NE Land Surveyor flashcards
NE Land Surveyor · Build recall with a focused review session.
36 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Monument priority rule
- In boundary retracement, undisturbed original monuments control over courses, distances, and area in the record; artificial monuments rank above courses and distances, which rank above area.
- Adverse possession elements
- Actual, open and notorious, exclusive, continuous for the statutory period, and hostile use. The statutory period is set by state law and commonly ranges from 10 to 20 years.
- Accretion versus avulsion
- Accretion is gradual, imperceptible deposition that moves a riparian boundary with the water. Avulsion is sudden, perceptible change that leaves the boundary where it was.
- Meander line
- A line run to compute the area of a fractional lot along a water body; it is evidential only and is not the boundary of record. The water boundary controls.
- Double proportion corner
- A method of restoring a missing section corner using two known corners on each of two intersecting lines, weighting the position by the record distances along those lines.
- Horizontal curve tangent
- The tangent distance from the PC or PT to the PI equals R times the tangent of half the central angle: T = R tan(Δ/2).
- Vertical curve K value
- K equals the curve length divided by the algebraic difference in grades in percent (K = L/|A|); it sets the rate of grade change per station.
- Superelevation equation
- In US customary units, e + f = V²/(15R), where e is superelevation rate, f is side friction factor, V is design speed in mph, and R is radius in feet.
- Average end area volume
- Earthwork volume equals the length between sections times the average of the two end areas: V = L(A1 + A2)/2, with a prismoidal correction for three-level sections.
- Station equation
- A notation where the stationing ahead differs from the stationing back at the same physical point, used at line changes or to remove accumulated stationing.
- Distance-distance layout ambiguity
- Two distances from two known control points intersect at two possible positions; the correct solution must be specified by side of line or by a third check measurement.
- Height of instrument
- HI equals benchmark elevation plus backsight reading. A stake elevation is then HI minus the foresight reading to that stake.
- Layout check shot
- An independent measurement of a laid-out point from a different instrument setup or control pair, used to detect orientation and coordinate blunders before construction proceeds.
- Stake offset sign convention
- Offset equals measured distance minus design distance; the sign and reference side must be recorded on the stake and in the field book to prevent reversed corrections.
- Combined factor
- Grid factor multiplied by elevation factor; grid distance equals ground distance times the combined factor, correcting for projection scale and height above the ellipsoid.
- Geoid height relation
- Orthometric height H equals ellipsoid height h minus geoid height N: H = h − N. Geoid models such as GEOID18 supply N for a region.
- Grid convergence
- The angle between grid north and true north at a point; grid azimuth equals geodetic azimuth plus convergence, and convergence varies with longitude from the central meridian.
- UTM central scale
- Universal Transverse Mercator uses 6-degree zones with central meridian scale factor 0.9996 and false easting 500,000 meters, so scale is not unity away from the meridian.
- Ellipsoid flattening
- Flattening f relates semi-major axis a and semi-minor axis b as b = a(1 − f); eccentricity squared equals 2f − f².
- Topology validation
- Rules that detect gaps, overlaps, dangling nodes, and self-intersections in vector data; violations are reported before analysis so area and network results remain valid.
- Raster resampling methods
- Nearest neighbor preserves categorical values; bilinear and cubic interpolation produce smooth continuous surfaces but can create values not present in the source data.
- Equal-area projection use
- Equal-area projections preserve area relationships, making them suitable for density and land-cover statistics; conformal projections instead preserve local shape and angles.
- Geographic CRS buffer error
- Buffering in a geographic coordinate system uses degrees, so buffer width varies with latitude and is distorted; buffer in an appropriate projected CRS instead.
- Chart datum MLLW
- Mean Lower Low Water is the reference for soundings and charted depths in US waters; charted heights of bridges and clearances reference Mean High Water.
- Multibeam swath width
- Approximate swath width equals twice the depth times the tangent of half the beam angle; resolution and coverage degrade with depth and at outer beams.
- Sound velocity error
- Incorrect sound speed at the transducer refracts beams, producing systematic depth bias or a bowl-shaped artifact; a measured velocity profile is required.
- Tidal datum epoch
- Tidal datums are computed over a 19-year National Tidal Datum Epoch; short-term observations are reduced by comparison with a long-term control station.
- Rational method
- Peak discharge Q equals C times i times A, with C the runoff coefficient, i rainfall intensity, and A drainage area; time of concentration sets the storm duration.
- Detention versus retention
- Detention temporarily stores stormwater and releases it at a controlled rate; retention holds water permanently, as in a wet pond, without direct discharge.
- Right-of-way versus easement
- Right-of-way is dedicated land for public access and improvements; an easement grants specific use rights over land without transferring title.
- Relief displacement
- On a vertical photograph, displacement d equals r times h divided by H, where r is radial distance from the principal point and h is object height.
- Photographic scale
- Scale equals focal length divided by flying height above ground (S = f/H); a larger scale means a smaller denominator and more ground detail.
- LiDAR RMSEz
- Vertical accuracy of a LiDAR-derived surface is reported as root mean square error in z, computed against independent surveyed checkpoints rather than the point cloud.
- NDVI formula
- Normalized Difference Vegetation Index equals (NIR − Red)/(NIR + Red), ranging from −1 to 1; healthy vegetation typically returns values above 0.3.
- Recording act notice
- Under a notice statute, a later purchaser who takes without notice of a prior unrecorded interest prevails; race-notice statutes add the requirement to record first.
- Easement by necessity
- An implied easement arising when a parcel is landlocked by severance from a common owner; it requires unity of title and strict necessity of access.