NE Land Surveyor study materials
NE Land Surveyor study resources

NE Land Surveyor cheat sheet

NE Land Surveyor · Keep the key ideas within reach.

Quick reference

Boundary Surveying

  • Priority of evidence (federal PLSS practice): natural monuments > artificial monuments > courses and distances > area; written record yields to undisturbed original monument evidence.

  • Adverse possession elements (typical): actual, open and notorious, exclusive, continuous for the statutory period, and hostile; statutory periods vary by state (commonly 10–20 years).

  • Prescriptive easement requires use that is open, notorious, adverse, continuous, and under claim of right; exclusivity is generally not required.

  • Riparian boundary: accretion (gradual, imperceptible) moves the boundary; avulsion (sudden, perceptible) does not; reliction is land exposed by receding water.

  • Meander line is not a boundary of record; it is an evidential line for computing area of fractional lots; the water boundary controls.

  • PLSS aliquot parts: quarter-quarter section = 40 acres; 1/8 of a section = 80 acres; fractional lots along correction lines are numbered and area-computed.

  • Missing corner: proportioning (single or double proportion) restores position from surviving corners; double proportion uses two known corners on each line.

  • Unwritten rights: easement by necessity requires unity of title and strict necessity; easement by implication requires prior use that is apparent and reasonably necessary.

  • Boundary retracement measures record angles and distances between found monuments; it does not create new lines absent written intent.

Quick reference

Construction Design

  • Horizontal curve: T = R tan(Δ/2); L = RΔ(rad); M = R[1 − cos(Δ/2)]; E = R[sec(Δ/2) − 1]; C = 2R sin(Δ/2).

  • Vertical curve: elevation = PVC elev + g1·x + ((g2 − g1)/2L)x², with x measured from PVC; K = L/|A| where A = g2 − g1 in percent.

  • Sight distance on crest vertical curve (US customary, S < L): L = A·S²/2158; sag curve (S < L): L = A·S²/(400 + 3.5S).

  • Stationing: 1 station = 100 ft; metric practice uses 1 station = 1 km or 20 m intervals; station equations adjust for line changes.

  • Earthwork: average end area V = L(A1 + A2)/2; prismoidal correction = L(A1 − A2)²/(12·A_m) for three-level sections.

  • Grade = rise/run expressed in percent; slope stake set where cut/fill equals the design template offset from centerline.

  • Superelevation: e + f = V²/(gR); in US customary, e + f = V²/(15R) with V in mph and R in feet.

  • Construction layout tolerances are set by specification, not by survey instrument precision; check as-built against design coordinates, not offsets alone.

Quick reference

Layout (Construction Layout)

  • Horizontal layout by bearing-bearing intersection, bearing-distance, or distance-distance; distance-distance has two solutions unless side is specified.

  • Stake offset = measured distance − design distance; positive/negative convention must be stated in the field book and on the stake.

  • Set control (baseline, traverse, or GNSS-derived pairs) outside the construction influence zone and reference by azimuth and distance from at least two points.

  • Vertical layout: HI = BM elevation + backsight; stake elevation = HI − foresight; check closure against a second benchmark.

  • Total station setup: occupy known point, backsight known point, verify with a third known point (residual should be within project tolerance).

  • Machine control and UAS-derived surfaces require independent check shots on known features before acceptance of grade.

  • For batter boards and offsets, record the reference line azimuth and the perpendicular offset distance; never rely on unrecorded string lines.

  • As-built reporting distinguishes design coordinate, computed coordinate, and measured coordinate; misfit is reported in both components.

Quick reference

Geodesy

  • Ellipsoid parameters: a (semi-major), f (flattening); b = a(1 − f); e² = 2f − f²; GRS80 a = 6,378,137 m, 1/f = 298.257222101.

  • Geodetic vs geocentric: latitude/longitude/height on the ellipsoid versus Earth-centered XYZ; convert with standard ECEF formulas.

  • State Plane: Lambert Conformal Conic for east-west zones; Transverse Mercator for north-south zones; scale factor differs from 1 except on standard parallels or central meridian.

  • Combined factor = grid factor × elevation factor; elevation factor ≈ R/(R + h) using mean radius and orthometric height.

  • NAD83(2011) and NATRF2022 are terrestrial reference frames; NAD27 is a legacy datum differing by tens to hundreds of meters.

