NCCER Solar PV study materials
NCCER Solar PV study resources

NCCER Solar PV study plan

NCCER Solar PV · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Solar PV Fundamentals and Safety

  • Define the photovoltaic effect and distinguish it from thermal solar collection, in writing, without notes

  • Identify the main PV system architectures (grid-tied, grid-tied with battery backup, stand-alone, hybrid) and state one site condition that favors each

  • List the shock and arc-flash hazards of DC circuits at module string voltages and explain why DC arcs are harder to extinguish than AC arcs

  • Apply the hierarchy of controls to a rooftop PV job: describe fall protection, lockout/tagout, and PPE choices for a given task

  • Recite the purpose of the NEC Article 690 sections that govern PV circuits and identify which sections cover disconnects, grounding, and marking

Your checkpoint

A one-page safety and fundamentals reference sheet you wrote yourself: PV effect summary, four system types with a use case each, DC hazard list, and PPE/fall-protection checklist

Week 2

Solar PV Fundamentals and Safety & Solar PV System Components and Electrical Basics

  • Interpret a module datasheet: locate Voc, Isc, Vmp, Imp, Pmax, temperature coefficients, and the NMOT/NOCT ratings, and explain what each number is used for

  • Calculate string voltage at record-low cell temperature using the Voc temperature coefficient and explain why cold-weather voltage is the design driver

  • Compute maximum PV source-circuit current per NEC 690.8 and select conductor ampacity and overcurrent protection for a sample string

  • Distinguish PV source circuits, PV output circuits, and inverter output circuits and state which are energized when the DC disconnect is open

  • Explain the function of bypass diodes and blocking diodes and the failure symptom each prevents

Your checkpoint

A worked calculation set for one sample array: cold-temperature Voc, corrected Isc, conductor ampacity, and OCPD rating, each with the NEC reference cited

Week 3

Solar PV System Components and Electrical Basics

  • Compare central string inverters, DC optimizers, and microinverters on shading tolerance, monitoring granularity, and serviceability, and justify a choice for a shaded roof

  • Size a battery bank for a defined critical-load list and backup duration, accounting for depth of discharge and round-trip efficiency

  • Explain the roles of the charge controller (MPPT vs PWM), rapid shutdown system, and DC/AC disconnects in a complete system one-line

  • Read and redraw a residential one-line diagram from memory, labeling every disconnect, OCPD, grounding point, and labeling requirement

  • Identify the grounded conductor and equipment grounding conductor requirements for a PV system and explain why PV source circuits are commonly ungrounded

Your checkpoint

A hand-drawn one-line diagram of a grid-tied PV system with battery backup, fully labeled with disconnects, OCPDs, grounding, and required placards

Week 4

Site Assessment, Design, and Layout

  • Perform a shade analysis method: describe how to use a solar pathfinder or smartphone sun-path tool and interpret the resulting shade window

  • Evaluate a roof for orientation, tilt, azimuth, rafter spacing, and structural capacity, and record findings in a site-survey format

  • Calculate minimum row spacing for a tilted array to avoid inter-row shading at winter solstice for a given latitude

  • Size an array to an annual kWh target using an insolation value and a derate factor, showing every step

  • Identify code-driven layout constraints: roof access pathways, setback from ridge and edges, and rapid shutdown boundary

Your checkpoint

A completed site-survey and sizing package for one real or hypothetical address: shade report, roof sketch with dimensions, array layout drawing, and annual production estimate with assumptions listed

Week 5

Site Assessment, Design, and Layout & Solar PV Installation and Mounting

  • Select mounting hardware for three roof types (comp shingle, standing seam metal, ground mount) and explain the flashing method for each

  • Lay out rail spacing and attachment points from the module clamp zones and the manufacturer's installation manual

  • Sequence a roof-mount installation from layout through module placement, and identify the inspection checkpoint before each step

  • Explain the structural and waterproofing risks of poor attachment and how to verify attachment into rafters or trusses

  • Plan a conduit run from array to inverter, including expansion, bend radius, and wet-location fittings

Your checkpoint

An installation work plan for one roof: hardware bill of materials, attachment layout sketch, step sequence with inspection checkpoints, and conduit routing diagram

Week 6

Solar PV Installation and Mounting

  • Demonstrate the torque and clamping requirements for module terminations and racking connections and state the consequence of under- and over-torquing

  • Describe how to manage module handling, stacking, and walking on a roof without inducing microcracks

  • Install and dress MC4 or equivalent connectors correctly, including polarity check and pull test

  • Explain grounding and bonding of the racking system, including listed bonding hardware and continuity testing

  • Identify the labeling and placard set required at the service panel, disconnects, and inverter, and state where each goes

Your checkpoint

A step-by-step quality checklist for mechanical and electrical installation that you could hand to an installer, covering torque values, connector assembly, bonding continuity, and placard placement

Week 7

Commissioning, Maintenance, and Troubleshooting

  • Build a commissioning sequence: visual inspection, continuity and polarity checks, insulation resistance, open-circuit voltage and short-circuit current measurements, and inverter startup

  • Interpret an I-V curve trace and explain what a stepped, low-current, or shifted curve indicates about a string

  • Diagnose three common faults from symptoms alone: a string producing zero current, a string producing low current, and an inverter tripping on grid voltage

  • Explain the maintenance schedule for modules, connectors, and inverters, including cleaning cautions and thermal imaging use

  • Describe safe troubleshooting practice for an energized array, including when to isolate and how to verify de-energization

Your checkpoint

A commissioning test sheet with expected values for a sample system plus a troubleshooting decision tree covering at least five fault symptoms and their likely causes

Week 8

Solar PV Fundamentals and Safety & Solar PV System Components and Electrical Basics & Site Assessment, Design, and Layout & Solar PV Installation and Mounting & Commissioning, Maintenance, and Troubleshooting

  • Complete a timed, full-length practice set across all five domains and score each domain separately

  • Re-teach your three weakest topics from memory in writing, then verify against your notes and correct errors

  • Recite the key NEC Article 690 and 705 numbers you are most likely to be tested on: voltage drop, current correction factors, disconnect placement, and labeling

  • Walk through one end-to-end project scenario from site assessment to commissioning, naming the code requirement and safety control at each stage

Your checkpoint

A scored practice exam with a per-domain error log and a one-page 'weak spots' sheet listing each missed concept, the correct rule, and the page of your own notes that covers it

Milestones

Week 2: You can compute cold-temperature string Voc and corrected string current for a new module datasheet in under 15 minutes without referring to a worked example

Week 4: You can produce a site survey and array layout for an unfamiliar address, including shade window and production estimate, with all assumptions written down

Week 6: You can explain and sequence a complete roof-mount installation, naming the hardware, torque points, bonding method, and inspection checkpoints at each stage

Week 7: Given a set of commissioning readings, you can state whether the system passes and name the most likely fault if it does not

Week 8: Practice exam score is at least 80 percent overall with no domain below 70 percent, and every missed item is logged with its correct rule