NGWA CPI study materials
NGWA CPI study resources

NGWA CPI study plan

NGWA CPI · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Pump systems and installation (draft domain pending official outline) & Water wells and groundwater fundamentals (draft domain pending official outline)

  • Define the four exam domains in your own words and list the sub-skills you currently lack for each, ranking them by confidence gap.

  • Sketch a typical residential pump system from well to pressure tank to house, labeling every component and stating each component's function in one sentence.

  • Explain the relationship among pump capacity, total dynamic head, and flow rate, and calculate TDH for two worked examples you write yourself.

  • Describe the difference between a jet pump, a submersible pump, and a line-shaft turbine pump, including the depth range and setting where each is normally chosen.

Your checkpoint

A one-page hand-drawn system schematic with 12 or more labeled components and a written TDH calculation for two scenarios, both checked against published pump curves.

Week 2

Pump systems and installation (draft domain pending official outline) & Water wells and groundwater fundamentals (draft domain pending official outline)

  • Compute drawdown, static water level, and pumping water level from a set of hypothetical well log numbers you construct.

  • Compare specific capacity across three wells you invent and explain what a low specific capacity implies about the aquifer or the well screen.

  • Sequence the steps of a submersible pump installation from hole completion to disinfection, listing the safety check at each step.

  • Diagnose four common pump-system faults (short cycling, loss of prime, sand production, low pressure) by matching symptoms to likely causes.

Your checkpoint

A troubleshooting matrix covering at least 8 fault symptoms, each with 2 or more probable causes and the confirming field test.

Week 3

Water wells and groundwater fundamentals (draft domain pending official outline) & Regulations, safety, and business practice (draft domain pending official outline)

  • Explain the hydrologic cycle as it applies to a drilled well, including recharge, cone of depression, and aquifer confinement.

  • Distinguish confined from unconfined aquifers and state how each affects static water level and long-term yield.

  • Summarize the well construction practices that protect groundwater: casing depth, grout seal, sanitary seal, and wellhead completion.

  • Identify the setback and separation distances commonly regulated for wells relative to septic systems, property lines, and contamination sources, and flag where local rules may differ.

Your checkpoint

A well-construction checklist of at least 15 items, each annotated with why it matters for water quality or structural integrity.

Week 4

Pump systems and installation (draft domain pending official outline) & Electrical and controls for pumping equipment (draft domain pending official outline)

  • Read a pump curve and select a pump for a stated flow and head requirement, documenting why the operating point falls on the curve's efficient region.

  • Size a pressure tank for a given pump cycling allowance and explain the role of precharge pressure.

  • Trace a typical pump control circuit from breaker to pressure switch to contactor to motor, describing what each device protects against.

  • Calculate full-load current draw and voltage drop for a single-phase submersible motor run on a long drop cable.

Your checkpoint

A pump-and-tank selection worksheet for two scenarios (shallow jet and deep submersible) with curve references, tank sizing math, and wire sizing shown.

Week 5

Electrical and controls for pumping equipment (draft domain pending official outline)

  • Explain the purpose and wiring of pressure switches, float switches, and level electrodes in tank-fill and booster applications.

  • Describe motor protection devices (overload relays, thermal protectors, lightning arrestors) and state the failure each prevents.

  • Interpret nameplate data on a submersible motor and match it to correct control-box and starting-capacitor requirements.

  • Outline lockout/tagout and verify-the-dead-circuit procedure for servicing a pump control panel.

Your checkpoint

A labeled control-panel wiring diagram you draw from memory, with a written verification that every conductor and protective device is accounted for.

Week 6

Electrical and controls for pumping equipment (draft domain pending official outline) & Regulations, safety, and business practice (draft domain pending official outline)

  • Explain grounding and bonding requirements for pump equipment and why an ungrounded submersible motor is a shock and fire hazard.

  • Describe how variable-frequency drives affect pump motors, including bearing currents and cable length limits, at a conceptual level.

  • List the electrical safety hazards specific to wet well and outdoor pump installations and the PPE and test instruments used to control them.

  • Practice interpreting a motor-insulation resistance test result and state when a motor should be pulled rather than restarted.

Your checkpoint

A one-page electrical safety field card covering grounding checks, insulation-resistance testing steps, and lockout sequence, written so a helper could follow it.

Week 7

Regulations, safety, and business practice (draft domain pending official outline) & Water wells and groundwater fundamentals (draft domain pending official outline)

  • Summarize the regulatory layers that govern water wells (federal, state, local) and identify which layer typically sets construction standards.

  • Explain licensing, permitting, and record-keeping obligations a pump installer or well contractor must meet, noting that specifics vary by jurisdiction.

  • Describe water-quality testing parameters (coliform bacteria, nitrate, arsenic, hardness, pH) and what each result signals for treatment decisions.

  • Outline disinfection procedure after well or pump service and the waiting period and retest that follow.

Your checkpoint

A compliance and water-quality quick-reference table of at least 10 parameters or obligations, each with the reason it matters and where to confirm the local requirement.

Week 8

Pump systems and installation (draft domain pending official outline) & Water wells and groundwater fundamentals (draft domain pending official outline) & Electrical and controls for pumping equipment (draft domain pending official outline) & Regulations, safety, and business practice (draft domain pending official outline)

  • Complete a timed 60-question self-made practice set spanning all four domains and score it by domain.

  • Re-teach your two weakest sub-skills from memory without notes, then check against your earlier materials.

  • Recompute two TDH and wire-sizing problems cold to confirm the methods have stuck.

  • Build a one-page formula and conversion sheet you can reconstruct mentally on exam day.

Your checkpoint

A scored practice-set log showing per-domain percentages, a list of the five missed items with corrected reasoning, and a final formula sheet.

Milestones

Week 2: You can draw the full well-to-house system and compute TDH and specific capacity without notes, scoring at least 80% on a 15-question self-quiz over domains 1 and 2.

Week 4: You can select a pump and pressure tank for a new scenario and justify the choice from a curve, and you can trace a control circuit end to end, scoring at least 75% on a mixed 20-question set.

Week 6: You can explain grounding, motor protection, and insulation-resistance testing to a non-electrician, and your control-panel diagram matches a reference with no missing protective devices.

Week 8: Timed 60-question practice set completed with at least 75% overall and no domain below 65%, with every missed item rewritten with corrected reasoning.