NEBB Testing, Adjusting and Balancing Certified Technician (CT) · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Air Systems Testing, Adjusting and Balancing & Test Instruments and Measurement Techniques

  • Map the standard air-side TAB sequence (fan rotation, static profile, terminal airflow, diversity) and write it out from memory without notes

  • Compute duct velocity, velocity pressure, and CFM from VP readings for 10 practice duct traverses using a pitot tube

  • Identify and label the parts of a pitot tube, inclined manometer, and rotating-vane anemometer, and state the application limits of each

  • Correct at least 8 barometric-pressure and temperature readings for altitude and density using the standard correction formulas

Your checkpoint

A one-page air-side TAB sequence flowchart plus a 10-row traverse calculation worksheet with density-corrected CFM values

Week 2

Air Systems Testing, Adjusting and Balancing & System and Equipment Fundamentals (fans, pumps, coils, dampers, valves)

  • Diagnose five fan-curve scenarios (system effect, backward-curved vs. forward-curved, wrong rotation) and select the corrective action for each

  • Calculate fan Laws 1, 2, and 3 predictions for speed and RPM changes on three practice fan systems

  • Explain how opposed-blade versus parallel-blade dampers affect airflow and select the correct damper type for four given applications

  • Perform a proportional balancing exercise on a 6-terminal branch, ordering the terminals and documenting the adjustment order

Your checkpoint

A completed 6-terminal proportional balancing worksheet showing initial readings, adjustment order, and final readings within 10% of design

Week 3

Hydronic Systems Testing, Adjusting and Balancing & System and Equipment Fundamentals (fans, pumps, coils, dampers, valves)

  • Trace a hydronic loop from pump discharge through coils, balance valves, and return, and label each component's TAB function

  • Compute pump head, flow, and brake horsepower from a given pump curve for at least five operating points

  • Differentiate two-way, three-way, and pressure-independent control valves and predict the flow effect of each in three circuit sketches

  • Calculate coil water-side temperature difference and GPM from a given load, and verify against a design schedule

Your checkpoint

A labeled hydronic loop schematic with a 5-row pump operating-point table showing flow, head, and BHP calculations

Week 4

Hydronic Systems Testing, Adjusting and Balancing & Test Instruments and Measurement Techniques

  • Read and record differential pressure across a balancing valve and convert it to GPM using a manufacturer valve-coefficient chart for 10 practice points

  • Compare ultrasonic, venturi, orifice, and pitot-based hydronic flow measurement methods and state the accuracy trade-offs of each

  • Set up a differential pressure gauge and a differential pressure transmitter in a practice rig and record three repeat readings to verify repeatability

  • Describe the procedure for verifying instrument calibration and state the maximum allowable drift for each measurement type used

Your checkpoint

A 10-point valve-flow conversion log with computed GPM, plus a written calibration-check checklist for each instrument used

Week 5

NEBB Procedural Standards, Specifications, and Report Forms & Air Systems Testing, Adjusting and Balancing

  • Outline the NEBB procedural steps for a complete air-system TAB project, from pre-bid review through final report

  • Distinguish design intent documents, specifications, and submittals, and identify what each controls in a TAB scope

  • List the required contents of a final TAB report and match each section to the field data that feeds it

  • Draft a deficiency log entry for three typical field conditions (low airflow, high static, short belt life) using proper TAB terminology

Your checkpoint

A report-table-of-contents skeleton populated with the field data sources for each section, plus three written deficiency log entries

Week 6

NEBB Procedural Standards, Specifications, and Report Forms & Hydronic Systems Testing, Adjusting and Balancing

  • Complete a full set of air and water test report forms for a mock 10-terminal, 3-loop project using plausible field data

  • Identify the specification requirements that would trigger a re-test or a formal non-conformance report

  • Order the pre-functional checklist, functional performance test, and final balancing steps into the correct sequence for a combined air and water project

  • Verify that a completed report form is internally consistent (design versus actual, diversity, tolerances) for at least eight checks

Your checkpoint

A completed mock air-and-water TAB report package covering 10 terminals and 3 hydronic loops with an internal consistency check sheet

Week 7

Safety, Jobsite Practices, and Coordination with Other Trades & System and Equipment Fundamentals (fans, pumps, coils, dampers, valves)

  • Identify the required PPE and lockout/tagout steps before working on a fan or pump, and write the safe-start procedure for each

  • Explain coordination requirements with mechanical, electrical, controls, and commissioning trades for five typical schedule conflicts

  • Recognize the safety hazards of working near energized equipment, rotating shafts, and pressurized hydronic systems, and state the control for each

  • Describe the correct handling, storage, and calibration protection procedures for test instruments on a jobsite

Your checkpoint

A one-page jobsite safety and coordination checklist covering PPE, LOTO, and trade-interface steps for a typical TAB site visit

Week 8

Air Systems Testing, Adjusting and Balancing & Hydronic Systems Testing, Adjusting and Balancing & Test Instruments and Measurement Techniques & NEBB Procedural Standards, Specifications, and Report Forms & System and Equipment Fundamentals (fans, pumps, coils, dampers, valves) & Safety, Jobsite Practices, and Coordination with Other Trades

  • Complete two full-length timed practice exams and score each domain separately to identify remaining weak areas

  • Re-work every missed question from both practice exams and write a corrected answer with the supporting principle

  • Re-derive from memory the air and water formulas (CFM from VP, GPM from ΔP, fan laws, pump laws) without reference

  • Review the weakest two domains and redo one focused drill for each

Your checkpoint

A scored practice-exam summary with per-domain percentages, a list of corrected missed items, and a one-page formula sheet written from memory

Milestones

Week 2: Complete a 6-terminal proportional air balance on paper, with final readings within 10% of design and a written adjustment order

Week 4: Score at least 75% on a self-made 25-question quiz covering Domains 1, 2, 3, and 5, and correctly convert 10 valve ΔP readings to GPM

Week 6: Produce a complete mock air-and-water TAB report package that passes an internal consistency check on at least 8 criteria

Week 8: Score at least 80% overall on both timed practice exams, with no single domain below 70%