NCCER Solar PV study plan
NCCER Solar PV · Give each week a clear focus.
8 weeks · About 7 hours per week
Solar PV Fundamentals and Safety
Define the photovoltaic effect and distinguish it from thermal solar collection, in writing, without notes
Identify the main PV system architectures (grid-tied, grid-tied with battery backup, stand-alone, hybrid) and state one site condition that favors each
List the shock and arc-flash hazards of DC circuits at module string voltages and explain why DC arcs are harder to extinguish than AC arcs
Apply the hierarchy of controls to a rooftop PV job: describe fall protection, lockout/tagout, and PPE choices for a given task
Recite the purpose of the NEC Article 690 sections that govern PV circuits and identify which sections cover disconnects, grounding, and marking
Your checkpoint
A one-page safety and fundamentals reference sheet you wrote yourself: PV effect summary, four system types with a use case each, DC hazard list, and PPE/fall-protection checklist
Solar PV Fundamentals and Safety & Solar PV System Components and Electrical Basics
Interpret a module datasheet: locate Voc, Isc, Vmp, Imp, Pmax, temperature coefficients, and the NMOT/NOCT ratings, and explain what each number is used for
Calculate string voltage at record-low cell temperature using the Voc temperature coefficient and explain why cold-weather voltage is the design driver
Compute maximum PV source-circuit current per NEC 690.8 and select conductor ampacity and overcurrent protection for a sample string
Distinguish PV source circuits, PV output circuits, and inverter output circuits and state which are energized when the DC disconnect is open
Explain the function of bypass diodes and blocking diodes and the failure symptom each prevents
Your checkpoint
A worked calculation set for one sample array: cold-temperature Voc, corrected Isc, conductor ampacity, and OCPD rating, each with the NEC reference cited
Solar PV System Components and Electrical Basics
Compare central string inverters, DC optimizers, and microinverters on shading tolerance, monitoring granularity, and serviceability, and justify a choice for a shaded roof
Size a battery bank for a defined critical-load list and backup duration, accounting for depth of discharge and round-trip efficiency
Explain the roles of the charge controller (MPPT vs PWM), rapid shutdown system, and DC/AC disconnects in a complete system one-line
Read and redraw a residential one-line diagram from memory, labeling every disconnect, OCPD, grounding point, and labeling requirement
Identify the grounded conductor and equipment grounding conductor requirements for a PV system and explain why PV source circuits are commonly ungrounded
Your checkpoint
A hand-drawn one-line diagram of a grid-tied PV system with battery backup, fully labeled with disconnects, OCPDs, grounding, and required placards
Site Assessment, Design, and Layout
Perform a shade analysis method: describe how to use a solar pathfinder or smartphone sun-path tool and interpret the resulting shade window
Evaluate a roof for orientation, tilt, azimuth, rafter spacing, and structural capacity, and record findings in a site-survey format
Calculate minimum row spacing for a tilted array to avoid inter-row shading at winter solstice for a given latitude
Size an array to an annual kWh target using an insolation value and a derate factor, showing every step
Identify code-driven layout constraints: roof access pathways, setback from ridge and edges, and rapid shutdown boundary
Your checkpoint
A completed site-survey and sizing package for one real or hypothetical address: shade report, roof sketch with dimensions, array layout drawing, and annual production estimate with assumptions listed
Site Assessment, Design, and Layout & Solar PV Installation and Mounting
Select mounting hardware for three roof types (comp shingle, standing seam metal, ground mount) and explain the flashing method for each
Lay out rail spacing and attachment points from the module clamp zones and the manufacturer's installation manual
Sequence a roof-mount installation from layout through module placement, and identify the inspection checkpoint before each step
Explain the structural and waterproofing risks of poor attachment and how to verify attachment into rafters or trusses
Plan a conduit run from array to inverter, including expansion, bend radius, and wet-location fittings
Your checkpoint
An installation work plan for one roof: hardware bill of materials, attachment layout sketch, step sequence with inspection checkpoints, and conduit routing diagram
Solar PV Installation and Mounting
Demonstrate the torque and clamping requirements for module terminations and racking connections and state the consequence of under- and over-torquing
Describe how to manage module handling, stacking, and walking on a roof without inducing microcracks
Install and dress MC4 or equivalent connectors correctly, including polarity check and pull test
Explain grounding and bonding of the racking system, including listed bonding hardware and continuity testing
Identify the labeling and placard set required at the service panel, disconnects, and inverter, and state where each goes
Your checkpoint
A step-by-step quality checklist for mechanical and electrical installation that you could hand to an installer, covering torque values, connector assembly, bonding continuity, and placard placement
Commissioning, Maintenance, and Troubleshooting
Build a commissioning sequence: visual inspection, continuity and polarity checks, insulation resistance, open-circuit voltage and short-circuit current measurements, and inverter startup
Interpret an I-V curve trace and explain what a stepped, low-current, or shifted curve indicates about a string
Diagnose three common faults from symptoms alone: a string producing zero current, a string producing low current, and an inverter tripping on grid voltage
Explain the maintenance schedule for modules, connectors, and inverters, including cleaning cautions and thermal imaging use
Describe safe troubleshooting practice for an energized array, including when to isolate and how to verify de-energization
Your checkpoint
A commissioning test sheet with expected values for a sample system plus a troubleshooting decision tree covering at least five fault symptoms and their likely causes
Solar PV Fundamentals and Safety & Solar PV System Components and Electrical Basics & Site Assessment, Design, and Layout & Solar PV Installation and Mounting & Commissioning, Maintenance, and Troubleshooting
Complete a timed, full-length practice set across all five domains and score each domain separately
Re-teach your three weakest topics from memory in writing, then verify against your notes and correct errors
Recite the key NEC Article 690 and 705 numbers you are most likely to be tested on: voltage drop, current correction factors, disconnect placement, and labeling
Walk through one end-to-end project scenario from site assessment to commissioning, naming the code requirement and safety control at each stage
Your checkpoint
A scored practice exam with a per-domain error log and a one-page 'weak spots' sheet listing each missed concept, the correct rule, and the page of your own notes that covers it
Milestones
Week 2: You can compute cold-temperature string Voc and corrected string current for a new module datasheet in under 15 minutes without referring to a worked example
Week 4: You can produce a site survey and array layout for an unfamiliar address, including shade window and production estimate, with all assumptions written down
Week 6: You can explain and sequence a complete roof-mount installation, naming the hardware, torque points, bonding method, and inspection checkpoints at each stage
Week 7: Given a set of commissioning readings, you can state whether the system passes and name the most likely fault if it does not
Week 8: Practice exam score is at least 80 percent overall with no domain below 70 percent, and every missed item is logged with its correct rule