NCCCO Mobile Crane study plan

NCCCO Mobile Crane · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Load Chart Use and Capacity Determination

  • Define gross capacity, net capacity, and maximum allowable load, and compute net capacity by deducting all lifting-gear weight from the chart value.

  • Locate the correct boom length and radius intersection on a manufacturer load chart for at least five different configurations.

  • Distinguish structural limits from stability limits and state which governs at short radius versus long radius.

  • Calculate working radius from measured boom angle and boom length using the cosine relationship, and verify against a tape measurement.

Your checkpoint

A worked problem set of 20 capacity problems with all arithmetic shown, scored at 85% or better.

Week 2

Load Chart Use and Capacity Determination & Crane Operation

  • Apply correct deductions (headache ball, load block, slings, jib, auxiliary sheave) to determine net capacity across 10 chart scenarios.

  • Determine when parts of line and rated line pull govern capacity instead of the boom table, and compute the effective limit.

  • Identify the chart notes and warnings that invalidate a capacity value, such as unlevel crane, outriggers not fully extended, side loading, and travel.

  • Sequence the pre-lift checks an operator completes before the first pick of a shift.

Your checkpoint

An 80% or higher score on a 30-question timed quiz covering load charts and pre-lift checks.

Week 3

Crane Operation

  • Set up and level a crane on outriggers, verifying float extension, pad contact, and that all tires are clear of the ground where required.

  • Calculate ground bearing pressure for a given outrigger load and select a mat size that keeps pressure under the soil capacity.

  • Manage radius by measuring at the load hook and accounting for boom deflection and load swing during the lift.

  • Sequence a lift plan covering hazard identification, rigging verification, signalperson briefing, and trial lift.

Your checkpoint

A written lift plan for a 5-ton pick at 40 ft radius, including hazard list, rigging selection, and signal plan.

Week 4

Crane Operation

  • Identify the conditions that require a critical lift plan and list the contents such a plan must contain.

  • Apply minimum approach distances to power lines for each voltage class and state the required actions following contact.

  • Describe safe practice for pick-and-carry, travel with a suspended load, and multi-crane lifts, including when each is prohibited.

  • Explain how wind, side loading, rapid swing, and boom flex affect stability and capacity.

Your checkpoint

A 40-question practice exam on Domain 3 completed at 80% or higher.

Week 5

Crane Setup and Configuration

  • Verify ground conditions, blocking, and levelness before any configuration change or assembly task begins.

  • Describe the assembly and disassembly sequence for boom sections, and state the duties of the assembly director and the pin and clip verification checks.

  • Confirm counterweight and jib installation checks and determine when a stowed or swing-away jib changes the load chart in use.

  • Position a crane on a sample site diagram, calculating clearances and confirming the planned area of operation.

Your checkpoint

A setup checklist of at least 25 items applied to a sample site description, with position and clearance calculations shown.

Week 6

Site and Equipment Inspection & Crane Setup and Configuration

  • Perform a documented pre-shift inspection covering fluids, tires, wire rope, hook and latch, limit switches, alarms, and outriggers.

  • Inspect wire rope samples and identify removal criteria including broken wires, kinks, crush damage, corrosion, and diameter reduction.

  • Separate daily, periodic, and annual inspection requirements and state the record-keeping obligation for each.

  • Confirm the load chart, operator manual, and capacity decals are present and match the crane's current configuration.

Your checkpoint

A completed mock inspection form on a scenario with 10 planted defects, with at least 9 of 10 correctly identified.

Week 7

Safety, Standards, and Operator Responsibilities & Communication and Hand Signals

  • List operator, signalperson, and rigger responsibilities under the applicable consensus standard and OSHA crane rules.

  • Demonstrate the 20 standard hand signals and the corresponding voice or radio commands, without reference.

  • Explain signalperson qualification requirements, when a signalperson is mandatory, and the operator's stop-work authority.

  • State the correct response when a signal is unclear, duplicated, or the load approaches a prohibited zone.

Your checkpoint

A recorded or instructor-witnessed demonstration of 20 hand signals plus a 20-question signals quiz scored at 90%.

Week 8

Load Chart Use and Capacity Determination & Crane Operation

  • Complete two full-length timed practice exams and break down the score by domain to rank remaining weak areas.

  • Re-drill every missed load chart item until accuracy on that item type reaches 95%.

  • Reproduce from memory a one-page reference sheet of capacity formulas, deduction rules, and approach distances.

  • Verify readiness on the two lowest-scoring domains with a focused 30-question set on each.

Your checkpoint

Two full-length practice exams at 85% or higher with no individual domain below 80%.

Milestones

Week 2: Net capacity calculated correctly on 8 of 10 chart scenarios, including all deductions and parts-of-line limits.

Week 4: Domain 3 practice exam passed at 80% or higher, and a complete written lift plan produced.

Week 6: Inspection defects identified at 90% or better, and boom assembly sequence described in correct order from memory.

Week 8: Two full-length exams at 85% or higher with every domain at 80% or above before scheduling the test.