NCCER Drywall · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Drywall Installation & Framing and Substrate Preparation

  • Identify the components of a steel stud wall assembly (track, stud, runner, bracing, service hole) and state the function of each without notes

  • Calculate stud spacing, plate quantities, and fastener counts for three given room dimensions using the 16 in. and 24 in. on-center conventions

  • Explain how substrate flatness and stud alignment affect the final appearance of a gypsum board wall

  • List the standard gypsum board thicknesses and types (regular, moisture-resistant, fire-rated, abuse-resistant) and match each to a typical application

Your checkpoint

A one-page wall assembly checklist plus a quantity takeoff worksheet for three practice rooms, scored at 90% or better against an answer key you build yourself

Week 2

Framing and Substrate Preparation & Drywall Installation

  • Lay out a wall line from a given plan, including squaring a corner using the 3-4-5 method

  • Install or describe installation of floor and ceiling track with correct fastening intervals and allowance for deflection

  • Demonstrate framing openings for doors and windows with correct header, cripple, and jamb stud placement

  • Check stud plumb, crown orientation, and bridging requirements and correct at least three deliberate errors in a practice layout

Your checkpoint

A written framing sequence for a 12 ft by 16 ft room with one door and one window, including a marked-up sketch of stud and opening layout

Week 3

Drywall Installation & Safety and Jobsite Practices

  • Select the correct fastener type and length for gypsum board to wood, to steel stud, and for double-layer applications

  • Describe single-layer and double-layer attachment procedures, including fastener spacing in the field and at edges

  • Identify the personal protective equipment required for board handling, cutting, and screw gun use

  • Explain safe manual lifting and two-person carry techniques for 4 ft by 12 ft panels and the hazards of overhead board placement

Your checkpoint

A fastener selection table covering at least six substrate and application combinations, with a short justification for each entry

Week 4

Drywall Finishing & Drywall Installation

  • Cut and fit boards around openings, outlets, and corners with correct joint staggering and minimum edge distances

  • Explain the purpose of control joints, expansion joints, and back-blocking and where each is required

  • Describe the sequence for hanging ceilings versus walls and the reasons for that order

  • Identify common hanging defects such as broken board cores, overdriven fasteners, and insufficient end joints

Your checkpoint

A defect identification sheet listing eight hanging errors with cause and correction for each, verified against your own mock-up or photo set

Week 5

Drywall Finishing & Safety and Jobsite Practices

  • Mix and apply joint compound at taping, filling, and finishing consistencies and describe how consistency changes between coats

  • Apply paper or mesh tape and embed it without blisters, bubbles, or excess compound

  • Execute a three-coat finish and distinguish a Level 3, Level 4, and Level 5 finish by coat count and surface preparation

  • Set up dust control and ventilation for sanding, and select the correct respirator and eye protection for compound work

Your checkpoint

A finish level reference card plus a completed practice panel finished to Level 4 and photographed at each coat

Week 6

Drywall Finishing & Drywall Installation

  • Sand and inspect a finished surface under raking light, then mark and repair pinholes, ridges, and lap marks

  • Describe the treatment of inside corners, outside corners with bead, and butt joints versus tapered joints

  • Explain when to use corner bead, L-bead, J-bead, and control joint trim and how each is fastened

  • Identify the causes of joint cracking, photographing or listing at least five distinct causes

Your checkpoint

A repaired practice panel brought to Level 4 or better, with a before-and-after inspection log noting every defect found and the fix applied

Week 7

Safety and Jobsite Practices & Framing and Substrate Preparation

  • Build a jobsite hazard list covering falls, struck-by, silica and dust, electrical, and housekeeping exposures for drywall work

  • Describe scaffold, stilts, and ladder rules including load limits, guardrails, and setup on stable surfaces

  • Explain lockout and safe practice around temporary power, screw guns, and cutting tools

  • Describe housekeeping and material staging practices that protect board from moisture and damage and keep egress clear

Your checkpoint

A 15-item jobsite safety inspection checklist organized by hazard category, each item written as a pass or fail observation

Week 8

Drywall Installation & Drywall Finishing & Framing and Substrate Preparation & Safety and Jobsite Practices

  • Sequence a complete room from framing check through Level 4 finish and write the order of operations from memory

  • Answer timed practice questions across all four domains and record accuracy by domain

  • Diagnose your two weakest domains and re-drill the specific subskills identified

  • Recite key numeric standards such as fastener spacing, stud spacing, and finish level definitions without reference

Your checkpoint

A full timed practice test scored by domain, plus a one-page remediation plan naming the two weakest areas and the exact drills you will repeat

Milestones

Week 2: Can lay out and frame a wall with one opening, correctly placing track, studs, and header, and explain each spacing choice without notes

Week 4: Can hang a complete small room, including ceiling, with staggered joints and correct fastener spacing, and identify at least eight hanging defects

Week 6: Can deliver a Level 4 finish on a practice panel that passes a raking-light inspection with no visible ridges or pinholes

Week 8: Scores 80% or higher on a timed four-domain practice test and has a written plan for the two weakest domains