NCIDQ IDFX study materials
NCIDQ IDFX study resources

NCIDQ IDFX cheat sheet

NCIDQ IDFX · Keep the key ideas within reach.

Quick reference

Programming and Site Analysis

  • Programming sequence: goals → facts → needs → concepts; problem seeking precedes design synthesis.

  • Area formula: net assignable area ÷ gross building area = efficiency ratio; typical office efficiency 0.75–0.85.

  • Adjacency matrix records required proximity on a 1–4 scale; a bubble diagram converts it into relative position, not dimensions.

  • Stacking diagram assigns floor levels by weighted adjacency, structural load, and vertical circulation demand.

  • Site circulation separates pedestrian, service, and vehicular paths; conflict points are minimized at building entries.

  • Solar orientation rule: long axis east–west reduces east/west glare; north light is the most stable daylight source for studios.

  • Wind rose shows prevailing direction frequency; winter wind protection and summer cross-ventilation drive entry and window placement.

  • Existing-conditions survey documents structure, MEP capacity, egress paths, and hazardous materials before design begins.

  • Space program includes occupancy count per room, which later sets egress width and fixture counts.

Quick reference

Space Planning and Conceptual Design

  • Clear width for a primary circulation path: 44 in (1,120 mm) minimum; secondary aisles 36 in (915 mm).

  • Wheelchair turning space: 60 in (1,525 mm) diameter circle or T-shaped space within a 36 in stem.

  • Reach ranges: 15–48 in above floor for forward reach; 9–54 in for side reach over an obstruction, per ADA.

  • Desk workstation module: 48–60 in wide × 60–72 in deep including circulation; panel height 42–60 in balances speech privacy and daylight.

  • Open-plan density rule of thumb: 100–150 usable sq ft per person in benching layouts; 150–250 sq ft in enclosed offices.

  • Conference room sizing: 20–25 sq ft per seat plus 2 ft clearance at the table edge for chair pull-out.

  • Kitchen work triangle: each leg 4–9 ft, sum of legs 13–26 ft.

  • Conceptual design deliverables: parti diagram, adjacency/bubble plan, massing study, and preliminary space allocation table.

  • Universal design principles: equitable use, flexibility, simple intuitive use, perceptible information, tolerance for error, low physical effort, size and space for approach.

Quick reference

Building Systems, Construction, and Interior Materials

  • Live load vs. dead load: dead load is self-weight of construction; live load is occupancy, furniture, and movable equipment.

  • Concrete fire-resistance is achieved by cover thickness over reinforcement; steel requires spray-applied fire-resistive material or encasement.

  • Wood framing: joist span tables govern depth; blocking and bridging control deflection and lateral movement.

  • HVAC sensible heat equation: Q (Btu/h) = 1.08 × CFM × ΔT; latent heat: Q = 0.68 × CFM × Δgrains.

  • All-air VAV systems serve multiple zones; fan-coil and induction units suit perimeter loads; radiant slabs suit high ceilings.

  • Plenum depth rule of thumb: 18–24 in for ducted distribution plus structure and sprinkler; verify with MEP coordination.

  • Acoustical ceiling tile NRC 0.55–0.90; gypsum board NRC ≈ 0.05 and is used for sound isolation, not absorption.

  • Material selection criteria: durability, maintenance, fire rating, VOC content, recycled content, and embodied carbon.

  • Adhesive and sealant VOC limits are set by SCAQMD Rule 1168; carpet cushion and carpet by CRI Green Label Plus.

Quick reference

Codes, Standards, and Regulations

  • Egress width: 0.2 in per occupant for sprinklered spaces, 0.15 in for corridors in unsprinklered occupancies (IBC values; confirm edition).

  • Travel distance limits vary by occupancy and sprinkler status; commonly 250 ft sprinklered, 200 ft unsprinklered for business.

  • Two exits required when occupant load exceeds 49 in most occupancies; common path and dead-end limits apply.

  • Exit access separation: two exits must be separated by at least one-half the diagonal of the floor area served.

  • Doors in a means of egress swing in the direction of travel when serving 50 or more occupants.

  • Accessible route: 36 in minimum clear width, 1:12 maximum ramp slope, 30 × 48 in clear floor space at fixtures.

