ND Land Surveyor study materials
ND Land Surveyor study resources

ND Land Surveyor cheat sheet

ND Land Surveyor · Keep the key ideas within reach.

Quick reference

Boundary Surveying and Legal Principles

  • Priority of evidence (hierarchy of calls): natural monuments, artificial monuments, courses and distances, area; written record evidence controls over measurements taken in the field.

  • Adverse possession in North Dakota requires N.D.C.C. ch. 28-01: 20 years of actual, open, notorious, exclusive, hostile, and continuous possession; color of title with payment of taxes can shorten to 10 years under N.D.C.C. 28-01-08.

  • Boundary by acquiescence requires a mutual recognition of a line as the boundary, typically treated as a presumption rebuttable by clear evidence; practical location fixes an uncertain line the parties agreed to and then treated as binding.

  • Easements are appurtenant or in gross; a prescriptive easement requires the same elements as adverse possession except exclusivity, and North Dakota treats use of unenclosed land as permissive in some contexts.

  • Riparian boundaries: the thread of the stream rule applies to non-navigable streams; for navigable waters the state owns the bed and the ordinary high water mark is the boundary (equal footing doctrine).

  • Monument vs. measurement: when a monument of the original survey is found undisturbed, it controls the record distance; if the monument is lost, remonumentation should follow the original survey's evidence of position.

  • Deed construction: a call for a monument that can be located prevails over a call for an adjoining tract or a course/distance; ambiguity is construed against the grantor.

  • Record research order: chain of title, then original government survey plats and field notes, then subdivision plats and auditor's records; note section subdivision by the U.S. Public Land Survey System.

Quick reference

Mathematics, Measurement, and Computations

  • Traverse closure: linear error of closure = sqrt((sum departures)^2 + (sum latitudes)^2); precision = perimeter / linear error, expressed as 1:N.

  • Latitude = distance × cos(bearing), departure = distance × sin(bearing); bearings measured from north or south toward east or west, azimuths measured clockwise from north.

  • Adjustment by compass (Bowditch) rule: correction to each latitude/departure proportional to its length over total perimeter; transit rule uses total absolute latitude/departure.

  • Area by coordinates (shoelace): 2A = sum over i of (E_i × N_{i+1} − E_{i+1} × N_i); sign indicates clockwise or counterclockwise order.

  • Triangle solution: Law of Sines a/sin A = b/sin B = c/sin C; Law of Cosines c² = a² + b² − 2ab cos C for SAS or SSS cases.

  • Horizontal curve: T = R tan(Δ/2), L = RΔ (Δ in radians), M = R(1/cos(Δ/2) − 1), E = R(1/cos(Δ/2) − 1); degree of curve by arc definition D = 5729.578/R.

  • Vertical curve: elevation at any station = PVC elevation + g1 x + (g2 − g1)x²/(2L), with x measured from the PVC; high/low point where x = −g1 L/(g2 − g1).

  • Unit conversions: 1 acre = 43,560 ft² = 4046.856 m²; 1 mile = 80 chains = 5280 ft; 1 Gunter's chain = 66 ft; 1 rod = 16.5 ft.

Quick reference

Geodetic and Control Surveying

  • NAD83 (2011) is the current horizontal datum for North Dakota; NAVD88 is the vertical datum; know the epoch of adjustment when reporting coordinates.

  • State Plane Coordinate System in North Dakota: two zones, North (3401) and South (3402), Lambert Conformal Conic; scale factor and convergence angle vary with longitude.

  • Grid vs. ground: grid distance = ground distance × combined factor, where combined factor = scale factor × elevation factor; elevation factor ≈ R/(R + h) with R ≈ 20,906,000 ft.

  • Geoid model (GEOID18) converts between ellipsoidal height h and orthometric height H: H = h − N, where N is geoid undulation.

  • Differential leveling: misclosure adjusted proportional to distance or number of setups; allowable misclosure often expressed as C × sqrt(miles) for a given order.

