NCCER Solar PV study materials
NCCER Solar PV study resources

NCCER Solar PV common mistakes

NCCER Solar PV · Understand the traps and how to avoid them.

Mistake 1

Treating the rapid shutdown requirement as satisfied by the module-level disconnect alone, and stating the controlled conductor limit as 80 V instead of 30 V within 30 seconds of shutdown initiation.

Candidates memorize 'rapid shutdown' as a slogan and conflate it with the inverter's DC disconnect or with the 80 V threshold used in other contexts, so they pick the wrong voltage and the wrong timing when a question asks what the array must achieve at the module or array boundary.

What to do instead

Drill the NEC 690.12 numbers separately: outside the array boundary, controlled conductors must be limited to 30 V within 30 seconds; inside the array boundary, 80 V within 30 seconds for the required boundary. Write both thresholds and both times on a scratch sheet before answering any rapid shutdown item, and check whether the question is asking about conductors inside or outside the array boundary.

Mistake 2

Selecting a DC conductor ampacity from the module's nameplate Isc directly, skipping the 1.25 multiplier for continuous current and the second 1.25 multiplier for conditions of use, and then sizing the OCPD from the same uncorrected number.

The module label gives Isc and Imp as measured values, and candidates treat them as design currents. The two-step multiplication (125% for continuous duty, then 125% again when the OCPD is not listed for 100% duty, plus temperature and conduit fill correction) is easy to collapse into one step under time pressure.

What to do instead

Build a fixed calculation sequence and rehearse it: start with Isc, apply 1.25, apply any second 1.25 required by the OCPD rating, then apply correction factors for temperature and raceway fill, then compare to the selected conductor's ampacity table value. Practice with three different modules and verify each answer against both the conductor and the OCPD requirement.

Mistake 3

Reading a string's maximum system voltage from the sum of Voc at STC and comparing it to the inverter limit, rather than using the coldest expected temperature to compute the highest Voc the string will ever see.

STC is 25 degrees C, and Voc rises as temperature falls. Candidates compute with the label Voc because it is the number printed on the datasheet, forgetting the temperature coefficient of Voc and the site's design low temperature.

What to do instead

Always compute maximum string Voc using the coldest design temperature and the Voc temperature coefficient (percent per degree C), then add the number of modules in series. Compute minimum string voltage at the hottest design temperature using Vmp so the inverter's MPPT window is still satisfied. Keep both calculations together so a question about either extreme triggers the correct one.

Mistake 4

Specifying rail and attachment spacing from the manufacturer's general table without adjusting for the actual module dimensions, the site's ground snow load, and the roof's exposure category, then presenting the layout as compliant.

Candidates see a span table and treat the first row as universal. Span ratings are conditional on module size, load case, attachment type, and the structural demand the question supplies, so a table lookup without matching the conditions produces a plausible but wrong spacing.

What to do instead

For any mounting question, first extract the design loads and the module dimensions from the prompt, then state which table column and row apply, then give the spacing. If the question supplies no load data, answer with the required verification step rather than a number.

Mistake 5

Performing the insulation resistance and polarity checks but skipping the open-circuit voltage and short-circuit current measurements at the string level before energizing the inverter, and recording only the inverter's own display readings.

Commissioning checklists often list 'verify array voltage' as one line, and candidates treat the inverter readout as equivalent to a field measurement. A reversed string or a mismatched string count can then pass unnoticed until the inverter faults.

What to do instead

Treat the string-level measurement as mandatory and independent: measure Voc and Isc per string with a meter rated for the array's maximum voltage, compare each string to the others and to the calculated values, record the irradiance and module temperature at the time, and only then close the DC disconnect. Know that a reversed string shows near-zero or negative voltage, not a low positive one.

Mistake 6

Using a standard clamp meter to measure string current on an operating array and treating the reading as a fault diagnosis, without recognizing that the meter's CAT rating and the array's DC voltage may exceed what the instrument is safe for.

Clamp meters are familiar from AC work, and candidates do not check the DC voltage rating or CAT rating before clamping a live string. They also forget that current measurement on a parallel string is affected by the other strings' contribution.

What to do instead

Before any live DC measurement, state the array's maximum voltage and confirm the meter's DC voltage and CAT rating exceed it. For fault isolation, use the inverter's per-string current data or a meter rated for the task, and remember that a string in parallel with others can show reverse current from the healthy strings into a faulted one.

Mistake 7

Answering a battery or hybrid system question by treating the inverter's AC output rating as the limit on charge and discharge current, and ignoring the manufacturer's DC charge current limit and the conductor ampacity between battery and inverter.

Candidates transfer grid-tied design habits to storage systems, where the battery-to-inverter DC circuit is a new current path with its own OCPD, disconnect, and ampacity rules that do not appear on the AC side.

What to do instead

For any storage item, draw the DC circuit separately from the AC circuit, list the charge and discharge current limits, size the DC conductors and OCPD from those, and confirm the disconnect location. Check whether the question is asking about the AC output, the DC battery circuit, or the charge controller.

Mistake 8

Describing the array's orientation as 'south-facing' from the site address or a compass bearing taken near metal or a vehicle, without correcting for magnetic declination or verifying with a tool on site.

South is treated as a fixed fact, and a phone compass reading is trusted. Magnetic declination, local magnetic interference, and roof geometry all shift the true azimuth, and shade studies built on a wrong azimuth give wrong production estimates.

What to do instead

State the true azimuth from a corrected compass or a solar pathfinder/site tool, note the declination correction, and check the reading away from metal and electronics. Pair the azimuth with the measured tilt and the shade survey so the design question can be answered from verified values rather than an assumption.

Mistake 9

Answering a grounding question by bonding the module frames to the rail with a listed clip and calling the array grounded, without distinguishing equipment grounding from functional grounding and without confirming the inverter's required grounding configuration.

The two grounding concepts sound alike, and the code path differs for transformerless versus transformer-based inverters. Candidates also assume a rail splice is electrically continuous without a listed bonding means.

What to do instead

For every grounding item, name which system is being bonded (module frames and racking, inverter enclosure, or a current-carrying conductor), name the bonding means (listed clip, lug, or jumper), and confirm continuity across rail splices. Check whether the inverter requires a grounded conductor or is a non-isolated design before answering.

Mistake 10

Diagnosing a low-production complaint by replacing the inverter first, without checking the easily verified causes: soiling, shade growth, a tripped string fuse, a ground fault, or a utility voltage excursion recorded in the inverter log.

The inverter is the visible component and reports the fault, so it gets blamed. Candidates skip the ordered diagnostic sequence and the data the inverter already stores, which usually points to the actual cause.

What to do instead

Use a fixed order: review the inverter event log and production history, compare strings, check for shade and soiling, test the array insulation resistance and grounding, then test the inverter. State the evidence that would confirm or rule out each cause before naming a replacement part.