  • Accessible parking: one van-accessible space per six accessible spaces; 96 in wide access aisle for van spaces.

  • Guard height 42 in at openings; handrail height 34–38 in above stair nosing.

  • Occupant load factors: business 100 gross sq ft per person; assembly unconcentrated 15 net sq ft per person.

Quick reference

Lighting, Acoustics, and Indoor Environmental Quality

  • Illuminance targets (IES): open office 300–500 lux, conference 300–500 lux, corridors 100 lux, drafting 750 lux.

  • Inverse-square law: illuminance falls with the square of distance from a point source; cosine law adjusts for incidence angle.

  • Lumen method: average maintained illuminance = (lamps × lumens × CU × LLF) ÷ area.

  • Color rendering index ≥ 80 for general interiors; ≥ 90 for color-critical retail and healthcare tasks.

  • Power density caps come from ASHRAE 90.1 or IECC; lighting controls required include occupancy sensors and daylight dimming in perimeter zones.

  • Reverberation time (Sabine): RT60 = 0.049 V ÷ A (imperial, ft) where A = total absorption in sabins.

  • STC rates partition isolation; NIC rates installed performance; background noise targets 30–40 dBA in offices, ≤ 35 dBA in classrooms.

  • Sound transmission loss increases about 6 dB per doubling of mass per unit area (mass law).

  • IEQ levers: outdoor air ventilation per ASHRAE 62.1, source control of VOCs, humidity 30–60% RH, and thermal comfort per ASHRAE 55.

Quick reference

Design Communication and Documentation

  • Drawing scales: plan 1/8 in = 1 ft typical for interiors; enlarged plan 1/4 in = 1 ft; detail 1 1/2 in = 1 ft.

  • Plan, elevation, section, and detail form the core drawing set; reflected ceiling plan shows ceiling and lighting layout.

  • Line weights: cut elements heaviest, visible elements medium, beyond-cut and grid lightest.

  • Finish schedule columns: room number, floor, base, wall, ceiling, and remarks; keyed to a finish legend.

  • Door and hardware schedule references door type, frame, hardware set, and fire rating.

  • Specification formats: MasterFormat for work results, UniFormat for assemblies, SectionFormat for the three-part section.

  • BIM LOD 100 is conceptual massing; LOD 200 generic placeholders; LOD 300 specific measurable elements; LOD 350 includes interfaces.

  • Construction document set typically includes cover, general notes, plans, elevations, sections, schedules, details, and specifications.

  • Revision clouds and delta symbols mark changes; addenda are issued during bidding, ASIs and bulletins during construction.

Quick reference

Professional Practice and Project Coordination

  • Standard AIA agreements: B101 owner–architect, A101 owner–contractor stipulated sum, A201 general conditions.

  • Basic services typically cover schematic design through construction administration; additional services are billed separately.

  • Fee structures: percentage of construction cost, lump sum, hourly, and cost plus fee.

  • Bidding methods: sealed competitive bid, negotiated, and design-build; CM at-risk holds trade contracts.

  • Payment cycle: contractor pay application → architect certification → owner payment; retainage commonly 5–10%.

  • Substantial completion starts warranty and owner use; final completion releases retainage and closes the contract.

  • Change order requires owner approval; construction change directive directs work before price agreement.

  • Standard of care is the skill and care of a reasonably prudent practitioner, not a warranty of perfection.

  • Professional liability insurance covers errors and omissions; general liability covers bodily injury and property damage.

Quick reference

Programming and Site Analysis

  • Programming sequence: goals → facts → needs → concepts; problem seeking precedes design synthesis.

  • Area formula: net assignable area ÷ gross building area = efficiency ratio; typical office efficiency 0.75–0.85.

  • Adjacency matrix records required proximity on a 1–4 scale; a bubble diagram converts it into relative position, not dimensions.

  • Stacking diagram assigns floor levels by weighted adjacency, structural load, and vertical circulation demand.

  • Site circulation separates pedestrian, service, and vehicular paths; conflict points are minimized at building entries.

  • Solar orientation rule: long axis east–west reduces east/west glare; north light is the most stable daylight source for studios.