  • GNSS static/RTK: horizontal accuracy typically 1 cm + 1 ppm for static, 1–2 cm for RTK; vertical accuracy is about 2–3 times worse than horizontal.

  • Control densification must tie to NSRS passive marks or CORS; OPUS solutions require at least 2–4 hours of static data for reliable results.

  • Reciprocal vertical angles cancel curvature and refraction; combined curvature and refraction correction ≈ 0.0206 D² (D in thousands of feet, result in feet).

Quick reference

Photogrammetry, Remote Sensing, and Mapping

  • Scale of a vertical aerial photo = f/H, where f is focal length and H is flying height above ground; photo scale varies with terrain elevation.

  • Relief displacement d = r × h/H, where r is radial distance from principal point, h is object height, H is flying height; displacement is radial from the nadir.

  • Stereopair overlap: 60% endlap and 20–30% sidelap are typical; base/height ratio B/H controls vertical accuracy.

  • Orthophoto production removes relief displacement and tilt; digital orthophoto quarter quads (DOQQs) are referenced to NAD83 and often delivered at 1 m or 0.5 m resolution.

  • LiDAR: point density and pulse rate determine ground sampling; classified returns separate ground, vegetation, and buildings; accuracy reported as RMSEz.

  • NDVI = (NIR − Red)/(NIR + Red); values range −1 to 1, with healthy vegetation typically 0.3–0.9.

  • Map accuracy: National Map Accuracy Standards require 90% of well-defined points within 1/30 inch at map scale (horizontal) and one-half contour interval (vertical).

  • Photogrammetric control: pass points and ground control points must be well distributed; bundle adjustment minimizes residuals across all photos.

Quick reference

Cartography, GIS, and Data Management

  • Map projections: conformal preserves angles (Lambert, Transverse Mercator), equal-area preserves area (Albers), equidistant preserves distance along specific lines.

  • Coordinate systems: geographic (latitude/longitude, degrees) vs. projected (linear units); always record datum and epoch with coordinates.

  • Topology rules in GIS: no gaps, no overlaps, no dangles; topology supports network analysis and parcel fabric maintenance.

  • Metadata standard: FGDC Content Standard for Digital Geospatial Metadata or ISO 19115; record source, accuracy, projection, and lineage.

  • Vector vs. raster: vector stores points/lines/polygons with attributes; raster stores a grid of cells with a single value per cell, resolution controls detail.

  • Parcel data management: GIS parcel fabric must be reconciled with recorded deeds and plats; a GIS map is not a legal boundary unless adopted as such.

  • Map scale and generalization: larger scale (1:1,200) shows more detail than smaller scale (1:24,000); generalization reduces detail at small scales.

  • Data accuracy: positional accuracy is tested against higher-accuracy control; attribute accuracy is tested by sampling and comparison to source records.

Quick reference

Surveying Instruments, Field Procedures, and Safety

  • Total station: measure horizontal and vertical angles plus slope distance; apply atmospheric and prism constant corrections; EDM accuracy often ±(2 mm + 2 ppm).

  • Digital level: uses bar-code staff; typical accuracy 0.3 mm/km double-run; check collimation before each project.

  • GNSS RTK: base station broadcasts corrections to rover; fix solution requires at least 5 satellites and good PDOP; check with a known point at start and end of session.

  • Traverse field procedure: close on known control, record all angles and distances, note instrument height and target height; perform a field check on a second known point.

  • Safety: traffic control per MUTCD, high-visibility apparel, locate underground utilities before digging, and follow lockout/tagout near power lines.

  • Instrument care: store in a dry, temperature-stable case; avoid pointing at the sun without a filter; calibrate levels and total stations on a schedule.

  • Field notes: record date, weather, party, instrument, and observations in a bound field book; do not erase - strike through errors and initial.

  • Leveling: balance backsight and foresight distances to cancel curvature, refraction, and collimation error; keep sight lines short.

