NGWA CPI · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Total dynamic head
The total head a pump must overcome: static lift plus drawdown plus discharge pressure head plus friction losses in pipe and fittings.
Drawdown
The drop in water level in a well from static level to the pumping level while the pump is running.
Static water level
The undisturbed water level in a well measured when the pump has been off long enough for the level to stabilize.
Pumping water level
The stabilized water level in a well while the pump is operating at a steady rate.
Specific capacity
Pumping rate divided by drawdown, usually expressed in gallons per minute per foot of drawdown; a declining value suggests well fouling.
Pressure tank drawdown
The usable volume of water a tank delivers between the pump cut-in and cut-out pressures; larger pressure spread yields more drawdown.
Tank precharge
The air pressure in a bladder tank, set about 2 psi below cut-in pressure with the system drained of water.
Check valve function
A valve that allows flow in one direction only, holding the water column in the drop pipe when the pump stops.
Motor cooling flow
Water passing the submersible motor at roughly 0.5 ft/s or more carries away heat; insufficient flow overheats and shortens motor life.
Pump curve
A graph of head versus flow for a pump; the operating point is where the pump curve intersects the system curve.
Well yield test
A controlled pumping test that measures rate, drawdown, and recovery to establish a safe pumping rate for the well.
Confined aquifer
A water-bearing layer bounded above and below by low-permeability material, which can produce water under pressure.
Artesian well
A well completed in a confined aquifer where the potentiometric surface rises above the aquifer top; if above land, the well flows.
Well screen
A slotted or perforated section of casing that admits water while holding back formation material and supporting the borehole.
Gravel pack
Uniformly graded gravel placed around a well screen to filter fine formation material and stabilize the borehole in fine soils.
Annular seal
Grout or other approved material placed between the casing and borehole wall to prevent surface contamination from moving down the annulus.
Water table
The upper surface of the saturated zone in an unconfined aquifer, which rises and falls with recharge and pumping.
Recovery test
Measurement of water level rise after pumping stops; slow recovery indicates low permeability or a damaged well.
Ohm's law
The relationship that voltage equals current times resistance; used to check pump circuit voltage drop and current draw.
Full-load amps
The current a motor draws at rated load, shown on the nameplate and used to size overload protection.
Start capacitor
A capacitor that boosts starting torque in a single-phase motor and is switched out once the motor reaches running speed.
Control box
An enclosure containing the starting capacitor and relay used with three-wire submersible pumps; two-wire pumps do not need one.
Pressure switch
A switch that starts the pump at cut-in pressure and stops it at cut-out pressure; worn contacts can weld and run the pump continuously.
Three-phase reversal
Reversing rotation of a three-phase motor by swapping any two of the three supply conductors at the starter or disconnect.
Lockout/tagout
The procedure of de-energizing, locking, and tagging a disconnect before servicing pump or motor circuits to prevent accidental energizing.
Equipment grounding
A continuous conductor bonding the pump, motor frame, and well casing to the electrical system ground to prevent shock hazard.
Short cycling
Rapid on-off operation of a pump, usually caused by a waterlogged tank, failed pressure switch, or leaking check valve.
Voltage drop
Loss of voltage along a conductor due to resistance; long pump circuits need larger wire to keep voltage at the motor within limits.
811 one-call
The service called before digging or drilling so buried utilities are located and marked; work must wait the required notice period.
Mechanic's lien
A legal claim against property for unpaid work; contractors must follow state notice and filing deadlines to preserve the right.
Confined space entry
Entry into a pit or vault requires atmospheric testing, ventilation, a permit, and an attendant outside the space.
Change order
A written, signed amendment to a contract that documents added or deleted work, price adjustment, and schedule effect.