  • Wind rose shows prevailing direction frequency; winter wind protection and summer cross-ventilation drive entry and window placement.

  • Existing-conditions survey documents structure, MEP capacity, egress paths, and hazardous materials before design begins.

  • Space program includes occupancy count per room, which later sets egress width and fixture counts.

Quick reference

Space Planning and Conceptual Design

  • Clear width for a primary circulation path: 44 in (1,120 mm) minimum; secondary aisles 36 in (915 mm).

  • Wheelchair turning space: 60 in (1,525 mm) diameter circle or T-shaped space within a 36 in stem.

  • Reach ranges: 15–48 in above floor for forward reach; 9–54 in for side reach over an obstruction, per ADA.

  • Desk workstation module: 48–60 in wide × 60–72 in deep including circulation; panel height 42–60 in balances speech privacy and daylight.

  • Open-plan density rule of thumb: 100–150 usable sq ft per person in benching layouts; 150–250 sq ft in enclosed offices.

  • Conference room sizing: 20–25 sq ft per seat plus 2 ft clearance at the table edge for chair pull-out.

  • Kitchen work triangle: each leg 4–9 ft, sum of legs 13–26 ft.

  • Conceptual design deliverables: parti diagram, adjacency/bubble plan, massing study, and preliminary space allocation table.

  • Universal design principles: equitable use, flexibility, simple intuitive use, perceptible information, tolerance for error, low physical effort, size and space for approach.

Quick reference

Building Systems, Construction, and Interior Materials

  • Live load vs. dead load: dead load is self-weight of construction; live load is occupancy, furniture, and movable equipment.

  • Concrete fire-resistance is achieved by cover thickness over reinforcement; steel requires spray-applied fire-resistive material or encasement.

  • Wood framing: joist span tables govern depth; blocking and bridging control deflection and lateral movement.

  • HVAC sensible heat equation: Q (Btu/h) = 1.08 × CFM × ΔT; latent heat: Q = 0.68 × CFM × Δgrains.

  • All-air VAV systems serve multiple zones; fan-coil and induction units suit perimeter loads; radiant slabs suit high ceilings.

  • Plenum depth rule of thumb: 18–24 in for ducted distribution plus structure and sprinkler; verify with MEP coordination.

  • Acoustical ceiling tile NRC 0.55–0.90; gypsum board NRC ≈ 0.05 and is used for sound isolation, not absorption.

  • Material selection criteria: durability, maintenance, fire rating, VOC content, recycled content, and embodied carbon.

  • Adhesive and sealant VOC limits are set by SCAQMD Rule 1168; carpet cushion and carpet by CRI Green Label Plus.

Quick reference

Codes, Standards, and Regulations

  • Egress width: 0.2 in per occupant for sprinklered spaces, 0.15 in for corridors in unsprinklered occupancies (IBC values; confirm edition).

  • Travel distance limits vary by occupancy and sprinkler status; commonly 250 ft sprinklered, 200 ft unsprinklered for business.

  • Two exits required when occupant load exceeds 49 in most occupancies; common path and dead-end limits apply.

  • Exit access separation: two exits must be separated by at least one-half the diagonal of the floor area served.

  • Doors in a means of egress swing in the direction of travel when serving 50 or more occupants.

  • Accessible route: 36 in minimum clear width, 1:12 maximum ramp slope, 30 × 48 in clear floor space at fixtures.

  • Accessible parking: one van-accessible space per six accessible spaces; 96 in wide access aisle for van spaces.

  • Guard height 42 in at openings; handrail height 34–38 in above stair nosing.

  • Occupant load factors: business 100 gross sq ft per person; assembly unconcentrated 15 net sq ft per person.

Quick reference

Lighting, Acoustics, and Indoor Environmental Quality

  • Illuminance targets (IES): open office 300–500 lux, conference 300–500 lux, corridors 100 lux, drafting 750 lux.

  • Inverse-square law: illuminance falls with the square of distance from a point source; cosine law adjusts for incidence angle.

  • Lumen method: average maintained illuminance = (lamps × lumens × CU × LLF) ÷ area.

  • Color rendering index ≥ 80 for general interiors; ≥ 90 for color-critical retail and healthcare tasks.