Quick reference

Land Development, Construction, and Engineering Surveying

  • Construction staking: set horizontal and vertical control, then stake offsets; check as-built against design before paving or pouring.

  • Grading: cut and fill volumes by average end area or prismoidal formula; mass haul diagrams balance cut and fill.

  • Horizontal and vertical alignment: design speed, superelevation, and stopping sight distance govern curve design; check clearances.

  • Stormwater: detention/retention design uses the rational method Q = CiA; check local and state drainage requirements.

  • Subdivision plat: show lots, blocks, streets, easements, and dedications; must be approved by the governing body and recorded.

  • Erosion and sediment control: silt fence, inlet protection, and stabilized construction entrances; inspect after each rain event.

  • ADA and accessibility: sidewalk cross-slope not steeper than 2%, running slope not steeper than 5% without landings.

  • As-built surveys document constructed improvements; compare to design and note deviations; deliver record drawings to the owner.

Quick reference

Business Practices, Ethics, and Professional Responsibility

  • Professional ethics: practice only within competence, disclose conflicts of interest, and do not misrepresent qualifications or results.

  • Contracts: scope, schedule, fee, and deliverable should be in writing; standard of care is that of a reasonably prudent surveyor under similar circumstances.

  • Liability: errors and omissions insurance covers negligent professional acts; keep records for the statute of limitations period.

  • Seals and signatures: only a licensed surveyor may sign and seal survey documents; do not seal work you did not perform or directly supervise.

  • Confidentiality: protect client information; disclose only with consent or legal requirement.

  • Continuing education: North Dakota requires continuing professional competency hours for renewal; keep certificates.

  • Business records: retain field notes, computations, and correspondence for the period required by law and contract.

  • Advertising: do not use false or misleading statements; do not claim official affiliation with any agency.

Quick reference

North Dakota Statutes, Rules, and State-Specific Practice

  • North Dakota surveyor licensure is administered by the State Board of Registration for Professional Engineers and Land Surveyors under N.D.C.C. ch. 43-19.1.

  • Boundary surveys in North Dakota follow the North Dakota Minimum Standards for Land Boundary Surveys; check current board rules for monumentation and filing requirements.

  • Corner recordation: monumented corners should be recorded with the county recorder; the state plane coordinate system in North Dakota uses two zones (North 3401, South 3402).

  • Plats and subdivisions: county and city platting authority review; the plat must be approved and recorded before lots are conveyed.

  • Adverse possession and boundary disputes are governed by N.D.C.C. ch. 28-01; prescriptive easements require open, adverse, continuous use for the statutory period.

  • Public lands: the federal government's original surveys and field notes are the basis for section subdivision; the Bureau of Land Management maintains the records.

  • Water boundaries: the state owns the beds of navigable waters; the ordinary high water mark is the boundary; check the current list of navigable waters.

  • Practice rules: the board may discipline licensees for incompetence, negligence, or violation of the rules; know the complaint process and continuing education requirement.

Quick reference

Boundary Surveying and Legal Principles

  • Priority of evidence: natural monuments, artificial monuments, courses and distances, area; record evidence controls over field measurements.

  • Adverse possession in North Dakota requires 20 years of actual, open, notorious, exclusive, hostile, and continuous possession under N.D.C.C. ch. 28-01.

  • Boundary by acquiescence: mutual recognition of a line as the boundary, rebuttable by clear evidence; practical location fixes an uncertain line the parties agreed to.

  • Easements: prescriptive easement requires the same elements as adverse possession except exclusivity; use of unenclosed land may be permissive.

  • Riparian boundaries: thread of the stream for non-navigable streams; state owns the bed of navigable waters up to the ordinary high water mark.

  • Monument vs. measurement: an undisturbed original monument controls record distance; a lost monument is reestablished from original survey evidence.

  • Deed construction: a locatable monument call prevails over a call for an adjoining tract or a course and distance; ambiguity is construed against the grantor.