  • Geoid model (e.g., GEOID18) converts ellipsoid height h to orthometric H: H = h − N.

  • Azimuth types: true (geodetic), grid, magnetic; convergence γ = grid azimuth − geodetic azimuth, varies with longitude from the central meridian.

  • UTM: 6° zones, central meridian scale 0.9996, false easting 500,000 m; zone boundaries create discontinuities requiring re-projection.

Quick reference

GIS

  • Vector topology rules: no gaps/overlaps in polygon coverage, no dangling nodes in networks, no self-intersections; violations reported by validation tools.

  • Raster cell size controls resolution; area of a cell = cellsize²; resampling methods: nearest (categorical), bilinear/cubic (continuous).

  • Map projection choice: equal-area for density/area statistics, conformal for navigation and shape, equidistant for distance measurement from a point.

  • Attribute join requires a key with matching type and uniqueness; one-to-many joins duplicate features and inflate area/perimeter sums.

  • Metadata standard elements: coordinate reference system, accuracy, lineage, source scale, and date of imagery.

  • Buffer distance in a projected CRS is planar; in a geographic CRS buffer uses degrees and produces distorted results.

  • LiDAR-derived DEM vertical accuracy is reported as RMSEz; check against independent checkpoints, not the point cloud itself.

  • Geodatabase feature class vs shapefile: shapefile has 2 GB limit, no true curves, field names limited to 10 characters.

Quick reference

Hydrography

  • Chart datum: Mean Lower Low Water (MLLW) in US waters; soundings and charted depths are referenced to MLLW, heights to MHW.

  • Tidal datum computation uses a 19-year National Tidal Datum Epoch; short-term series are reduced by comparison to a control station.

  • Multibeam: swath width ≈ 2 × depth × tan(beam angle/2); coverage and resolution degrade with depth and beam angle.

  • Sound velocity errors refract beams; a profile at the transducer is required; uncorrected errors appear as systematic depth bias or bowl effect.

  • Vertical reference: reduce soundings by observed tide or by separation model; ellipsoid-referenced surveys require a separation surface to chart datum.

  • Hydrographic positioning standards pair horizontal and vertical uncertainty; total vertical uncertainty combines depth-dependent and constant terms.

  • Side-scan sonar detects features and texture; it does not give reliable depths without additional calibration.

  • USACE hydrographic survey tolerances are specified per project; check the project specification rather than assuming a universal value.

  • Currents and vessel motion (heave, pitch, roll) are corrected with an IMU; uncorrected motion produces periodic depth artifacts.

Quick reference

Land Development and Design

  • Site plan elements: property lines, setbacks, buildable area, impervious coverage, parking counts, drainage, and utility easements.

  • Parking: stall dimensions and drive aisle widths are set by local code; accessible stalls require access aisles and van-accessible dimensions per ADA.

  • Stormwater: Rational method Q = CiA (US customary, Q in cfs, A in acres); time of concentration sets the design storm duration.

  • Detention/retention sizing compares pre- and post-development peak flows and volumes; post-development peak must not exceed allowable release rate.

  • Grading: minimum slopes for positive drainage (commonly 1–2% for paved, 2% for turf) are set by local standards; verify in the code.

  • Lot area and frontage are measured to the property line or right-of-way line as the ordinance specifies; do not mix the two.

  • Right-of-way vs easement: ROW is dedicated public access; easements convey specific use rights and do not transfer title.

  • Subdivision plat must show bearings, distances, curve data, monument locations, and dedications; approval is by the reviewing authority.

  • Floodplain: regulatory flood elevation (e.g., Base Flood Elevation) restricts fill and construction; check the effective FIRM panel.

Quick reference

Photogrammetry

  • Scale of a vertical photo: S = f/H, where H is flying height above ground; larger scale means smaller denominator.

  • Relief displacement: d = r·h/H, radial from the principal point; taller objects and larger radial distance displace more.

  • Overlap: 60% endlap and 20–30% sidelap are typical for stereo mapping; insufficient overlap prevents stereo compilation.

  • Parallax difference relates to elevation difference: Δh = Δp·H/(b·f) using base b and focal length f.

  • Aerotriangulation (bundle adjustment) solves camera stations and tie points; control points constrain the solution.

  • Orthophoto removes relief displacement using a DEM; errors in the DEM appear as local distortion or seam artifacts.

