NJ General Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Business Organization, Licensing, and Legal Compliance & New Jersey Uniform Construction Code and Permitting

  • Map the New Jersey contractor licensing path: classify business entity types (sole proprietorship, LLC, corporation) and state which registration each requires

  • Identify the New Jersey Division of Consumer Affairs home improvement contractor registration requirements and the documents a candidate must assemble

  • Outline the Uniform Construction Code structure: how the subcodes (building, electrical, plumbing, fire, energy, rehabilitation) fit together and who enforces them

  • Distinguish the roles of the construction official, subcode officials, and local enforcing agency in the permit process

  • Build a one-page reference sheet listing every license, registration, and insurance item with its issuing authority

Your checkpoint

A one-page licensing and UCC authority reference sheet with entity types, registrations, and enforcement roles, self-quizzed to 90% recall

Week 2

Business Organization, Licensing, and Legal Compliance & Contracts, Consumer Protection, and Home Improvement Law

  • Explain the required elements of a enforceable home improvement contract under New Jersey consumer protection rules, including the three-business-day cancellation right

  • List the mandatory written contract disclosures and identify which omissions create violations

  • Analyze the Consumer Fraud Act's treble-damages and attorney-fee exposure and describe practices that trigger it

  • Differentiate lien rights, notice requirements, and prompt-payment obligations that affect contractor cash flow

  • Draft a compliant sample contract outline with every required clause labeled

Your checkpoint

A clause-by-clause compliant home improvement contract outline with each statutory requirement annotated

Week 3

Contracts, Consumer Protection, and Home Improvement Law & Construction Safety and Occupational Health

  • Apply the contract-change order process and write a sample written change order that protects both parties

  • Identify OSHA Focus Four hazards and state the abatement for each on a residential jobsite

  • Determine when fall protection is required at residential heights and select the correct system for a given scenario

  • Specify scaffolding, ladder, and excavation protective-system requirements using the applicable standards

  • Explain hazard communication, silica, and respiratory protection duties for common construction tasks

Your checkpoint

A jobsite safety plan covering fall protection, excavation, and hazard communication, plus three completed sample change orders

Week 4

Construction Safety and Occupational Health & Site Work, Foundations, and Concrete

  • Calculate soil bearing pressure and sizing for spread footings given load and soil capacity

  • Sequence a foundation excavation, footing, and waterproofing operation and identify inspection hold points

  • Specify concrete mix design parameters: water-cement ratio, slump, air entrainment, and curing method by exposure

  • Diagnose common concrete defects (honeycomb, cold joints, shrinkage cracking) and prescribe corrective action

  • Interpret a soil test report and decide whether a design change is warranted

Your checkpoint

A foundation and concrete inspection checklist plus three worked footing-sizing problems with correct answers

Week 5

Framing, Carpentry, and Structural Systems & Estimating, Bidding, and Project Planning

  • Size floor joists, headers, and rafters using span tables and state the loading assumptions behind each

  • Explain load path continuity from roof to foundation and identify common framing discontinuities

  • Apply wall bracing, anchor bolt, and connector requirements for lateral resistance

  • Produce a quantity takeoff for framing lumber and sheathing from a simple plan and convert it to a bid line

  • Build a bid with labor, material, equipment, overhead, and contingency, and explain how markup differs from margin

Your checkpoint

A complete framing takeoff and priced bid for a small addition, with span-table calculations shown

Week 6

Building Envelope, Roofing, and Weatherproofing & Site Work, Foundations, and Concrete

  • Detail a roof assembly from deck to finish: underlayment, flashing, ice barrier, ventilation, and drainage

  • Specify waterproofing and drainage for below-grade walls and compare dampproofing versus waterproofing

  • Identify the causes and repairs for common envelope failures: air leakage, thermal bridging, and moisture intrusion

  • Apply flashing details at wall-roof intersections, penetrations, and window openings

  • Select weather-resistive barrier and sealant systems appropriate to the substrate and exposure

Your checkpoint

A set of hand-sketched flashing and waterproofing details with a written rationale for each material choice

Week 7

Mechanical, Electrical, and Plumbing Coordination & New Jersey Uniform Construction Code and Permitting

  • Sequence rough-in inspections for electrical, plumbing, and mechanical work and state what each inspection verifies

  • Explain permit application, plan review, inspection scheduling, and certificate of occupancy in the UCC process

  • Identify when a permit is required versus exempt and describe penalties for unpermitted work

  • Coordinate trade rough-ins to avoid conflicts with structural framing and envelope penetrations

  • Interpret common code references for receptacle spacing, GFCI protection, and drain slope

Your checkpoint

A permit and inspection timeline for a full renovation project, with trade rough-in coordination notes and a permit-required decision table

Week 8

Business Organization, Licensing, and Legal Compliance & Contracts, Consumer Protection, and Home Improvement Law & New Jersey Uniform Construction Code and Permitting

  • Complete two full-length timed practice exams and score each domain separately

  • Re-study only the two lowest-scoring domains using targeted drills until accuracy exceeds 80%

  • Recite from memory the licensing, contract-disclosure, and permit-process requirements without notes

  • Review every missed question and write the underlying rule for each in one sentence

Your checkpoint

A scored practice-exam log with domain breakdowns, a list of corrected error patterns, and a final one-page pre-exam review sheet

Milestones

Week 2: Score at least 80% on a 30-question mixed set drawn from Domains 1 and 2, and produce the compliant contract outline from memory

Week 4: Score at least 75% on a 40-question set covering Domains 4 and 5, and correctly solve all three footing-sizing problems unaided

Week 6: Score at least 75% on a 40-question set covering Domains 6, 7, and 3, and complete the framing takeoff with no arithmetic errors

Week 7: Score at least 80% on a 30-question set covering Domains 8 and 9, and correctly classify 20 permit scenarios as required or exempt

Week 8: Achieve at least 80% overall on two full-length timed practice exams with no domain below 70%