  • Record research order: chain of title, original government survey plats and field notes, then subdivision plats and auditor's records.

Quick reference

Mathematics, Measurement, and Computations

  • Traverse closure: linear error = sqrt((sum departures)² + (sum latitudes)²); precision = perimeter / linear error as 1:N.

  • Latitude = distance × cos(bearing); departure = distance × sin(bearing); azimuths measured clockwise from north.

  • Compass rule adjustment: correction proportional to length over total perimeter; transit rule uses total absolute latitude/departure.

  • Area by coordinates: 2A = sum of (E_i × N_{i+1} − E_{i+1} × N_i) around the traverse.

  • Law of Sines a/sin A = b/sin B = c/sin C; Law of Cosines c² = a² + b² − 2ab cos C.

  • Horizontal curve: T = R tan(Δ/2), L = RΔ (radians), M = R(1/cos(Δ/2) − 1), D = 5729.578/R by arc definition.

  • Vertical curve: elevation = PVC + g1 x + (g2 − g1)x²/(2L); high/low point at x = −g1 L/(g2 − g1).

  • Conversions: 1 acre = 43,560 ft²; 1 mile = 80 chains = 5280 ft; 1 chain = 66 ft; 1 rod = 16.5 ft.

Quick reference

Geodetic and Control Surveying

  • NAD83 (2011) is the current horizontal datum in North Dakota; NAVD88 is the vertical datum; report the epoch.

  • North Dakota State Plane: two zones, North 3401 and South 3402, Lambert Conformal Conic; scale factor and convergence vary with longitude.

  • Grid distance = ground distance × combined factor; combined factor = scale factor × elevation factor; elevation factor ≈ R/(R + h).

  • Geoid model GEOID18: H = h − N, converting ellipsoidal height to orthometric height.

  • Differential leveling misclosure is adjusted proportional to distance or setups; allowable misclosure often C × sqrt(miles).

  • GNSS static accuracy about 1 cm + 1 ppm horizontal; RTK about 1–2 cm horizontal, vertical 2–3 times worse.

  • Control must tie to NSRS passive marks or CORS; OPUS solutions need at least 2–4 hours of static data.

  • Curvature and refraction combined correction ≈ 0.0206 D² (D in thousands of feet, result in feet).

Quick reference

Photogrammetry, Remote Sensing, and Mapping

  • Photo scale = f/H, where f is focal length and H is flying height above ground.

  • Relief displacement d = r × h/H, radial from the nadir; displacement increases with distance from the principal point.

  • Stereopair overlap: 60% endlap and 20–30% sidelap typical; B/H ratio controls vertical accuracy.

  • Orthophotos remove relief displacement and tilt; DOQQs are referenced to NAD83 at 1 m or 0.5 m resolution.

  • LiDAR: point density and pulse rate set ground sampling; classified returns separate ground, vegetation, and buildings; accuracy reported as RMSEz.

  • NDVI = (NIR − Red)/(NIR + Red); healthy vegetation typically 0.3–0.9.

  • National Map Accuracy Standards: 90% of well-defined points within 1/30 inch at map scale horizontally and one-half contour interval vertically.

  • Bundle adjustment uses well-distributed ground control and pass points to minimize residuals across all photos.

Quick reference

Cartography, GIS, and Data Management

  • Conformal projections preserve angles (Lambert, Transverse Mercator); equal-area preserves area (Albers); equidistant preserves distance along specific lines.

  • Geographic coordinates are in degrees; projected coordinates are in linear units; always record datum and epoch.

  • Topology rules: no gaps, no overlaps, no dangles; topology supports network analysis and parcel fabric maintenance.

  • Metadata standard: FGDC CSDGM or ISO 19115; record source, accuracy, projection, and lineage.

  • Vector data stores points, lines, and polygons with attributes; raster data stores a grid of cells with one value per cell.

  • A GIS parcel fabric must be reconciled with recorded deeds and plats; a GIS map is not a legal boundary unless adopted as such.

