the load.

  • Plan multiple-crane lifts with equal load sharing, a qualified lift plan, and one designated leader/signalperson.

  • Stop operations when wind, lightning, visibility, or ground conditions exceed manufacturer or site limits.

  • Account for load swing, centrifugal force, and wind drift when swinging; use taglines to control rotation.

Quick reference

Load Chart Use and Capacity Determination

  • Radius is horizontal distance from crane center of rotation to center of the load/hook, not to boom tip.

  • Read capacity at the actual radius, boom length, quadrant/area, and configuration; if between chart radii, use the next longer radius.

  • Deduct from gross chart capacity: hook block, slings, spreader beams, jib, auxiliary boom head, and all below-boom-tip rigging.

  • Boom deflection increases actual radius and reduces capacity; verify radius after load is applied.

  • Capacity can differ by area of operation (over front, side, rear) and by outrigger spread; use chart for actual position.

  • Jib capacities are separate and lower; deduct jib weight and all rigging per chart notes.

  • Never exceed rated capacity; the load chart and manufacturer's operating manual govern.

  • On-rubber capacities apply only to specific pick-and-carry configurations and tire pressures; never use them for static lifts.

Quick reference

Communication and Hand Signals

  • Use standard ASME B30.5 hand signals; only one designated signalperson directs the operator at a time.

  • Any person may give an emergency stop signal, and the operator must stop immediately when it is given.

  • Test radio communication before the lift; agree on channel, voice signals, and a backup signalperson if communication fails.

  • If a signal is unclear or communication is lost, stop the operation until clear communication is restored.

  • Hoist signal: forearm vertical, forefinger pointing up, move hand in small horizontal circle.

  • Lower signal: arm extended downward, forefinger pointing down, move hand in small horizontal circle.

  • Stop signal: arm extended, palm down, move arm back and forth horizontally.

  • Dog everything signal: clasp hands in front of body.

Quick reference

Safety, Standards, and Operator Responsibilities

  • OSHA 29 CFR 1926 Subpart CC and ASME B30.5 set mobile crane requirements; manufacturer's manual and load chart take precedence when more restrictive.

  • Minimum approach distance to power lines: 10 ft for ≤50 kV; 15 ft for 50–200 kV; 20 ft for 200–350 kV; 25 ft for 350–500 kV; 35 ft for 500–750 kV; 45 ft for 750–1000 kV.

  • Operator has authority and duty to stop and refuse any lift that is unsafe or not in compliance.

  • Never operate a crane under the influence of alcohol, drugs, or medication that impairs judgment or reaction.

  • Inspections include shift, monthly, and annual/comprehensive; keep records and correct deficiencies before operation.

  • Only qualified riggers and signalpersons may perform those duties; verify qualifications before the lift.

  • Do not bypass, disable, or remove LMI/RCL, anti-two-block, or other safety devices.

  • Report accidents, near misses, damage, and malfunctions; remove crane from service until repaired and inspected.