Week 1

Water supply principles, hydraulics, and flow calculations & Mobile water supply apparatus design, components, and water systems

  • Compute fire flow for a 2,000 ft² single-family dwelling using the NFF formula and the Iowa rate-of-flow method, then reconcile the two results and explain the difference in writing.

  • Convert between gallons, cubic feet, pounds of water, and tons of water for five tank sizes, showing each conversion step.

  • Calculate static, residual, and flow pressures from a nozzle pressure and friction loss scenario, and identify which pressure reading indicates a supply problem.

  • Diagram the water path through a mobile water supply apparatus from tank fill to pump discharge to dump valve, labeling every component and valve.

  • List the tank-to-pump and pump-to-tank piping requirements and tank baffling considerations for a 2,500-gallon apparatus, citing the applicable NFPA standard by number and edition year.

Your checkpoint

A one-page hydraulic cheat sheet with five worked flow and pressure problems, each showing formula, substitution, units, and answer.

Week 2

Water supply principles, hydraulics, and flow calculations & Water shuttle operations, dump site selection, and large-volume water movement

  • Calculate the water shuttle flow rate for a given round-trip time, tank size, and number of apparatus, then solve for the number of apparatus needed to hit a target flow.

  • Determine the fill-site and dump-site travel times that limit shuttle output, and identify which leg of the route to shorten first.

  • Compute total water delivered over a 2-hour incident at a stated shuttle rate, accounting for the initial fill and the final dump.

  • Compare the required fire flow for a target hazard against the shuttle output you calculated, and state whether the plan meets the demand.

  • Explain how tank size, dump rate, and fill rate each cap shuttle performance, and rank them by impact for a specific scenario.

Your checkpoint

A shuttle calculation worksheet that solves three scenarios (short haul, medium haul, long haul) with apparatus counts and delivered volume per hour.

Week 3

Water shuttle operations, dump site selection, and large-volume water movement & Dump site operations and water unloading

  • Select a dump site for three described occupancies (a cul-de-sac, a highway shoulder, and a rural driveway) and justify each choice against access, turnaround, and water delivery criteria.

  • Lay out a portable dump tank operation, including tank placement, hard suction or dump valve alignment, and the sequence for swapping a full tank for an empty one.

  • Sequence a tanker dump cycle from arrival through dump, tank swap, and departure, and state the target time for each step.

  • Identify three hazards at a dump site (soft ground, traffic, apparatus movement) and write the control for each.

  • Describe how a dump site that cannot support the full shuttle rate should be reported to the water supply officer and what alternatives to propose.

Your checkpoint

A dump-site selection checklist with scoring criteria and three scored example sites, plus a written dump-cycle sequence with target times.

Week 4

Fill site operations and water loading & Apparatus inspection, maintenance, and operational readiness

  • Set up a fill site from a pressurized hydrant, including hydrant wrench use, steamer connection, gate valve, and fill-line routing, and list the steps in order.

  • Calculate fill time for a 2,000-gallon tank at a given fill rate, then determine whether the hydrant can support the number of apparatus assigned to it.

  • Perform a documented apparatus readiness inspection covering tires, brakes, lights, pump, tank, valves, and water level, and record pass or fail for each item.

  • Build a maintenance schedule for a mobile water supply apparatus that covers daily, weekly, monthly, and annual tasks, and assign each to a responsible role.

  • Explain how a low tank level, a stuck dump valve, or an inoperative tank-fill line would be detected during inspection and what the corrective action is.

Your checkpoint

A completed apparatus readiness inspection form with 20 or more line items and a one-week maintenance calendar.

Week 5

Vehicle operations and driving on public roads, including emergency response and defensive driving & Safety, incident management, and communications

  • Describe the emergency-vehicle operator's legal and departmental responsibilities during a response, including due regard for safety and the limits of emergency privileges.

  • Explain how speed, weight, and load shift affect stopping distance and rollover risk for a partially filled tanker, and apply that to a curve and a downgrade scenario.

  • Write the radio traffic for a water supply request, including location, access, water needed, and fill and dump site status, in the standard order.

  • Identify the command roles in a water shuttle operation and state who assigns dump sites, fill sites, and traffic control.

  • List the defensive driving adjustments for rain, ice, and night operations with a loaded apparatus, and connect each to a specific crash cause.

Your checkpoint

A written radio script for a water shuttle request and a one-page defensive driving decision guide for loaded apparatus in three weather conditions.

Week 6

Relay and dual pumping operations & Mobile water supply apparatus design, components, and water systems

  • Explain the difference between relay pumping and dual pumping, and state when each is the correct choice for a water supply problem.

  • Calculate the maximum distance a relay can cover given pump capacity, hose size, and target flow, and identify where the next relay pumper must be placed.

  • Describe the setup for dual pumping from a static source, including suction arrangement, discharge manifolds, and pressure matching between pumpers.

  • Identify the components that fail most often in relay operations (intake strainers, relief valves, hose couplings) and the inspection that catches each.

  • Explain how a pressure relief valve and a tank fill line protect the apparatus during relay and dual pumping.

Your checkpoint

A relay versus dual pumping decision table with two worked relay distance calculations and a component inspection list.

Week 7

Water supply principles, hydraulics, and flow calculations & Water shuttle operations, dump site selection, and large-volume water movement & Dump site operations and water unloading

  • Solve a full-scenario problem that starts with a target fire flow, sizes the shuttle, selects fill and dump sites, and states the number of apparatus and hose required.

  • Recalculate the same scenario with one apparatus out of service and state the effect on delivered flow.

  • Explain how to expand the shuttle when the incident escalates, including additional fill sites, tanker staging, and traffic control.

  • Identify the point at which a shuttle should be replaced by a relay or a larger-diameter supply line, and justify the switch with numbers.

  • Review your week 2 and week 3 deliverables and correct any calculation or selection errors you find.

Your checkpoint

A complete written water supply plan for one scenario, covering fire flow, shuttle size, site selection, apparatus count, and an escalation trigger.

Week 8

Apparatus inspection, maintenance, and operational readiness & Vehicle operations and driving on public roads, including emergency response and defensive driving & Water supply principles, hydraulics, and flow calculations & Mobile water supply apparatus design, components, and water systems & Fill site operations and water loading & Dump site operations and water unloading & Water shuttle operations, dump site selection, and large-volume water movement & Relay and dual pumping operations & Safety, incident management, and communications

  • Complete a timed 100-question practice set across all nine domains and score it by domain.

  • Review every missed question and write the correct concept and the reason for the error for each.

  • Re-derive the five core formulas (fire flow, shuttle rate, fill time, relay distance, friction loss) from memory without notes.

  • Re-inspect the apparatus checklist and maintenance calendar from week 4 and update anything that has changed.

  • State the safety and command responsibilities for a water shuttle in a five-minute verbal summary.

Your checkpoint

A scored practice exam with a domain-by-domain error log and a one-page formula sheet written from memory.

Milestones

Week 2: Solve an unseen shuttle calculation correctly, including apparatus count and delivered volume per hour, without referring to notes.

Week 4: Complete the apparatus readiness inspection and dump-site checklist from memory of the criteria, with no missed critical item.

Week 6: Explain relay versus dual pumping and correctly place relay pumpers in a worked distance problem.

Week 8: Score at least 80 percent overall on the timed practice set, with no domain below 70 percent, and reproduce all five core formulas from memory.