  • Larger scale (1:1,200) shows more detail than smaller scale (1:24,000); generalization reduces detail at small scales.

  • Positional accuracy is tested against higher-accuracy control; attribute accuracy is tested by sampling against source records.

Quick reference

Surveying Instruments, Field Procedures, and Safety

  • Total station measures horizontal and vertical angles plus slope distance; apply atmospheric and prism constant corrections; EDM accuracy often ±(2 mm + 2 ppm).

  • Digital level uses a bar-code staff; typical accuracy 0.3 mm/km double-run; check collimation before each project.

  • GNSS RTK: base broadcasts corrections to rover; fix requires at least 5 satellites and good PDOP; check against a known point at start and end.

  • Traverse procedure: close on known control, record angles and distances, note instrument and target heights, and field-check on a second known point.

  • Safety: traffic control per MUTCD, high-visibility apparel, utility locate before digging, and lockout/tagout near power lines.

  • Instrument care: store in a dry, temperature-stable case; avoid pointing at the sun without a filter; calibrate on schedule.

  • Field notes: record date, weather, party, instrument, and observations in a bound book; strike through errors and initial, never erase.

  • Leveling: balance backsight and foresight distances to cancel curvature, refraction, and collimation error; keep sight lines short.

Quick reference

Land Development, Construction, and Engineering Surveying

  • Construction staking: establish horizontal and vertical control, stake offsets, and check as-built before paving or pouring.

  • Cut and fill volumes by average end area or prismoidal formula; mass haul diagrams balance cut and fill.

  • Alignment design: design speed, superelevation, and stopping sight distance govern curve design; check clearances.

  • Stormwater detention design uses the rational method Q = CiA; check local and state drainage requirements.

  • Subdivision plat shows lots, blocks, streets, easements, and dedications; must be approved by the governing body and recorded.

  • Erosion control: silt fence, inlet protection, and stabilized construction entrances; inspect after each rain event.

  • ADA: sidewalk cross-slope not steeper than 2%, running slope not steeper than 5% without landings.

  • As-built surveys document constructed improvements, compare to design, and deliver record drawings to the owner.

Quick reference

Business Practices, Ethics, and Professional Responsibility

  • Practice only within competence, disclose conflicts of interest, and do not misrepresent qualifications or results.

  • Contracts should be in writing with scope, schedule, fee, and deliverables; standard of care is a reasonably prudent surveyor under similar circumstances.

  • Errors and omissions insurance covers negligent professional acts; retain records for the statute of limitations period.

  • Only a licensed surveyor may sign and seal survey documents; do not seal work you did not perform or directly supervise.

  • Protect client confidentiality; disclose only with consent or legal requirement.

  • North Dakota requires continuing professional competency hours for renewal; keep certificates.

  • Retain field notes, computations, and correspondence for the period required by law and contract.

  • Advertising must not be false or misleading; do not claim official affiliation with any agency.

Quick reference

North Dakota Statutes, Rules, and State-Specific Practice

  • Surveyor licensure is administered by the State Board of Registration for Professional Engineers and Land Surveyors under N.D.C.C. ch. 43-19.1.

  • Boundary surveys follow the North Dakota Minimum Standards for Land Boundary Surveys; check current board rules for monumentation and filing.

  • Monumented corners should be recorded with the county recorder; North Dakota State Plane has two zones, North 3401 and South 3402.

  • Plats and subdivisions require county and city platting authority review; the plat must be approved and recorded before lots are conveyed.

  • Adverse possession and boundary disputes are governed by N.D.C.C. ch. 28-01; prescriptive easements require open, adverse, continuous use for the statutory period.

  • Original federal surveys and field notes are the basis for section subdivision; the Bureau of Land Management maintains the records.

  • The state owns the beds of navigable waters; the ordinary high water mark is the boundary; check the current list of navigable waters.

  • The board may discipline licensees for incompetence, negligence, or rule violations; know the complaint process and continuing education requirement.