  • Ground sample distance (GSD) = pixel size on the ground; smaller GSD improves detail but increases data volume.

  • Analytic stereo plotting requires interior, relative, and absolute orientation; check residual statistics before accepting the model.

  • Camera calibration (focal length, principal point, distortion) must be current; uncorrected lens distortion biases coordinates.

Quick reference

Remote Sensing (LiDAR, UAS)

  • LiDAR returns: first, last, and intermediate; bare-earth DEM requires classification and filtering of vegetation and structures.

  • Point density = pulses per unit area; multiple returns can yield higher point density than pulse density.

  • Vertical accuracy of LiDAR is reported as RMSEz against independent checkpoints; classify and remove gross errors before reporting.

  • UAS photogrammetry requires ground control points or RTK/PPK positioning; without them, absolute accuracy degrades to several meters.

  • Flight planning: overlap, altitude, GSD, and wind limits; check airspace authorization before flight (e.g., controlled airspace).

  • NDVI = (NIR − Red)/(NIR + Red); values range from −1 to 1; vegetation typically above 0.3.

  • LiDAR intensity is a relative return-strength value; it is not a calibrated reflectance unless corrected.

  • UAS-derived point clouds are photogrammetric (surface) unless LiDAR-equipped; vegetation penetration is limited.

  • Change detection requires co-registered datasets; misregistration produces false changes at edges.

Quick reference

Surveying Legal Principles

  • Statute of frauds: conveyances of land must be in writing and signed; oral boundary agreements generally fail unless an exception applies.

  • Recording acts: race, notice, and race-notice statutes determine priority among competing interests; a later purchaser may prevail under notice statutes.

  • Easement appurtenant benefits a dominant parcel; easement in gross benefits a person or entity and is not tied to a parcel.

  • Prescription requires the statutory period of adverse use; adverse possession requires the statutory period of adverse possession plus the elements.

  • Boundary by agreement requires a dispute or uncertainty and a meeting of minds; it is not a substitute for a survey.

  • Monument priority: original government monuments control over record distances and areas; retracement surveys follow the original footsteps.

  • Description sufficiency requires a locatable starting point and a closed boundary; ambiguities are resolved by rules of construction.

  • Professional liability: the surveyor's standard of care is that of a reasonably prudent surveyor in the same community and practice.

  • Title vs boundary: a surveyor locates boundaries and reports evidence; title opinions and title insurance are provided by attorneys and title companies.

Quick reference

Boundary Surveying

  • Priority of evidence: natural monuments > artificial monuments > courses and distances > area; undisturbed original monuments control record measurements.

  • Adverse possession elements: actual, open and notorious, exclusive, continuous for the statutory period, and hostile; periods vary by state.

  • Accretion (gradual, imperceptible) shifts the riparian boundary; avulsion (sudden, perceptible) does not move the boundary.

  • Meander line is an evidential line, not a boundary of record; the water boundary controls the fractional lot.

  • PLSS aliquot parts: quarter-quarter section = 40 acres; 1/8 section = 80 acres; fractional lots are numbered and area-computed.

  • Missing corner restoration: single or double proportion from surviving corners; double proportion uses two known corners on each line.

  • Easement by necessity requires unity of title and strict necessity; easement by implication requires prior apparent and reasonably necessary use.

  • Retracement measures record angles and distances between found monuments; it does not create new lines absent written intent.

  • Boundary evidence hierarchy is applied before any new monument is set; setting a new corner does not override original evidence.

Quick reference

Construction Design

  • Horizontal curve: T = R tan(Δ/2); L = RΔ in radians; M = R[1 − cos(Δ/2)]; E = R[sec(Δ/2) − 1]; C = 2R sin(Δ/2).

  • Vertical curve elevation = PVC elev + g1·x + ((g2 − g1)/2L)x², with x from PVC; K = L/|A|, A = g2 − g1 in percent.

  • Crest sight distance (S < L, US customary): L = A·S²/2158; sag: L = A·S²/(400 + 3.5S).

  • Stationing: 1 station = 100 ft in US customary; metric practice uses 1 km or 20 m intervals; station equations handle line changes.

  • Earthwork: average end area V = L(A1 + A2)/2; prismoidal correction uses (A1 − A2)²/(12·A_m).

  • Grade = rise/run as a percent; slope stakes are set where cut or fill equals the design template offset from centerline.

