NCCER Boilermaker study plan
NCCER Boilermaker · Give each week a clear focus.
8 weeks · About 6 hours per week
Boilermaking Safety and Tools
Match 15 common boilermaking hazards (hot work, confined space, elevated work, pinch points, stored energy, chemical exposure) to the specific PPE and control measure for each.
Sequence lockout/tagout and confined space entry steps for a vessel-entry scenario, including atmospheric testing order and permit sign-off points.
Identify the correct hand and power tool for six fabrication tasks and state the pre-use inspection finding that would cause you to reject each tool.
Select the correct fire extinguisher class and describe fire-watch duties and duration for cutting and welding operations.
Your checkpoint
A self-built one-page hazard-control matrix (15 hazards mapped to control and PPE) plus a closed-book 20-question safety quiz scored at 85% or better.
Oxyfuel Cutting, Welding, and Cutting Practices
Assemble an oxyfuel cutting outfit in the correct order (cylinders, regulators, flashback arrestors, hoses, torch) and list the leak-test step for every joint.
Distinguish neutral, oxidizing, and carburizing flames by appearance and state the correct flame for steel cutting, preheat, and brazing.
Describe how cutting oxygen pressure, tip size, and travel speed change kerf quality and dross formation.
Match common SMAW electrodes (E6010, E6011, E7018) to base metal, position, and current type, and name the defects caused by wrong amperage, arc length, and travel speed.
Your checkpoint
A hand-drawn labeled setup diagram and flame-adjustment chart reproduced from memory, plus 25 practice items on cutting and welding scored at 80% or better.
Oxyfuel Cutting, Welding, and Cutting Practices & Layout, Fabrication, and Blueprint Reading
Diagnose ten weld defects from written descriptions (porosity, slag inclusion, undercut, lack of fusion, cracking) and name the process variable most likely to cause each.
Extract scale, material, quantity, and revision data from the title block, revision block, and bill of materials of a sample fabrication drawing.
Identify line types, view placement, and dimensioning conventions used in third-angle orthographic drawings.
Decode ten welding symbols, reading size, length, pitch, and tail instructions from the reference line.
Your checkpoint
A ten-symbol weld-callout decoding sheet and a line-type/view reference card, each self-checked against a drawing key with no more than one error.
Layout, Fabrication, and Blueprint Reading
Project a third view from two given orthographic views and check each projected line for correct alignment.
Develop flat patterns for a cylinder and a truncated cylinder using parallel line development.
Calculate bend allowance and cut length for formed plate parts from given inside radii and thicknesses.
Compute plate area, weight from material density, and total weld length for a small assembly take-off.
Your checkpoint
A complete layout package for a cylinder-to-plate connection: dimensioned flat pattern, cut list, and weight/BOM table, checked against a self-written quality checklist.
Rigging, Lifting, and Material Handling
Identify wire rope, chain, and synthetic web slings and state the inspection findings that require removal from service.
Calculate tension per leg for two-leg and four-leg bridle hitches at 30, 45, and 60 degree horizontal angles.
Determine load weight, center of gravity, and the appropriate hitch type for a given vessel or structural component.
State standard crane hand signals and the correct placement of tag lines, softeners, and spreader beams.
Your checkpoint
A written rigging plan for a 6,000 lb exchanger shell: load weight, center of gravity, hitch type, sling size, tension per leg at 45 degrees, and tag-line placement, with all math shown.
Rigging, Lifting, and Material Handling & Boilers, Pressure Vessels, and Heat Exchangers
Select and describe safe use of chain falls, come-alongs, jacks, and roller skids for moving a horizontal vessel, listing the hold points for each device.
Distinguish firetube from watertube boiler construction and label the main pressure parts of each.
Identify pressure vessel components and interpret nameplate data, MAWP, and code stamp markings.
Your checkpoint
A ten-feature comparison chart of firetube versus watertube boilers plus a lifting-device selection table covering four material-handling scenarios.
Boilers, Pressure Vessels, and Heat Exchangers
Label the internals of a shell-and-tube heat exchanger (tubes, tubesheet, baffles, shell, channel, pass partition) and trace the flow path through a two-pass unit.
Describe tube rolling and expansion, gasket selection, and the bolt torque sequence for a flanged joint.
Outline a hydrostatic test procedure, including test pressure relative to MAWP, venting, and inspection hold points.
List boiler inspection points for tubes, tubesheets, staybolts, and refractory, and name the defect each inspection targets.
Your checkpoint
An annotated cross-section drawing of a shell-and-tube exchanger with 15 labeled parts and a written hydrostatic test procedure with numbered hold points.
Boilers, Pressure Vessels, and Heat Exchangers
Explain the causes and remedies for common boiler and exchanger failures: tube rupture, caustic embrittlement, erosion-corrosion, and gasket leakage.
Re-drill the two weakest topics identified in the week 4 and week 6 milestone checks until practice accuracy exceeds 85%.
Complete a timed full-length practice exam under exam conditions without notes or reference material.
Your checkpoint
A 100-question practice exam across all five domains scored at 85% or better, accompanied by an error log naming the domain and root cause for every missed item.
Milestones
Week 2: Set up and leak-test an oxyfuel outfit from memory in the correct sequence, and score 80% or better on a 25-item cutting/welding quiz.
Week 4: Score 80% or better on a timed 40-question mixed set covering Domains 1-3; any domain below 75% is scheduled for review during weeks 5-6.
Week 6: Narrate a complete lift from pre-lift meeting through load set-down without prompting, and score 80% or better on a 20-question rigging quiz.
Week 8: Score 85% or better on the full-length 100-question practice exam, with no single domain below 80% on the error-log breakdown.