NGWA CWD study materials
NGWA CWD study resources

NGWA CWD cheat sheet

NGWA CWD · Keep the key ideas within reach.

Quick reference

Drilling General: NGWA CWD Core Knowledge

  • Cable tool vs. rotary: cable tool breaks and bails rock by repeated impact; rotary destroys formation with a rotating bit while circulating fluid removes cuttings.

  • Hole volume in gallons per foot = borehole diameter squared (in) ÷ 24.5; a 6-in hole holds about 1.47 gal/ft, so annular velocity and fill volumes scale with diameter squared.

  • Annular velocity (ft/min) = 24.5 × pump output (gpm) ÷ (hole diameter² − pipe diameter²), both diameters in inches.

  • Hydrostatic pressure (psi) = 0.433 × fluid density (lb/gal) × true vertical depth (ft); a 9.0 lb/gal mud at 200 ft exerts about 779 psi.

  • Formation fracture gradient sets the upper bound on mud weight and grout pressure; exceeding it causes loss of circulation or formation breakdown.

  • Standard well construction sequence: drill pilot hole, ream to design diameter, set casing, grout annulus, develop, then test yield and water quality.

  • Grout volume (ft³) = annular capacity between casing OD and borehole wall × length; add 10-25% for washouts and fractures.

  • Well development methods include surging, jetting, air-lift pumping, and overpumping; each removes drilling fines and filter cake to restore formation permeability.

  • Abandonment requires sealing the entire borehole with low-permeability material (neat cement or bentonite grout) and a surface seal, not just backfill with cuttings.

Quick reference

Specialized Drilling: Environmental and Geotechnical Monitoring Well Installation

  • Monitoring well screen slot size is typically selected to retain 90-100% of the filter pack, with the pack sized 4-5 times the d50 of the formation.

  • Filter pack extends at least 2 ft above the top of screen; the bentonite seal above the pack is typically 2-5 ft thick and hydrated before grouting.

  • Sand content of grout and filter pack must be low; neat cement grout is mixed at a water-to-cement ratio near 0.4-0.5 by weight (about 6-7 gal per 94-lb sack).

  • Grout is placed by tremie from the bottom up, keeping the discharge end submerged to prevent voids, bridging, and dilution.

  • Well casing and screen materials for environmental work are usually flush-threaded Schedule 40 PVC, stainless steel, or PTFE; solvent cement joints are avoided to prevent VOC contamination.

  • Static water level is measured from a surveyed reference point (top of casing), and depth to water plus measuring-point elevation yields hydraulic head for gradient calculations.

  • Hydraulic gradient = (h1 − h2) ÷ distance between wells; flow direction follows the head decrease, and Darcy velocity = K × gradient ÷ effective porosity.

  • Low-flow purging targets drawdown under 0.1 ft and stabilized water-quality parameters (pH, specific conductance, turbidity, DO, ORP) before sample collection.

  • Decontamination sequence for sampling equipment: wash with phosphate-free detergent, rinse with tap water, rinse with deionized water, then air-dry; dedicated or disposable equipment reduces cross-contamination.