A 12,000 m² single-storey distribution warehouse stores 600 pallets of aerosol deodorants and 200 pallets of water-based paint in racking up to 8 m high. The building has a sprinkler system designed to an older specification, smoke ventilation, and a BS 5839-1 L1 alarm. On a Friday afternoon, a sprinkler control valve is found closed after a repair; the contractor says the system will be out of service until Monday. The warehouse operates 24/7 with 35 staff per shift. There are two 100 mm fire hydrants on site but the nearest fire station is 12 minutes away. A hot-work permit was issued yesterday for racking repair, but the permit has no fire watch recorded after work. Housekeeping is poor: cardboard packaging is stored against an electrical distribution board, and a forklift battery charging area has no ventilation. The site fire plan is three years old and does not include the new high-bay racking.

1. Assess whether the warehouse should continue operating while the sprinkler system is isolated. Justify your decision and state the interim measures you would require.

Read the worked answer

The decision should not be a simple 'continue' or 'stop'. The sprinkler system is the principal suppression for a high-challenge fire involving aerosols and high-bay racking, and it will be unavailable for up to three days. The fire service response of about 12 minutes is unlikely to prevent a large fire in 8 m racking. Continuing normal operations would leave a significant residual risk.

My judgement: the site should not continue full operations unless robust compensatory measures are in place and the insurer and fire and rescue service have been consulted. At minimum:

  • implement a written impairment procedure and notify the insurer and FRS;
  • stop receipt of further aerosol stock and reduce aerosol pallets in the affected area;
  • prohibit all hot work and other ignition sources;
  • provide a trained fire watch with patrols at defined intervals, backed by a written log, for the whole impairment period;
  • confirm the alarm, smoke ventilation and hydrants are operational;
  • clear combustibles from around electrical equipment and the charging area;
  • brief all shift staff and brief the fire service on arrival.

If those measures cannot be resourced, or if the sprinkler cannot be restored by Monday, I would recommend shutting down storage of aerosols and restricting the warehouse to low-hazard goods. A fire watch is a warning/response measure, not a substitute for suppression, so it should be time-limited and reviewed daily.

2. Identify the fire prevention and protection deficiencies and recommend improvements.

Read the worked answer

Deficiencies and improvements:

  • Hot-work permit without a fire watch record. The permit is incomplete. Require a signed permit with area preparation, removal of combustibles, fire watch during work and for at least the specified post-work period, and a final check. The contractor should be inducted and supervised.
  • Cardboard against an electrical distribution board. This combines fuel with an ignition source. Remove waste, provide designated waste storage away from the building/electrical equipment, and include housekeeping in daily checks.
  • Forklift battery charging without ventilation. Charging can produce hydrogen; provide a ventilated, fire-resisting charging area, control ignition sources, and train staff.
  • Sprinkler impairment. As above: impairment procedure, compensatory fire watch, insurer/FRS notification, urgent restoration.
  • Out-of-date fire plan. It must include the high-bay racking, aerosol storage, evacuation routes, assembly points, isolation points and contact details; staff need training and drills.
  • Protection design. The 8 m racking and aerosol storage may exceed the original sprinkler design; a fire engineer should verify coverage, in-rack sprinklers and smoke ventilation.

The prevention priority is to remove ignition sources and keep combustibles away from electrical equipment; the protection priority is to restore sprinklers and maintain detection/ventilation.