  • Superelevation: e + f = V²/(15R) in US customary with V in mph and R in feet.

  • Layout tolerances come from project specifications, not instrument precision; as-builts compare design coordinates to measured coordinates.

  • Curve data on plans must include Δ, R, L, T, and PC/PT stations; missing elements prevent field layout.

Quick reference

Layout (Construction Layout)

  • Horizontal layout methods: bearing-bearing intersection, bearing-distance, and distance-distance; distance-distance has two solutions unless the side is specified.

  • Stake offset = measured distance − design distance; the sign convention must be recorded in the field book and on the stake.

  • Set control outside the construction influence zone; reference by azimuth and distance from at least two known points.

  • Vertical layout: HI = BM elevation + backsight; stake elevation = HI − foresight; verify closure against a second benchmark.

  • Total station setup: occupy a known point, backsight a known point, and verify with a third known point within project tolerance.

  • Machine control and UAS surfaces require independent check shots on known features before grade acceptance.

  • Batter boards and offsets must record the reference line azimuth and the perpendicular offset distance; unrecorded string lines are not evidence.

  • As-built reporting distinguishes design, computed, and measured coordinates; misfit is reported in both components.

  • Layout checks repeat the measurement from a different setup; a single setup does not detect orientation blunders.

Quick reference

Geodesy

  • Ellipsoid: b = a(1 − f); e² = 2f − f²; GRS80 has a = 6,378,137 m and 1/f = 298.257222101.

  • Geodetic coordinates (lat, lon, h) convert to Earth-centered XYZ (ECEF) with standard closed-form equations.

  • State Plane: Lambert Conformal Conic for east-west zones; Transverse Mercator for north-south zones; scale factor is 1 only on standard parallels or the central meridian.

  • Combined factor = grid factor × elevation factor; elevation factor ≈ R/(R + h) using mean Earth radius and orthometric height.

  • NAD83(2011) and NATRF2022 are terrestrial reference frames; NAD27 is a legacy datum differing by tens to hundreds of meters.

  • Geoid model converts ellipsoid height to orthometric height: H = h − N (e.g., GEOID18).

  • Azimuth types: true (geodetic), grid, and magnetic; convergence γ = grid azimuth − geodetic azimuth varies with longitude from the central meridian.

  • UTM: 6° zones, central meridian scale 0.9996, false easting 500,000 m; zone boundaries create discontinuities requiring re-projection.

  • Scale factor at a point differs from the zone's central scale; grid distance = ground distance × combined factor.

Quick reference

GIS

  • Vector topology rules: no gaps or overlaps in polygon coverage, no dangling nodes in networks, no self-intersections; validation tools report violations.

  • Raster cell size sets resolution; cell area = cellsize²; resampling: nearest for categorical, bilinear or cubic for continuous data.

  • Projection choice: equal-area for density and area statistics, conformal for shape and navigation, equidistant for distance from a point.

  • Attribute joins need a matching key type and uniqueness; one-to-many joins duplicate features and inflate area and perimeter sums.

  • Metadata elements: coordinate reference system, accuracy, lineage, source scale, and imagery date.

  • Buffer distance is planar in a projected CRS; in a geographic CRS the buffer uses degrees and is distorted.

  • LiDAR-derived DEM accuracy is reported as RMSEz against independent checkpoints, not against the point cloud itself.

  • Shapefile limits: 2 GB size, no true curves, field names limited to 10 characters; geodatabase feature classes avoid these limits.

  • Coordinate transformation between datums requires a published transformation and its accuracy statement; naive reprojection introduces error.

Quick reference

Hydrography

  • Chart datum: Mean Lower Low Water (MLLW) for soundings and charted depths in US waters; heights reference Mean High Water (MHW).

  • Tidal datums use a 19-year National Tidal Datum Epoch; short-term series are reduced by comparison to a control station.

  • Multibeam swath width ≈ 2 × depth × tan(beam angle/2); coverage and resolution degrade with depth and outer beam angle.

  • Sound velocity errors refract beams; a profile at the transducer is required; uncorrected errors appear as systematic depth bias or bowl effect.

  • Vertical reference: reduce soundings by observed tide or a separation model; ellipsoid-referenced surveys need a separation surface to chart datum.

  • Hydrographic uncertainty standards pair horizontal and vertical uncertainty; total vertical uncertainty has depth-dependent and constant terms.

