Type X gypsum board
Gypsum panel with a glass-fiber-reinforced core, usually 5/8 in. thick, used where a fire-resistance rating is required in assemblies.
Panel weight per square foot
Regular 1/2 in. drywall weighs about 1.6 lb per sq ft, so a 4x8 sheet is roughly 51 lb; 5/8 in. Type X is about 2.2 lb per sq ft.
Screw spacing on walls
For single-layer screw attachment, space fasteners 8 in. on center along studs and panel edges; use 7 in. on center for ceilings.
Screw penetration into wood
Screws must penetrate wood framing at least 5/8 in.; drive heads just below the surface without breaking the paper facing.
Staggering panel end joints
Offset end joints between adjacent rows and from joints on the opposite face so four corners do not meet at one point, which reduces cracking.
Floor gap for expansion
Hold panel bottom edges about 1/2 in. above the floor and 1/4 in. from abutting walls so movement does not crack the finished surface.
Back-blocking butt joints
A method of reinforcing butt joints that fall between framing by gluing and screwing a strip of drywall behind the joint before taping.
Two-ply joint offset
In double-layer systems, offset face-layer joints at least 10 in. from base-layer joints and use longer screws to anchor the face layer independently.
Joint compound drying times
Setting-type compound cures chemically in 20-90 minutes; drying-type all-purpose compound needs about 24 hours per coat under normal conditions.
Level 4 finish
Tape plus three coats of compound over all joints, fasteners, and corners, then sanded smooth; the standard finish for most residential and commercial walls.
Level 5 finish
Level 4 plus a skim coat of compound over the entire surface, used where glossy paint or critical lighting would reveal joint and fastener shadows.
Feathering joint coats
Each successive coat is spread 2-4 in. wider than the previous one so the joint tapers smoothly into the surrounding panel surface.
Corner bead fastening
Press bead into compound on both flanges and fasten every 9-12 in.; fasteners must not protrude past the bead nose or they will show through.
Sanding grit selection
Use 120-150 grit to knock down ridges and 180-220 grit for final smoothing; light pressure and a side light reveal remaining defects.
Priming bare compound
Bare joint compound absorbs paint unevenly, so apply a drywall-specific primer before finish paint to equalize absorption and hide lap marks.
Texture test panel
Spray a scrap piece of board with the same compound, nozzle, pressure, and distance before texturing the wall to confirm the pattern matches.
Stud spacing for drywall
Wood framing is typically 16 or 24 in. on center; panels are oriented so long edges land on framing and joints are minimized.
Framing straightness tolerance
Studs and joists should be straight and aligned so the finished plane varies no more than 1/4 in. in 10 ft; plane or shim high spots.
Backing at panel edges
Install blocking or a continuous nailer wherever a panel edge does not land on framing, such as butt joints and around openings.
Resilient channel spacing
Fasten channel perpendicular to joists at 24 in. on center using screws no longer than 1 in. so they do not contact the framing and defeat isolation.
Control joint placement
Place control joints in walls and ceilings longer than 30 ft, at intersections of dissimilar substrates, and where framing changes direction.
Moisture-resistant board use
Water-resistant gypsum board with a treated core and face paper is used in bathrooms and behind tile; cement board is used in direct wet areas.
Blocking before close-in
Install wood blocking for cabinets, grab bars, and heavy fixtures before hanging board, then record the locations for later reference.
Ceiling framing alignment
Ceiling joists must be aligned and level so panels lie flat; low spots are shimmed or furred before the ceiling is hung.
Respirator for sanding
Drywall dust contains silica and gypsum; wear an N95 or P100 respirator during sanding and ventilate the work area.
Ladder setup ratio
Set an extension ladder with a 4:1 base-to-height ratio, maintain three points of contact, and keep the belt buckle between the side rails.
Drywall lift use
A mechanical lift holds ceiling panels in place for fastening; it reduces overhead lifting and replaces unsafe standing on buckets or sawhorses.
Cut-resistant gloves
Wear cut-resistant gloves and eye protection when scoring, snapping, and routing gypsum board with a utility knife.
Floor hazard control
Sweep offcuts, loose screws, and staples frequently; these are common puncture and trip hazards on drywall jobsites.
Scaffold guardrail height
Scaffold platforms must be fully planked with guardrails at 42 in. and midrails; climbing cross braces is prohibited.
Flat panel storage
Store panels flat on level blocking rather than leaning against walls, because leaning stacks can fall and the board can warp.
GFCI on jobsite
Use GFCI-protected circuits for power tools in wet or damp areas and inspect cords for damage before each use.