  • Power density caps come from ASHRAE 90.1 or IECC; lighting controls required include occupancy sensors and daylight dimming in perimeter zones.

  • Reverberation time (Sabine): RT60 = 0.049 V ÷ A (imperial, ft) where A = total absorption in sabins.

  • STC rates partition isolation; NIC rates installed performance; background noise targets 30–40 dBA in offices, ≤ 35 dBA in classrooms.

  • Sound transmission loss increases about 6 dB per doubling of mass per unit area (mass law).

  • IEQ levers: outdoor air ventilation per ASHRAE 62.1, source control of VOCs, humidity 30–60% RH, and thermal comfort per ASHRAE 55.

Quick reference

Design Communication and Documentation

  • Drawing scales: plan 1/8 in = 1 ft typical for interiors; enlarged plan 1/4 in = 1 ft; detail 1 1/2 in = 1 ft.

  • Plan, elevation, section, and detail form the core drawing set; reflected ceiling plan shows ceiling and lighting layout.

  • Line weights: cut elements heaviest, visible elements medium, beyond-cut and grid lightest.

  • Finish schedule columns: room number, floor, base, wall, ceiling, and remarks; keyed to a finish legend.

  • Door and hardware schedule references door type, frame, hardware set, and fire rating.

  • Specification formats: MasterFormat for work results, UniFormat for assemblies, SectionFormat for the three-part section.

  • BIM LOD 100 is conceptual massing; LOD 200 generic placeholders; LOD 300 specific measurable elements; LOD 350 includes interfaces.

  • Construction document set typically includes cover, general notes, plans, elevations, sections, schedules, details, and specifications.

  • Revision clouds and delta symbols mark changes; addenda are issued during bidding, ASIs and bulletins during construction.

Quick reference

Professional Practice and Project Coordination

  • Standard AIA agreements: B101 owner–architect, A101 owner–contractor stipulated sum, A201 general conditions.

  • Basic services typically cover schematic design through construction administration; additional services are billed separately.

  • Fee structures: percentage of construction cost, lump sum, hourly, and cost plus fee.

  • Bidding methods: sealed competitive bid, negotiated, and design-build; CM at-risk holds trade contracts.

  • Payment cycle: contractor pay application → architect certification → owner payment; retainage commonly 5–10%.

  • Substantial completion starts warranty and owner use; final completion releases retainage and closes the contract.

  • Change order requires owner approval; construction change directive directs work before price agreement.

  • Standard of care is the skill and care of a reasonably prudent practitioner, not a warranty of perfection.

  • Professional liability insurance covers errors and omissions; general liability covers bodily injury and property damage.

Quick reference

Space Planning and Conceptual Design

  • Clear width for a primary circulation path: 44 in (1,120 mm) minimum; secondary aisles 36 in (915 mm).

  • Wheelchair turning space: 60 in (1,525 mm) diameter circle or T-shaped space within a 36 in stem.

  • Reach ranges: 15–48 in above floor for forward reach; 9–54 in for side reach over an obstruction, per ADA.

  • Desk workstation module: 48–60 in wide × 60–72 in deep including circulation; panel height 42–60 in balances speech privacy and daylight.

  • Open-plan density rule of thumb: 100–150 usable sq ft per person in benching layouts; 150–250 sq ft in enclosed offices.

  • Conference room sizing: 20–25 sq ft per seat plus 2 ft clearance at the table edge for chair pull-out.

  • Kitchen work triangle: each leg 4–9 ft, sum of legs 13–26 ft.

  • Conceptual design deliverables: parti diagram, adjacency/bubble plan, massing study, and preliminary space allocation table.

  • Universal design principles: equitable use, flexibility, simple intuitive use, perceptible information, tolerance for error, low physical effort, size and space for approach.

Quick reference

Building Systems, Construction, and Interior Materials

  • Live load vs. dead load: dead load is self-weight of construction; live load is occupancy, furniture, and movable equipment.

  • Concrete fire-resistance is achieved by cover thickness over reinforcement; steel requires spray-applied fire-resistive material or encasement.

  • Wood framing: joist span tables govern depth; blocking and bridging control deflection and lateral movement.

