NEBB Building Systems Commissioning Certified Professional key terms
NEBB Building Systems Commissioning Certified Professional · Get comfortable with the vocabulary.
- Commissioning (Cx)
- Related: Owner's Project Requirements, Commissioning Authority, Functional Performance Test
A quality-focused process for verifying that building systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the owner's project requirements.
- Commissioning Authority (CxA)
- Related: Commissioning (Cx), Owner's Project Requirements
The qualified person or firm leading and documenting the commissioning process, independent of the design and construction contractors, who reviews design, coordinates testing, and reports findings to the owner.
- Owner's Project Requirements (OPR)
- Related: Basis of Design, Commissioning Plan
A written document capturing the owner's functional needs, performance criteria, and expectations for the building, forming the benchmark against which commissioned systems are evaluated.
- Basis of Design (BOD)
- Related: Owner's Project Requirements, Design Review
A record describing the design assumptions, calculations, codes, and system selections used by the design team, showing how the design responds to the owner's project requirements.
- Commissioning Plan
- Related: Commissioning Authority (CxA), Commissioning (Cx)
The document defining scope, roles, schedule, documentation, and test procedures for the commissioning process, guiding how each system will be verified from design through acceptance.
- Design Review
- Related: Basis of Design, Owner's Project Requirements, Issues Log
A commissioning-phase activity in which the CxA examines design documents for clarity, maintainability, testability, and consistency with the owner's project requirements before construction begins.
- Pre-Functional Checklist
- Related: Functional Performance Test, Installation Verification
A structured verification list used during construction to confirm that equipment is installed, wired, labeled, and accessible before any performance testing starts.
- Functional Performance Test (FPT)
- Related: Pre-Functional Checklist, Test Procedure, Seasonal Testing
A documented test that operates a system under normal, part-load, and failure conditions to demonstrate it performs according to the design intent and the owner's project requirements.
- Test Procedure
- Related: Functional Performance Test, Acceptance Criteria
A written step-by-step script specifying prerequisites, actions, measurement points, expected results, and acceptance criteria for a commissioning test.
- Acceptance Criteria
- Related: Test Procedure, Functional Performance Test
The measurable limits or conditions a system must satisfy to pass a test, such as airflow tolerance, temperature control band, or response time, defined before testing begins.
- Installation Verification
- Related: Pre-Functional Checklist, Submittal Review
Confirmation that equipment and components are installed per manufacturer instructions, contract documents, and approved submittals, typically recorded in pre-functional checklists before testing.
- Submittal Review
- Related: Basis of Design, Installation Verification
The commissioning team's check of contractor product data and shop drawings for consistency with the basis of design, especially regarding performance, controls, and maintainability requirements.
- Issues Log
- Related: Design Review, Deficiency
A running register of problems, deficiencies, and open questions found during commissioning, tracking responsible party, status, and resolution date until each item is closed.
- Deficiency
- Related: Issues Log, Retesting
A condition where installed work or system performance fails to meet contract documents, design intent, or owner requirements, requiring correction and retesting before acceptance.
- Retesting
- Related: Deficiency, Functional Performance Test
Repeat performance testing performed after a deficiency has been corrected, to confirm the system now satisfies the acceptance criteria documented in the original test procedure.
- Seasonal Testing
- Related: Functional Performance Test, Commissioning Plan
Deferred performance verification conducted when weather conditions allow testing of heating, cooling, or other modes that cannot be exercised during initial acceptance testing.
- Controls Point-to-Point Check
- Related: Sequence of Operation, Trend Log
A verification that each sensor, actuator, and controller input or output is wired to the correct terminal and responds correctly, confirming the control system's physical and logical mapping.
- Sequence of Operation
- Related: Controls Point-to-Point Check, Functional Performance Test
The written description of how a system's controls are intended to respond to conditions, setpoints, schedules, and failures, used as the basis for functional testing.
- Trend Log
- Related: Sequence of Operation, Controls Point-to-Point Check
Recorded time-series data from a building automation system showing values such as temperature, pressure, valve position, or status over time, used to evaluate control performance.
- Systems Manual
- Related: Training Verification, Record Documents
A consolidated reference for building operators containing design intent, equipment data, control sequences, maintenance requirements, and commissioning records for installed systems.
- Training Verification
- Related: Systems Manual, Commissioning (Cx)
Confirmation that the owner's operating staff received adequate instruction on equipment and controls, with attendance, content, and competency documented before handover.
- Record Documents
- Related: Systems Manual, Submittal Review
As-built drawings, submittals, test reports, and other project records updated to reflect actual installed conditions, retained for operations and future commissioning activities.
- Commissioning Report
- Related: Commissioning Plan, Issues Log
The final deliverable summarizing commissioning scope, tests performed, results, unresolved issues, and recommendations, documenting that the process was completed as planned.
- Substantial Completion
- Related: Commissioning Report, Seasonal Testing
The project milestone when work is sufficiently complete for the owner to use the building for its intended purpose, often triggering final testing and commissioning documentation deadlines.
- Retrocommissioning (RCx)
- Related: Existing Building Commissioning, Monitoring-Based Commissioning
A commissioning process applied to existing buildings not previously commissioned, aimed at identifying low-cost operational improvements and restoring performance to current requirements.
- Existing Building Commissioning
- Related: Retrocommissioning (RCx), Monitoring-Based Commissioning
A systematic investigation of an operating building's systems to document current performance, identify inefficiencies, and implement corrective measures, often including retrocommissioning and ongoing activities.
- Monitoring-Based Commissioning (MBCx)
- Related: Trend Log, Retrocommissioning (RCx)
Ongoing commissioning supported by continuous data trending and analytics, using meter and building automation data to detect faults and sustain performance over time.
- Total Building Commissioning
- Related: Commissioning (Cx), Building Envelope Commissioning
A comprehensive approach that commissions all interrelated systems and assemblies, including envelope, structure, and interiors, rather than only mechanical and electrical systems.
- Building Envelope Commissioning
- Related: Total Building Commissioning, Functional Performance Test
Verification that the building enclosure, including walls, roofs, windows, and air barriers, meets performance requirements for water, air, thermal, and vapor control.
- Design Intent
- Related: Basis of Design, Sequence of Operation
The designer's documented explanation of how and why systems were selected and configured, used by the commissioning team to judge whether observed performance matches expectations.
- Systems Manual
- Related: Training Verification, Commissioning Report
A single organized document set giving operations staff the information needed to understand, operate, and maintain commissioned systems, including design intent and test results.
- Air Balancing
- Related: Acceptance Criteria, Functional Performance Test
The measurement and adjustment of airflow in ducts and at terminals so each zone receives design quantities within specified tolerances, verified during functional testing.
- Test, Adjust, and Balance (TAB)
- Related: Air Balancing, Functional Performance Test
The contractor activity of measuring and adjusting air and water flows to design values, producing a certified report that commissioning uses as a baseline for performance testing.
- Integrated Systems Test
- Related: Functional Performance Test, Sequence of Operation
A test exercising multiple systems together, such as fire alarm, smoke control, and HVAC, to confirm coordinated responses under normal and emergency scenarios.
- Warranty Review
- Related: Commissioning Report, Issues Log
A late commissioning activity near the end of the warranty period that checks whether systems still perform as accepted and addresses unresolved or recurring problems.
- Lessons Learned
- Related: Commissioning Report, Owner's Project Requirements
A post-project review capturing what worked and what did not during commissioning, used to improve future project requirements, design, construction, and commissioning practices.