Process safety management fundamentals and leadership

  • Process safety management (PSM) focuses on preventing catastrophic releases of hazardous substances, distinct from occupational safety which targets individual injury.

  • A process safety management system typically includes 14 elements (e.g., process safety information, process hazard analysis, operating procedures, training, mechanical integrity, management of change, pre-startup safety review, hot work permit, compliance audits, incident investigation, emergency planning, trade secrets).

  • Leadership commitment is demonstrated through visible safety walks, resource allocation, and setting clear process safety goals; safety culture maturity models (e.g., Hudson, DuPont Bradley) describe progression from reactive to generative.

  • Key performance indicators (KPIs) for process safety include both lagging (incident rates, releases) and leading (number of PHAs completed, action item closure rate, training completion).

  • Process safety culture is assessed via surveys and interviews; common weaknesses include normalization of deviance, complacency, and poor communication.

  • Regulatory frameworks: OSHA PSM (29 CFR 1910.119) and EPA RMP (40 CFR 68) in the US; Seveso III Directive in Europe; COMAH in the UK.

  • Risk-based process safety (RBPS) by CCPS uses four pillars: commit to process safety, understand hazards and risks, manage risks, learn from experience.

  • Leadership must ensure process safety information (PSI) is complete and up to date, including material and energy balances, P&IDs, and equipment design data.

Quick reference

Process safety hazards and risk assessment

  • Hazard identification techniques: HAZOP (guide words applied to nodes), What-If analysis, FMEA, and fault tree analysis (FTA).

  • Risk = probability × consequence; individual risk (per person) and societal risk (F-N curves) are used for land-use planning.

  • HAZOP uses guide words (No, More, Less, As well as, Part of, Reverse, Other than) with process parameters to identify deviations and their causes and consequences.

  • Layer of protection analysis (LOPA) determines if independent protection layers (IPLs) reduce risk to tolerable levels; each IPL must be independent, specific, dependable, and auditable.

  • Fault tree analysis is deductive, starting from a top event and using Boolean logic gates to find contributing failures; minimal cut sets identify critical failure combinations.

  • Consequence modeling includes fire (pool, jet, flash), explosion (vapor cloud, BLEVE), and toxic dispersion; software like PHAST or ALOHA is used.

  • Tolerable risk criteria: ALARP (as low as reasonably practicable) principle; risk reduction is required unless cost is grossly disproportionate to benefit.

  • Safety integrity level (SIL) is determined via risk graph, LOPA, or risk matrix; SIL 1 to 4 correspond to increasing risk reduction.

Quick reference

Process design, engineering controls and change management

  • Inherent safety principles: minimize, substitute, moderate, and simplify; apply early in design to reduce reliance on add-on controls.

  • Engineering controls include relief systems (pressure relief valves, rupture discs), detection systems (gas, fire), and emergency shutdown systems.

  • Management of change (MOC) process: identify change, assess hazards, approve, implement, and update documentation; temporary changes also require MOC.

  • Pre-startup safety review (PSSR) confirms construction and equipment meet design specifications, safety, operating, maintenance, and emergency procedures are in place, and MOC has been completed.

  • Process safety information (PSI) includes hazards of materials, technology, and equipment; it must be updated after any change.

  • Relief system design follows codes such as API 520/521; sizing considers fire exposure, blocked outlet, and control valve failure scenarios.

  • Safety instrumented systems (SIS) are designed per IEC 61511; SIL verification includes architectural constraints and proof-test intervals.

  • Human factors in design: control room ergonomics, alarm management (EEMUA 191), and console layout to reduce operator error.

Quick reference

Operating procedures, competence and human factors

  • Operating procedures must be written, accessible, and current; they cover startup, normal operation, shutdown, and emergency operations.

  • Competence assurance includes initial training, refresher training, and assessment; training records must be maintained.

  • Human error types: slips (attention failures), lapses (memory failures), mistakes (rule-based or knowledge-based), and violations.

  • Human reliability analysis (HRA) techniques include THERP, HEART, and CREAM; they estimate human error probabilities (HEPs).

  • Alarm management: alarm flood is more than 10 alarms per 10 minutes per operator; target is fewer than 6 alarms per hour per operator (EEMUA 191).

  • Fatigue risk management includes shift design, maximum work hours, and rest breaks; circadian effects increase error rates on night shifts.

  • Safety-critical tasks require independent verification (two-person rule) and clear communication (e.g., three-way communication).

  • Human factors integration in design considers workload, situation awareness, and interface usability; poor design contributes to incidents.

Quick reference

Emergency preparedness, incident investigation and assurance

  • Emergency response plan (ERP) must include roles, communication, evacuation, and drills; it is tested through exercises (tabletop, functional, full-scale).

  • Incident investigation aims to find root causes, not blame; techniques include 5 Whys, Fishbone (Ishikawa), Fault Tree, and TapRooT®.

  • Root cause analysis (RCA) should identify management system deficiencies; findings must lead to corrective actions with tracking.

  • Assurance activities include audits, inspections, management reviews, and key performance indicator monitoring; they verify PSM system effectiveness.

  • Compliance audits (OSHA PSM) must be conducted at least every three years; findings require corrective action plans.

  • Emergency drills should be evaluated for effectiveness and lessons learned incorporated into the ERP.

  • Incident investigation reports should include timeline, sequence of events, root causes, and recommendations; they are shared for organizational learning.

  • Performance indicators: leading (e.g., number of near misses reported) and lagging (e.g., lost time injury rate, process safety incidents).