  • HVAC sensible heat equation: Q (Btu/h) = 1.08 × CFM × ΔT; latent heat: Q = 0.68 × CFM × Δgrains.

  • All-air VAV systems serve multiple zones; fan-coil and induction units suit perimeter loads; radiant slabs suit high ceilings.

  • Plenum depth rule of thumb: 18–24 in for ducted distribution plus structure and sprinkler; verify with MEP coordination.

  • Acoustical ceiling tile NRC 0.55–0.90; gypsum board NRC ≈ 0.05 and is used for sound isolation, not absorption.

  • Material selection criteria: durability, maintenance, fire rating, VOC content, recycled content, and embodied carbon.

  • Adhesive and sealant VOC limits are set by SCAQMD Rule 1168; carpet cushion and carpet by CRI Green Label Plus.

Quick reference

Codes, Standards, and Regulations

  • Egress width: 0.2 in per occupant for sprinklered spaces, 0.15 in for corridors in unsprinklered occupancies (IBC values; confirm edition).

  • Travel distance limits vary by occupancy and sprinkler status; commonly 250 ft sprinklered, 200 ft unsprinklered for business.

  • Two exits required when occupant load exceeds 49 in most occupancies; common path and dead-end limits apply.

  • Exit access separation: two exits must be separated by at least one-half the diagonal of the floor area served.

  • Doors in a means of egress swing in the direction of travel when serving 50 or more occupants.

  • Accessible route: 36 in minimum clear width, 1:12 maximum ramp slope, 30 × 48 in clear floor space at fixtures.

  • Accessible parking: one van-accessible space per six accessible spaces; 96 in wide access aisle for van spaces.

  • Guard height 42 in at openings; handrail height 34–38 in above stair nosing.

  • Occupant load factors: business 100 gross sq ft per person; assembly unconcentrated 15 net sq ft per person.

Quick reference

Lighting, Acoustics, and Indoor Environmental Quality

  • Illuminance targets (IES): open office 300–500 lux, conference 300–500 lux, corridors 100 lux, drafting 750 lux.

  • Inverse-square law: illuminance falls with the square of distance from a point source; cosine law adjusts for incidence angle.

  • Lumen method: average maintained illuminance = (lamps × lumens × CU × LLF) ÷ area.

  • Color rendering index ≥ 80 for general interiors; ≥ 90 for color-critical retail and healthcare tasks.

  • Power density caps come from ASHRAE 90.1 or IECC; lighting controls required include occupancy sensors and daylight dimming in perimeter zones.

  • Reverberation time (Sabine): RT60 = 0.049 V ÷ A (imperial, ft) where A = total absorption in sabins.

  • STC rates partition isolation; NIC rates installed performance; background noise targets 30–40 dBA in offices, ≤ 35 dBA in classrooms.

  • Sound transmission loss increases about 6 dB per doubling of mass per unit area (mass law).

  • IEQ levers: outdoor air ventilation per ASHRAE 62.1, source control of VOCs, humidity 30–60% RH, and thermal comfort per ASHRAE 55.

Quick reference

Design Communication and Documentation

  • Drawing scales: plan 1/8 in = 1 ft typical for interiors; enlarged plan 1/4 in = 1 ft; detail 1 1/2 in = 1 ft.

  • Plan, elevation, section, and detail form the core drawing set; reflected ceiling plan shows ceiling and lighting layout.

  • Line weights: cut elements heaviest, visible elements medium, beyond-cut and grid lightest.

  • Finish schedule columns: room number, floor, base, wall, ceiling, and remarks; keyed to a finish legend.

  • Door and hardware schedule references door type, frame, hardware set, and fire rating.

  • Specification formats: MasterFormat for work results, UniFormat for assemblies, SectionFormat for the three-part section.

  • BIM LOD 100 is conceptual massing; LOD 200 generic placeholders; LOD 300 specific measurable elements; LOD 350 includes interfaces.

  • Construction document set typically includes cover, general notes, plans, elevations, sections, schedules, details, and specifications.

  • Revision clouds and delta symbols mark changes; addenda are issued during bidding, ASIs and bulletins during construction.

