Mistake 1

Treating saturated suction temperature and evaporator coil temperature as interchangeable when calculating superheat, so the superheat result comes out wrong on charging questions.

Candidates memorize 'subcooling for TXV, superheat for fixed orifice' but never drill the actual measurement points, and they confuse gauge pressure with the corresponding saturation temperature.

What to do instead

Practice a fixed routine: convert suction gauge pressure to saturation temperature using a PT chart, measure suction line temperature at the same location, subtract saturation from line temperature. Do ten practice problems with real PT values until the sequence is automatic.

Mistake 2

Selecting a furnace or boiler by matching the old unit's input Btu/h instead of calculating the structure's actual heat loss and the required output.

Replacement work in the field often relies on nameplate matching, and candidates carry that habit into exam questions that describe insulation, window, and volume data expecting an actual load calculation.

What to do instead

When a question supplies dimensions, R-values, and design temperatures, always compute heat loss and then convert to output Btu/h; only then compare with input ratings after applying AFUE or combustion efficiency. Treat nameplate matching as a distractor.

Mistake 3

Ignoring the difference between input and output ratings when sizing or when checking combustion air requirements for a Category I appliance.

Nameplate data is read quickly and the AFUE or steady-state efficiency is skipped, so the candidate uses input Btu/h where output is required or vice versa.

What to do instead

Write 'input x efficiency = output' at the top of scratch paper for every heating question. For combustion air, use input rating only, and confirm whether the space qualifies as confined or unconfined before applying the 50 cubic feet per 1,000 Btu/h rule.

Mistake 4

Applying the general duct sizing or refrigerant line rule without checking the specific velocity, friction rate, or length limit stated in the question.

Candidates memorize a single friction rate or a '500 feet per minute' figure and apply it to every scenario, missing that the question specifies a different static pressure budget or equivalent length.

What to do instead

Before answering, underline the given friction rate, total equivalent length, and allowable velocity. Recompute with the stated values rather than the remembered default, and sanity-check the resulting duct size against the airflow in cfm.

Mistake 5

Confusing overcurrent protection sizing with conductor ampacity sizing for a motor circuit, leading to a wrong breaker or wire size selection.

The two calculations use different multipliers and different tables, and candidates blend the 125 percent conductor rule with the motor branch-circuit short-circuit and ground-fault protection rules.

What to do instead

Separate the two steps on paper: first size conductors at 125 percent of the motor full-load current from the appropriate table, then size the branch-circuit protection from the separate motor protection table. Answer the question actually asked, not both at once.

Mistake 6

Answering code questions from general trade knowledge instead of the specific New Jersey Uniform Construction Code structure, such as who may file, inspect, or issue a certificate of occupancy.

The licensing and administrative portion feels like common sense, so candidates skip studying it, yet it is a large share of the exam and is state-specific.

What to do instead

Build a one-page chart of roles: code official, subcode official, inspector, licensed contractor, and owner. Note filing requirements, permit exemptions, inspection sequencing, and certificate of occupancy triggers, then test yourself on scenario questions about who does what.

Mistake 7

Mixing up recovery, recycling, and evacuation requirements, including the required vacuum level and the prohibition on venting, when answering refrigerant handling questions.

The terms sound similar and field practice varies, so candidates rely on habit rather than the regulatory definitions and the required evacuation levels for different appliance types.

What to do instead

Memorize a small table: recovery versus recycling versus reclaim, the required evacuation level for each appliance category, and the venting prohibition. Tie each item to a scenario so the term is recognized from context, not from the label alone.

Mistake 8

Skipping the combustion air and venting checks on gas piping questions and going straight to pipe sizing.

Pipe sizing tables are the most practiced part of fuel gas, so candidates jump to them and miss the question's real issue, which is inadequate combustion air or improper vent connector slope.

What to do instead

Read the stem for words like confined space, vent connector, draft hood, or appliance location before touching a sizing table. If those appear, resolve the venting or air requirement first, since it may change the appliance's acceptable input.

Mistake 9

Calculating a bid or overhead markup by adding a percentage to cost instead of dividing by the complement of the desired gross margin, producing an underbid.

Markup and margin are treated as synonyms in everyday speech, so the candidate applies the margin percentage directly to cost and the resulting profit is lower than intended.

What to do instead

Fix the formula in memory: price equals cost divided by one minus the target gross margin. Work three examples both ways to see the gap, and on contract questions check whether retainage, change-order markup, and payment terms are stated before computing the final number.

Mistake 10

Reading a heat pump question as if it were a cooling-only system, missing the defrost cycle, auxiliary heat, or balance point interaction in the stated conditions.

Candidates practice heat pumps with summer conditions and then carry the same assumptions into winter scenarios where capacity, balance point, and supplemental heat determine the answer.

What to do instead

For any heat pump stem, first identify the mode and outdoor temperature, then determine whether the balance point is above or below that temperature, and only then decide what equipment is operating. Sketch the balance point on a capacity-versus-temperature curve.