NCCO · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Site and operational hazard awareness, load charts, and crane setup

  • Identify the four crane capacity-limiting factors (structural, stability, hydraulic, and rigging) and state which one governs a given lift scenario

  • Read and interpret a manufacturer load chart to find rated capacity for a specific radius, boom length, and quadrant, including deductions for jib and auxiliary head

  • Explain ground bearing pressure and describe how outrigger mats, cribbing, and flotation distribute load to soil

  • List site hazards that affect crane setup: slope, excavations, underground utilities, overhead power lines, and adjacent structures

  • Compute net capacity by subtracting the weight of all lifting attachments from the gross chart value

Your checkpoint

A one-page worked example set: three load-chart problems solved with radius, boom length, deductions, and net capacity shown step by step, plus a labeled sketch of a safe setup position on a hypothetical site

Week 2

Site and operational hazard awareness, load charts, and crane setup & Load dynamics, stability, and capacity determination

  • Determine crane configuration limits by matching boom length and jib combinations to the required lift radius and height

  • Calculate total load weight including rigging, slings, shackles, and hook block, and compare it against net capacity with a documented margin

  • Explain the effect of boom deflection, radius increase under load, and chart deductions for travel or pick-and-carry conditions

  • Describe how wind, side loading, and swing forces reduce usable capacity and when to stop operations

  • Interpret quadrants and swing restrictions on a load chart and apply them to a planned lift path

Your checkpoint

A lift plan for a single hypothetical lift: load weight breakdown, chosen configuration, chart page reference values, computed utilization percentage, and a written go/no-go decision with justification

Week 3

Rigging, sling and hardware selection, and load handling

  • Select sling type (wire rope, synthetic web, chain, roundsling) for a given load based on weight, surface, environment, and edge protection needs

  • Compute sling tension for vertical, choker, basket, and multi-leg bridle configurations using the load angle factor

  • Identify the working load limit markings on shackles, hooks, turnbuckles, and master links and verify compatibility with the sling assembly

  • Inspect slings and hardware for rejection criteria: broken wires, cuts, heat damage, stretched links, missing tags, and distorted hooks

  • Describe center-of-gravity determination and load balance for asymmetric and off-center lifts

Your checkpoint

A rigging selection worksheet for four different loads showing sling type, leg configuration, computed tension per leg, hardware WLL, and pass/fail against the required capacity

Week 4

Crane inspection, maintenance, and pre-operational checks & Safe operating procedures, signals, and communication

  • Perform a documented pre-operational walkaround covering wire rope, sheaves, hooks, brakes, outriggers, and safety devices, and record deficiencies

  • Distinguish between daily operator checks, periodic inspections, and annual certification responsibilities and who performs each

  • Demonstrate standard and emergency hand signals and describe radio protocol including designated signalperson and lost-communication stop rule

  • Explain the operator's authority to stop work for unsafe conditions and how to communicate a refusal professionally

  • Identify the function of limiters, anti-two-block devices, load moment indicators, and boom angle indicators and how to verify they work

Your checkpoint

A completed mock daily inspection checklist with at least five simulated defects noted and correctly classified as remove-from-service or monitor, plus a written hand-signal and radio-call script for one lift

Week 5

Load dynamics, stability, and capacity determination & Site and operational hazard awareness, load charts, and crane setup

  • Analyze load dynamics: swing, stopping, and hoisting acceleration effects on effective load and structural stress

  • Explain stability principles including counterweight, boom angle, tipping axis, and the difference between stability-limited and structural-limited ratings

  • Calculate ground bearing pressure for outrigger floats and compare it against assumed soil capacity for a given mat size

  • Determine when a lift requires a critical lift plan, engineering review, or two-crane analysis

  • Apply the load moment concept to explain why capacity falls as radius increases

Your checkpoint

A stability and ground-pressure analysis sheet for one lift: outrigger reaction estimates, mat sizing calculation, soil capacity comparison, and a dynamic-load allowance with reasoning

Week 6

Emergency procedures and incident response

  • Outline the immediate actions after a dropped load, contact with a power line, tip-over, or injured person, in correct priority order

  • Describe power line emergency procedure including staying in the cab versus exiting, and safe egress technique if fire forces exit

  • Explain how to secure the scene, preserve evidence, notify authorities, and document an incident factually

  • Identify the elements of an emergency action plan: roles, muster points, communication channels, and rescue considerations for elevated loads

  • Recognize warning signs of impending instability or failure and the correct response to each

Your checkpoint

A written emergency response playbook for three scenarios (power line contact, tip-over, injured rigger) with sequenced actions, notification list, and a one-page incident report template

Week 7

Regulations, standards, and operator responsibilities & Crane inspection, maintenance, and pre-operational checks

  • Map operator responsibilities to the governing framework: employer duties, operator duties, inspection records, and qualification requirements

  • Explain the role of the signalperson, rigger, lift director, and competent or qualified person in a lift

  • Describe recordkeeping obligations for inspections, maintenance, and operator certification and how long records are typically retained

  • Identify the consequences of operating outside rated capacity or without required inspections

  • State the operator's pre-lift checklist responsibilities that cannot be delegated

Your checkpoint

A compliance summary table linking at least eight operator duties to the corresponding standard or regulation reference and the record that proves compliance

Week 8

Practical operation and hands-on performance & Load dynamics, stability, and capacity determination

  • Execute a simulated pre-lift briefing covering hazard review, lift plan, signal protocol, and stop-work triggers

  • Perform a hands-on sequence: setup, leveling, pre-lift checks, controlled lift with signalperson, and safe shutdown

  • Demonstrate smooth control inputs to minimize load swing and explain each input aloud

  • Self-assess performance against a scored rubric and identify the two weakest skills for continued practice

  • Complete a timed mixed review of load chart and rigging calculations under exam conditions

Your checkpoint

A scored practical performance sheet from the simulated lift with rubric ratings, instructor or self-assessment notes, and a written remediation plan for the two weakest skills

Milestones

Week 2: Solve three unseen load-chart problems with correct net capacity and configuration selection, scoring at least 80 percent

Week 4: Complete a full pre-operational inspection and deliver correct hand signals for ten standard commands without reference

Week 6: Write and verbally walk through the emergency playbook for power line contact in correct priority order within five minutes

Week 8: Pass a timed 30-question mixed review across domains 1, 2, 5, and 7 at 80 percent or higher, and complete the simulated lift with no critical safety errors