Quick reference

Professional Practice and Project Coordination

  • Standard AIA agreements: B101 owner–architect, A101 owner–contractor stipulated sum, A201 general conditions.

  • Basic services typically cover schematic design through construction administration; additional services are billed separately.

  • Fee structures: percentage of construction cost, lump sum, hourly, and cost plus fee.

  • Bidding methods: sealed competitive bid, negotiated, and design-build; CM at-risk holds trade contracts.

  • Payment cycle: contractor pay application → architect certification → owner payment; retainage commonly 5–10%.

  • Substantial completion starts warranty and owner use; final completion releases retainage and closes the contract.

  • Change order requires owner approval; construction change directive directs work before price agreement.

  • Standard of care is the skill and care of a reasonably prudent practitioner, not a warranty of perfection.

  • Professional liability insurance covers errors and omissions; general liability covers bodily injury and property damage.

Quick reference

Programming and Site Analysis

  • Programming sequence: goals → facts → needs → concepts; problem seeking precedes design synthesis.

  • Area formula: net assignable area ÷ gross building area = efficiency ratio; typical office efficiency 0.75–0.85.

  • Adjacency matrix records required proximity on a 1–4 scale; a bubble diagram converts it into relative position, not dimensions.

  • Stacking diagram assigns floor levels by weighted adjacency, structural load, and vertical circulation demand.

  • Site circulation separates pedestrian, service, and vehicular paths; conflict points are minimized at building entries.

  • Solar orientation rule: long axis east–west reduces east/west glare; north light is the most stable daylight source for studios.

  • Wind rose shows prevailing direction frequency; winter wind protection and summer cross-ventilation drive entry and window placement.

  • Existing-conditions survey documents structure, MEP capacity, egress paths, and hazardous materials before design begins.

  • Space program includes occupancy count per room, which later sets egress width and fixture counts.

Quick reference

Space Planning and Conceptual Design

  • Clear width for a primary circulation path: 44 in (1,120 mm) minimum; secondary aisles 36 in (915 mm).

  • Wheelchair turning space: 60 in (1,525 mm) diameter circle or T-shaped space within a 36 in stem.

  • Reach ranges: 15–48 in above floor for forward reach; 9–54 in for side reach over an obstruction, per ADA.

  • Desk workstation module: 48–60 in wide × 60–72 in deep including circulation; panel height 42–60 in balances speech privacy and daylight.

  • Open-plan density rule of thumb: 100–150 usable sq ft per person in benching layouts; 150–250 sq ft in enclosed offices.

  • Conference room sizing: 20–25 sq ft per seat plus 2 ft clearance at the table edge for chair pull-out.

  • Kitchen work triangle: each leg 4–9 ft, sum of legs 13–26 ft.

  • Conceptual design deliverables: parti diagram, adjacency/bubble plan, massing study, and preliminary space allocation table.

  • Universal design principles: equitable use, flexibility, simple intuitive use, perceptible information, tolerance for error, low physical effort, size and space for approach.

Quick reference

Building Systems, Construction, and Interior Materials

  • Live load vs. dead load: dead load is self-weight of construction; live load is occupancy, furniture, and movable equipment.

  • Concrete fire-resistance is achieved by cover thickness over reinforcement; steel requires spray-applied fire-resistive material or encasement.

  • Wood framing: joist span tables govern depth; blocking and bridging control deflection and lateral movement.

  • HVAC sensible heat equation: Q (Btu/h) = 1.08 × CFM × ΔT; latent heat: Q = 0.68 × CFM × Δgrains.

  • All-air VAV systems serve multiple zones; fan-coil and induction units suit perimeter loads; radiant slabs suit high ceilings.

  • Plenum depth rule of thumb: 18–24 in for ducted distribution plus structure and sprinkler; verify with MEP coordination.

  • Acoustical ceiling tile NRC 0.55–0.90; gypsum board NRC ≈ 0.05 and is used for sound isolation, not absorption.

  • Material selection criteria: durability, maintenance, fire rating, VOC content, recycled content, and embodied carbon.

  • Adhesive and sealant VOC limits are set by SCAQMD Rule 1168; carpet cushion and carpet by CRI Green Label Plus.

