Quick reference

Fire Safety Management: Legal Duties and Management Systems

  • UK framework: Regulatory Reform (Fire Safety) Order 2005 (England and Wales) imposes a duty on the 'responsible person' to carry out a suitable and sufficient fire risk assessment, apply prevention and protection measures, and record significant findings where 5 or more employees are employed (or a licence is in force).

  • Scotland uses the Fire (Scotland) Act 2005 and the Fire Safety (Scotland) Regulations 2006; Northern Ireland uses the Fire and Rescue Services (Northern Ireland) Order 2006 with the Fire Safety Regulations (NI) 2010 - duties are analogous but the enforcing authority and terminology differ.

  • Hierarchy of control applied to fire: eliminate the hazard (remove/replace flammable materials, avoid hot work), reduce (substitute less hazardous substances, minimise quantities), then protect (detection, compartmentation, suppression, escape).

  • The fire risk assessment is a continuous cycle: identify hazards, identify people at risk, evaluate/remove/reduce risk, record, implement and plan, then review and revise - review triggers include changes to work, new plant, building alterations, or a near miss.

  • Safety management system elements (Plan-Do-Check-Act): policy, organising (competent persons, clear roles), planning and implementing, measuring performance (audits, inspections, KPIs), and review/audit by senior management.

  • Competence is a legal expectation: the responsible person must appoint 'competent persons' with sufficient training, experience and knowledge; where in-house competence is absent, a competent external assessor must be used.

  • Enforcement tools: alteration/ enforcement notices, prohibition notices (serious personal injury risk), and prosecution; penalties include unlimited fines and up to 2 years' imprisonment for the most serious offences in England and Wales.

  • Records to retain: fire risk assessments and reviews, training records, drills and evacuation times, maintenance and testing of detection, alarms, emergency lighting and extinguishers, and statutory testing of gas/electrical installations.

  • Fire safety information must be provided to employees, contractors, temporary staff and, where relevant, residents and visitors - including emergency plan, location of exits, and the identity of fire marshals.

Quick reference

Fire Risk Assessment and Control: Method, Likelihood and Mitigation

  • Risk = likelihood of ignition/ fire occurring x severity of consequence (life safety, property, business interruption); a common qualitative scale is 1-5 for each, giving a risk rating banded low/medium/high/very high.

  • Five-step model: (1) identify fire hazards - ignition sources, fuel, oxygen; (2) identify people at risk - including those asleep, disabled, lone workers, visitors, contractors; (3) evaluate, remove or reduce risk and protect from remaining risk; (4) record, plan, instruct, inform and train; (5) review.

  • Fire triangle / tetrahedron: fuel, oxygen, heat and (for combustion chain) the uninhibited chemical chain reaction - extinguishing agents act by removing one or more of these.

  • Ignition source audit: fixed electrical installations, portable appliance testing, hot work permits, smoking controls, cooking equipment, heating appliances, process heat, static discharge, and machinery friction/sparks.

  • Fuel load management: minimise stored combustibles, segregate flammables in fire-resisting stores, control waste accumulation, use flame-retardant furnishings, and keep escape routes clear of combustible storage.

  • Likelihood scoring should consider historical incidents, housekeeping standards, presence of arson-attractive materials, security (external waste bins, letterboxes), and the effectiveness of existing controls.

  • Severity scoring should consider occupant numbers, mobility and familiarity, sleeping risk, time to escape, building height and complexity, and proximity of other occupied buildings or hazardous installations.

  • Residual risk must be judged against a tolerance threshold; if the residual risk is not acceptable, additional controls are required before work continues, and the decision and rationale must be recorded.

  • Dynamic assessment: a personal (dynamic) risk assessment at the point of work is required for non-routine tasks such as hot work, and a specific assessment is needed for young persons, pregnant workers and new/inexperienced staff.

Quick reference

Fire Prevention and Protection: Principles and Systems

  • Fire prevention prioritises eliminating ignition sources and controlling fuel; fire protection limits the consequences through detection, warning, compartmentation, suppression and escape provision.

  • Fire extinguisher selection: water (Class A), foam (Class A and B, not on live electrical or cooking oil), CO2 (Class B and electrical, no cooling effect - re-ignition risk), dry powder (multi-purpose but can impair vision and damage equipment), wet chemical (Class F cooking oils).

  • Detection choice: ionisation smoke detectors respond well to fast-flaming fires; optical detectors suit smouldering fires; heat detectors suit dusty or smoky environments but respond later; aspirating (ASD) systems suit difficult-access or high-airflow spaces.

  • Alarm system categories (BS 5839): L1 full coverage throughout, L2 coverage in defined areas plus escape routes, L3 escape routes plus rooms opening onto them, L4 escape routes only, L5 specific areas; P categories protect property.

  • Emergency lighting (BS 5266) is required for escape routes, open areas over 60 m2, and where failure of normal lighting creates danger; it must provide at least 1 lux along escape route centre lines and 0.5 lux in open areas.

  • Sprinkler systems: wet pipe (fastest, most common), dry pipe (unheated spaces), pre-action (water-sensitive areas such as IT or archives), deluge (high-hazard rapid application); a sprinkler operates individually when its heat-sensitive element fuses, typically 68 degrees C.

  • Smoke control: natural ventilation (vents, smoke shafts) and mechanical systems (pressurisation of escape stairs, smoke extract) maintain tenability on escape routes; pressurisation must be commissioned and tested to prove pressure differentials.

  • Explosion prevention: control of flammable vapours, ATEX/DSEAR classification of hazardous zones, ventilation, inerting, and explosion relief or suppression where a flammable atmosphere cannot be excluded.

  • Passive protection: fire-resisting construction (walls, floors, doors), fire doors kept closed or held open by fail-safe devices linked to the alarm, cavity barriers, and penetration sealing of service risers.

Quick reference

Fire Safety of Buildings and People: Means of Escape and Evacuation

  • Means of escape principle: escape must be possible in one direction to a place of relative safety, then two directions to a place of ultimate safety (open air or protected route) - travel distances depend on occupancy, use and whether the route is single-direction.

  • Occupancy capacity: escape routes are sized by width, typically 1 mm per person for level routes and 2 mm per person for stairs (with minimum widths around 750-1000 mm); exit widths must accommodate the total number of occupants likely to be present.

  • Number of exits: a single exit is only acceptable for small, low-risk, ground-floor premises with limited travel distance and occupant numbers; otherwise at least two independent exits are required.

  • Protected escape routes must have fire-resisting construction, be kept clear and self-closing fire doors must not be wedged; a protected route should not pass through high fire-risk areas or be used for storage.

  • Stairs: protected stair enclosures are required where escape relies on them; final exits must open in the direction of travel where large numbers are present, and exits must never be locked without a fail-safe means of opening.

  • Assembly points must be remote from the building and clear of fire service access; roll call or sweep systems confirm all persons are accounted for, and evacuation times should be measured and recorded at drills.

  • Phased or progressive evacuation (horizontal evacuation to a compartment, then full evacuation) is used in hospitals, care homes and high-rise buildings; stay-put policies require compartmentation, alarm zoning and resident communication.

  • Persons at greater risk: mobility, visual or hearing impairment, temporary injury, pregnancy, lone workers and those unfamiliar with the building require personal emergency evacuation plans (PEEPs) and designated assistance.

  • Fire safety signage (ISO 7010) and emergency lighting must mark escape routes, exits and fire-fighting equipment; signage must be visible under both normal and emergency lighting conditions.