  • Side-scan sonar detects features and texture but does not give reliable depths without calibration.

  • USACE hydrographic survey tolerances are project-specific; check the project specification rather than assuming a universal value.

  • Heave, pitch, and roll are corrected with an IMU; uncorrected motion produces periodic depth artifacts.

Quick reference

Land Development and Design

  • Site plan elements: property lines, setbacks, buildable area, impervious coverage, parking counts, drainage, and utility easements.

  • Parking stall dimensions and drive aisle widths come from local code; accessible stalls require access aisles and van-accessible dimensions per ADA.

  • Rational method Q = CiA (US customary, Q in cfs, A in acres); time of concentration sets the design storm duration.

  • Detention and retention sizing compares pre- and post-development peak flows and volumes; post-development peak must not exceed the allowable release rate.

  • Minimum drainage slopes (commonly 1–2% paved, 2% turf) are set by local standards; verify in the adopted code.

  • Lot area and frontage are measured to the property line or right-of-way line as the ordinance specifies; do not mix the two.

  • Right-of-way is dedicated public access; easements convey specific use rights and do not transfer title.

  • Subdivision plats show bearings, distances, curve data, monument locations, and dedications; approval is by the reviewing authority.

  • Floodplain regulation uses the Base Flood Elevation from the effective FIRM panel; fill and construction are restricted below it.

Quick reference

Photogrammetry

  • Vertical photo scale: S = f/H with H measured above ground; a larger scale means a smaller denominator.

  • Relief displacement d = r·h/H is radial from the principal point; taller objects and larger radial distance displace more.

  • Typical stereo mapping overlap: 60% endlap and 20–30% sidelap; insufficient overlap prevents stereo compilation.

  • Parallax difference relates to elevation: Δh = Δp·H/(b·f), using base b and focal length f.

  • Aerotriangulation (bundle adjustment) solves camera stations and tie points; ground control constrains the solution.

  • Orthophoto removes relief displacement using a DEM; DEM errors appear as local distortion or seam artifacts.

  • Ground sample distance (GSD) is the ground size of one pixel; smaller GSD improves detail and increases data volume.

  • Analytic stereo plotting requires interior, relative, and absolute orientation; check residual statistics before accepting the model.

  • Camera calibration (focal length, principal point, distortion) must be current; uncorrected lens distortion biases coordinates.

Quick reference

Remote Sensing (LiDAR, UAS)

  • LiDAR returns: first, last, and intermediate; a bare-earth DEM requires classification and filtering of vegetation and structures.

  • Point density is points per unit area; multiple returns can produce higher point density than pulse density.

  • LiDAR vertical accuracy is reported as RMSEz against independent checkpoints; remove gross errors before reporting.

  • UAS photogrammetry needs ground control points or RTK/PPK positioning; without them absolute accuracy degrades to several meters.

  • Flight planning sets overlap, altitude, GSD, and wind limits; airspace authorization is required before flight in controlled airspace.

  • NDVI = (NIR − Red)/(NIR + Red), ranging from −1 to 1; vegetation is typically above 0.3.

  • LiDAR intensity is a relative return-strength value, not calibrated reflectance unless corrected.

  • UAS point clouds are photogrammetric surface models unless LiDAR-equipped; vegetation penetration is limited.

  • Change detection requires co-registered datasets; misregistration produces false changes at edges.

Quick reference

Surveying Legal Principles

  • Statute of frauds: land conveyances must be written and signed; oral boundary agreements generally fail unless an exception applies.

  • Recording acts: race, notice, and race-notice statutes set priority among competing interests; a later purchaser may prevail under notice statutes.

  • Easement appurtenant benefits a dominant parcel; easement in gross benefits a person or entity and is not tied to a parcel.

  • Prescription requires adverse use for the statutory period; adverse possession requires the elements plus the statutory period.

  • Boundary by agreement requires a dispute or uncertainty and a meeting of minds; it is not a substitute for a survey.

  • Monument priority: original government monuments control over record distances and areas; retracement follows the original footsteps.

  • Description sufficiency requires a locatable starting point and a closed boundary; ambiguities are resolved by rules of construction.

  • Standard of care: that of a reasonably prudent surveyor in the same community and practice.

  • Surveyors locate boundaries and report evidence; title opinions and title insurance come from attorneys and title companies.