NCCER Glazier study plan
NCCER Glazier · Give each week a clear focus.
8 weeks · About 6 hours per week
Glazing Fundamentals and Safety
Define the glazier trade scope and list the common glass products, framing types, and job-site roles you will encounter, from flat glass to storefront and curtain wall
Identify the OSHA-style hazards specific to glazing: glass handling and breakage, cut injuries, pinch points, overhead loads, silica dust, and work at height
Select and inspect personal protective equipment for cutting, setting, and sealing glass, including cut-resistant gloves, safety glasses, and fall protection
Demonstrate safe glass carry, two-person lift, and setting techniques on practice lites, and explain when a vacuum lifter or crane is required
Your checkpoint
A one-page hazard-and-PPE checklist covering at least 10 glazing tasks, each matched to its control measure
Glazing Fundamentals and Safety & Glass and Glazing Materials
Explain how float glass is manufactured and how annealing, heat-strengthening, and tempering change its strength and break pattern
Distinguish annealed, heat-strengthened, and fully tempered glass by fracture pattern, edge condition, and required labeling
Identify laminated, insulating glass unit (IGU), wired, patterned, low-iron, and coated products and state one application for each
Read glass thickness, nominal size, and performance markings so you can verify a lite against the shop drawing
Your checkpoint
A product comparison table of at least six glass types with thickness range, break behavior, typical use, and one installation caution each
Glass and Glazing Materials
Describe how low-E coatings, sputter vs. pyrolytic coatings, and soft-coat handling rules affect which surface faces where in an IGU
Explain U-value, solar heat gain coefficient, visible light transmittance, and condensation resistance, and locate them on a typical glazing schedule
Identify edge deletion, desiccant, spacer, primary and secondary seal, and the causes of IGU seal failure and fogging
Recognize safety glazing locations and the marking requirements for tempered and laminated glass in doors, sidelites, and low wall areas
Your checkpoint
A written takeoff of one IGU from a sample schedule listing glass type, coating surface, spacer, overall thickness, and safety-glazing justification
Framing and Storefront Systems
Differentiate storefront, curtain wall, window wall, and interior partition systems by span, anchorage, and water-management strategy
Identify the components of an aluminum storefront: jamb, head, sill, mullion, transom, door frame, and the role of each in load transfer
Explain how sloped sills, weeps, baffles, and pressure-equalized cavities drain water out of a storefront system
Check substrate conditions for plumb, level, square, and embedment before framing, and document out-of-tolerance conditions
Your checkpoint
A labeled sketch of a storefront elevation naming at least 10 components and marking the drainage path from glazing pocket to weep
Framing and Storefront Systems & Installation of Glass and Glazing
Sequence the framing installation from layout and anchor setting through mullion assembly, squaring, and final anchorage
Install setting blocks, edge blocks, and glazing gaskets to the correct position so glass does not bear on the frame
Explain structural silicone, captured, and pressure-plate glazing methods and state when each is used
Verify anchor type, spacing, and fastener torque against the approved submittal before closing out a frame
Your checkpoint
A step-by-step installation sequence for one storefront opening, with the inspection checkpoint and tolerance at each step
Installation of Glass and Glazing
Plan a glass lift: verify opening size, choose suction-cup or crane equipment, set the travel path, and assign signal and tag lines
Set a lite into a frame using correct block placement, temporary shoring, and alignment checks without edge contact
Install gaskets, pressure plates, and covers in the correct order and confirm the glass is not pinched or overstressed
Identify rejection criteria for chipped edges, scratched coatings, and damaged spacers before the lite is set
Your checkpoint
A glass-handling and setting plan for one large lite, including equipment, crew roles, block locations, and a pre-set inspection checklist
Sealants, Weatherproofing, and Finishing
Select the correct sealant class for a joint by movement capability, adhesion substrate, and exposure, using manufacturer data rather than habit
Perform joint preparation: clean, abrade, prime, and install backer rod to the correct depth-to-width ratio
Tool a sealant joint to a consistent thickness and explain why three-sided adhesion and thin joints fail
Apply weather barrier lapping, flashing, and transition details that keep water out at sills, jambs, and heads
Your checkpoint
A sealant schedule for one project naming at least four joints, with sealant type, joint dimensions, backer rod size, primer, and cure time
Glazing Fundamentals and Safety & Glass and Glazing Materials & Framing and Storefront Systems & Installation of Glass and Glazing & Sealants, Weatherproofing, and Finishing
Complete a timed mixed-domain review and score at least 80 percent, then re-teach every missed item from source material
Walk through one full mock job from layout to final seal, stating the safety, material, framing, installation, and weatherproofing decision at each stage
Rehearse the calculations you are most likely to miss: glass weight, joint movement, and anchor spacing
Build a personal quick-reference sheet of the 20 facts you are most likely to forget on exam day
Your checkpoint
A scored 40-question practice set with a written correction note for each missed question and a final one-page reference sheet
Milestones
Week 2: Without notes, classify 10 glass samples or descriptions as annealed, heat-strengthened, tempered, laminated, or IGU, and explain the break pattern and one handling rule for each
Week 4: Draw and label a storefront section from memory, then trace the water path from glazing pocket to weep and name the function of every component you drew
Week 6: Deliver a complete glass-setting plan that a lead glazier would accept: correct equipment, correct block placement, no glass bearing on frame, and a stated inspection hold point
Week 8: Score at least 80 percent on a timed mixed-domain set of 40 questions and show a written correction for every miss, with no domain below 70 percent