Efficiency ratio
Net assignable area divided by gross building area. It expresses how much usable space a building delivers; typical commercial office values fall between 0.75 and 0.85.
Adjacency matrix
A grid scoring required proximity between programmed spaces, usually on a 1 to 4 scale. It documents client priorities before any layout geometry is drawn.
Stacking diagram
A vertical allocation study assigning program elements to floors using adjacency weights, structural capacity, and circulation demand. It precedes block planning on multi-story projects.
Wind rose
A graphic showing the frequency of wind from each compass direction. Designers use it to place entries, screen winter wind, and plan summer cross-ventilation.
Bubble diagram
A loose plan diagram of circles and connecting lines representing spaces and required relationships. It communicates relative position and adjacency, not dimensions or shape.
Wheelchair turning space
A clear floor area of 60 inches diameter, or a T-shaped space with a 36-inch stem, allowing a wheelchair to reverse direction within a room.
Kitchen work triangle
The path linking sink, refrigerator, and cooking surface. Each leg should measure 4 to 9 feet, and the three legs together 13 to 26 feet.
Universal design
Seven principles promoting usable environments for all people: equitable use, flexibility, simple use, perceptible information, error tolerance, low effort, and adequate approach space.
Dead load
The permanent, stationary weight of building construction itself, including structure, finishes, partitions, and fixed equipment. It is distinct from occupancy live load.
Sensible heat equation
Q in Btu per hour equals 1.08 times airflow in CFM times the dry-bulb temperature difference. It sizes cooling for temperature change, excluding moisture removal.
NRC
Noise reduction coefficient, a single number averaging absorption at 250, 500, 1000, and 2000 Hz. Values near 0.05 mean reflective; 0.70 or higher means absorptive.
Plenum depth
The ceiling cavity between finished ceiling and structure that carries ducts, conduit, and sprinkler pipe. Rough planning depth is 18 to 24 inches before coordination.
Occupant load factor
Floor area per person assigned by occupancy type in the code. Business uses 100 gross square feet per person; unconcentrated assembly uses 15 net square feet.
Exit access separation
The required distance between two exits from the same space, typically at least one-half the diagonal of the floor area served, measured in a straight line.
Travel distance
The measured path length from the most remote point in a space to an exit. Limits depend on occupancy and sprinkler protection, often 200 to 250 feet.
Clear floor space
A minimum 30 by 48 inch unobstructed area at an accessible element, positioned for forward or parallel approach by a person using a wheelchair.
Lumen method
Average maintained illuminance equals lamps times lumens per lamp times coefficient of utilization times light loss factor, divided by room area in square feet.
Sabine equation
Reverberation time in seconds equals 0.049 times room volume in cubic feet divided by total absorption in sabins. Higher absorption shortens reverberation.
STC rating
Sound transmission class, a single-number laboratory rating of how well a partition blocks airborne sound. Higher values mean greater speech isolation between rooms.
Mass law
Sound transmission loss of a barrier rises roughly 6 decibels for each doubling of its mass per unit area, so heavy partitions isolate sound better than light ones.
Reflected ceiling plan
A drawing viewed as if looking down at a mirror above the ceiling, showing light fixtures, diffusers, sprinklers, and ceiling grid in true plan position.
Finish schedule
A tabular drawing-sheet listing each room with its floor, base, wall, and ceiling finishes, keyed to a finish legend and material specifications.
MasterFormat
A specifications numbering system organized by work results and trades, such as Division 09 Finishes, used to arrange project manuals and cost estimates.
Revision cloud
A scalloped graphic enclosing changed drawing content, paired with a delta symbol and revision number that matches the sheet's revision block.
AIA B101
The standard owner-architect agreement defining basic services, compensation, and responsibilities. It is commonly paired with A201 general conditions through the owner-contractor contract.
Substantial completion
The stage when work is sufficiently complete for the owner to occupy and use the project for its intended purpose, starting warranties and the punch list period.
Change order
A written modification to the contract sum or time, signed by owner, contractor, and architect, issued after agreement on scope and price.
Construction change directive
A written order directing a change in work before the owner and contractor agree on price or time, used to keep the schedule moving.
Standard of care
The skill and judgment ordinarily exercised by reasonably prudent design professionals under similar conditions. It is not a guarantee of perfect results.
Retainage
A percentage withheld from each progress payment, commonly 5 to 10 percent, until final completion, protecting the owner against incomplete or defective work.
Design-build delivery
A project method where one entity holds both design and construction contracts with the owner, creating a single point of responsibility and overlapping phases.
Addendum
A written clarification or correction issued during bidding, before contract award, that becomes part of the contract documents for all bidders.