Quick reference

Codes, Standards, and Regulations

  • Egress width: 0.2 in per occupant for sprinklered spaces, 0.15 in for corridors in unsprinklered occupancies (IBC values; confirm edition).

  • Travel distance limits vary by occupancy and sprinkler status; commonly 250 ft sprinklered, 200 ft unsprinklered for business.

  • Two exits required when occupant load exceeds 49 in most occupancies; common path and dead-end limits apply.

  • Exit access separation: two exits must be separated by at least one-half the diagonal of the floor area served.

  • Doors in a means of egress swing in the direction of travel when serving 50 or more occupants.

  • Accessible route: 36 in minimum clear width, 1:12 maximum ramp slope, 30 × 48 in clear floor space at fixtures.

  • Accessible parking: one van-accessible space per six accessible spaces; 96 in wide access aisle for van spaces.

  • Guard height 42 in at openings; handrail height 34–38 in above stair nosing.

  • Occupant load factors: business 100 gross sq ft per person; assembly unconcentrated 15 net sq ft per person.

Quick reference

Lighting, Acoustics, and Indoor Environmental Quality

  • Illuminance targets (IES): open office 300–500 lux, conference 300–500 lux, corridors 100 lux, drafting 750 lux.

  • Inverse-square law: illuminance falls with the square of distance from a point source; cosine law adjusts for incidence angle.

  • Lumen method: average maintained illuminance = (lamps × lumens × CU × LLF) ÷ area.

  • Color rendering index ≥ 80 for general interiors; ≥ 90 for color-critical retail and healthcare tasks.

  • Power density caps come from ASHRAE 90.1 or IECC; lighting controls required include occupancy sensors and daylight dimming in perimeter zones.

  • Reverberation time (Sabine): RT60 = 0.049 V ÷ A (imperial, ft) where A = total absorption in sabins.

  • STC rates partition isolation; NIC rates installed performance; background noise targets 30–40 dBA in offices, ≤ 35 dBA in classrooms.

  • Sound transmission loss increases about 6 dB per doubling of mass per unit area (mass law).

  • IEQ levers: outdoor air ventilation per ASHRAE 62.1, source control of VOCs, humidity 30–60% RH, and thermal comfort per ASHRAE 55.

Quick reference

Design Communication and Documentation

  • Drawing scales: plan 1/8 in = 1 ft typical for interiors; enlarged plan 1/4 in = 1 ft; detail 1 1/2 in = 1 ft.

  • Plan, elevation, section, and detail form the core drawing set; reflected ceiling plan shows ceiling and lighting layout.

  • Line weights: cut elements heaviest, visible elements medium, beyond-cut and grid lightest.

  • Finish schedule columns: room number, floor, base, wall, ceiling, and remarks; keyed to a finish legend.

  • Door and hardware schedule references door type, frame, hardware set, and fire rating.

  • Specification formats: MasterFormat for work results, UniFormat for assemblies, SectionFormat for the three-part section.

  • BIM LOD 100 is conceptual massing; LOD 200 generic placeholders; LOD 300 specific measurable elements; LOD 350 includes interfaces.

  • Construction document set typically includes cover, general notes, plans, elevations, sections, schedules, details, and specifications.

  • Revision clouds and delta symbols mark changes; addenda are issued during bidding, ASIs and bulletins during construction.

Quick reference

Professional Practice and Project Coordination

  • Standard AIA agreements: B101 owner–architect, A101 owner–contractor stipulated sum, A201 general conditions.

  • Basic services typically cover schematic design through construction administration; additional services are billed separately.

  • Fee structures: percentage of construction cost, lump sum, hourly, and cost plus fee.

  • Bidding methods: sealed competitive bid, negotiated, and design-build; CM at-risk holds trade contracts.

  • Payment cycle: contractor pay application → architect certification → owner payment; retainage commonly 5–10%.

  • Substantial completion starts warranty and owner use; final completion releases retainage and closes the contract.

  • Change order requires owner approval; construction change directive directs work before price agreement.

  • Standard of care is the skill and care of a reasonably prudent practitioner, not a warranty of perfection.

  • Professional liability insurance covers errors and omissions; general liability covers bodily injury and property damage.