Commissioning (Cx)

A quality-focused process for verifying that building systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner's project requirements.

Related: Owner's Project Requirements, Commissioning Authority, Functional Performance Test
Commissioning Authority (CxA)

The qualified person or firm leading and documenting the commissioning process, independent of the design and construction contractors, who reviews design, coordinates testing, and reports findings to the owner.

Related: Commissioning (Cx), Owner's Project Requirements
Owner's Project Requirements (OPR)

A written document capturing the owner's functional needs, performance criteria, and expectations for the building, forming the benchmark against which commissioned systems are evaluated.

Related: Basis of Design, Commissioning Plan
Basis of Design (BOD)

A record describing the design assumptions, calculations, codes, and system selections used by the design team, showing how the design responds to the owner's project requirements.

Related: Owner's Project Requirements, Design Review
Commissioning Plan

The document defining scope, roles, schedule, documentation, and test procedures for the commissioning process, guiding how each system will be verified from design through acceptance.

Related: Commissioning Authority (CxA), Commissioning (Cx)
Design Review

A commissioning-phase activity in which the CxA examines design documents for clarity, maintainability, testability, and consistency with the owner's project requirements before construction begins.

Related: Basis of Design, Owner's Project Requirements, Issues Log
Pre-Functional Checklist

A structured verification list used during construction to confirm that equipment is installed, wired, labeled, and accessible before any performance testing starts.

Related: Functional Performance Test, Installation Verification
Functional Performance Test (FPT)

A documented test that operates a system under normal, part-load, and failure conditions to demonstrate it performs according to the design intent and the owner's project requirements.

Related: Pre-Functional Checklist, Test Procedure, Seasonal Testing
Test Procedure

A written step-by-step script specifying prerequisites, actions, measurement points, expected results, and acceptance criteria for a commissioning test.

Related: Functional Performance Test, Acceptance Criteria
Acceptance Criteria

The measurable limits or conditions a system must satisfy to pass a test, such as airflow tolerance, temperature control band, or response time, defined before testing begins.

Related: Test Procedure, Functional Performance Test
Installation Verification

Confirmation that equipment and components are installed per manufacturer instructions, contract documents, and approved submittals, typically recorded in pre-functional checklists before testing.

Related: Pre-Functional Checklist, Submittal Review
Submittal Review

The commissioning team's check of contractor product data and shop drawings for consistency with the basis of design, especially regarding performance, controls, and maintainability requirements.

Related: Basis of Design, Installation Verification
Issues Log

A running register of problems, deficiencies, and open questions found during commissioning, tracking responsible party, status, and resolution date until each item is closed.

Related: Design Review, Deficiency
Deficiency

A condition where installed work or system performance fails to meet contract documents, design intent, or owner requirements, requiring correction and retesting before acceptance.

Related: Issues Log, Retesting
Retesting

Repeat performance testing performed after a deficiency has been corrected, to confirm the system now satisfies the acceptance criteria documented in the original test procedure.

Related: Deficiency, Functional Performance Test
Seasonal Testing

Deferred performance verification conducted when weather conditions allow testing of heating, cooling, or other modes that cannot be exercised during initial acceptance testing.

Related: Functional Performance Test, Commissioning Plan
Controls Point-to-Point Check

A verification that each sensor, actuator, and controller input or output is wired to the correct terminal and responds correctly, confirming the control system's physical and logical mapping.

Related: Sequence of Operation, Trend Log
Sequence of Operation

The written description of how a system's controls are intended to respond to conditions, setpoints, schedules, and failures, used as the basis for functional testing.

Related: Controls Point-to-Point Check, Functional Performance Test
Trend Log

Recorded time-series data from a building automation system showing values such as temperature, pressure, valve position, or status over time, used to evaluate control performance.

Related: Sequence of Operation, Controls Point-to-Point Check
Systems Manual

A consolidated reference for building operators containing design intent, equipment data, control sequences, maintenance requirements, and commissioning records for installed systems.

Related: Training Verification, Record Documents
Training Verification

Confirmation that the owner's operating staff received adequate instruction on equipment and controls, with attendance, content, and competency documented before handover.

Related: Systems Manual, Commissioning (Cx)
Record Documents

As-built drawings, submittals, test reports, and other project records updated to reflect actual installed conditions, retained for operations and future commissioning activities.

Related: Systems Manual, Submittal Review
Commissioning Report

The final deliverable summarizing commissioning scope, tests performed, results, unresolved issues, and recommendations, documenting that the process was completed as planned.

Related: Commissioning Plan, Issues Log
Substantial Completion

The project milestone when work is sufficiently complete for the owner to use the building for its intended purpose, often triggering final testing and commissioning documentation deadlines.

Related: Commissioning Report, Seasonal Testing
Retrocommissioning (RCx)

A commissioning process applied to existing buildings not previously commissioned, aimed at identifying low-cost operational improvements and restoring performance to current requirements.

Related: Existing Building Commissioning, Monitoring-Based Commissioning
Existing Building Commissioning

A systematic investigation of an operating building's systems to document current performance, identify inefficiencies, and implement corrective measures, often including retrocommissioning and ongoing activities.

Related: Retrocommissioning (RCx), Monitoring-Based Commissioning
Monitoring-Based Commissioning (MBCx)

Ongoing commissioning supported by continuous data trending and analytics, using meter and building automation data to detect faults and sustain performance over time.

Related: Trend Log, Retrocommissioning (RCx)
Total Building Commissioning

A comprehensive approach that commissions all interrelated systems and assemblies, including envelope, structure, and interiors, rather than only mechanical and electrical systems.

Related: Commissioning (Cx), Building Envelope Commissioning
Building Envelope Commissioning

Verification that the building enclosure, including walls, roofs, windows, and air barriers, meets performance requirements for water, air, thermal, and vapor control.

Related: Total Building Commissioning, Functional Performance Test
Design Intent

The designer's documented explanation of how and why systems were selected and configured, used by the commissioning team to judge whether observed performance matches expectations.

Related: Basis of Design, Sequence of Operation
Systems Manual

A single organized document set giving operations staff the information needed to understand, operate, and maintain commissioned systems, including design intent and test results.

Related: Training Verification, Commissioning Report
Air Balancing

The measurement and adjustment of airflow in ducts and at terminals so each zone receives design quantities within specified tolerances, verified during functional testing.

Related: Acceptance Criteria, Functional Performance Test
Test, Adjust, and Balance (TAB)

The contractor activity of measuring and adjusting air and water flows to design values, producing a certified report that commissioning uses as a baseline for performance testing.

Related: Air Balancing, Functional Performance Test
Integrated Systems Test

A test exercising multiple systems together, such as fire alarm, smoke control, and HVAC, to confirm coordinated responses under normal and emergency scenarios.

Related: Functional Performance Test, Sequence of Operation
Warranty Review

A late commissioning activity near the end of the warranty period that checks whether systems still perform as accepted and addresses unresolved or recurring problems.

Related: Commissioning Report, Issues Log
Lessons Learned

A post-project review capturing what worked and what did not during commissioning, used to improve future project requirements, design, construction, and commissioning practices.

Related: Commissioning Report, Owner's Project Requirements