NJ HVAC Contractor study plan
NJ HVAC Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Refrigeration Principles, Thermodynamics, and System Components & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling
Explain the vapor-compression cycle stage by stage and state the pressure-temperature relationship for at least three common refrigerants
Interpret a pressure-enthalpy diagram to locate subcooling, superheat, and the four cycle points for a stated operating condition
Identify compressor, metering device, evaporator, and condenser types and describe the failure mode each exhibits when starved or flooded
Apply EPA Section 608 handling rules: recovery requirements, evacuation levels, leak-rate thresholds, and recordkeeping for appliances by charge size
Demonstrate safe refrigerant cylinder handling, including hydrostatic relief awareness, liquid vs vapor charging, and cylinder heating prohibitions
Your checkpoint
A one-page hand-drawn P-h diagram with labeled cycle points plus a written table of evacuation levels and leak-rate trigger percentages by appliance class, self-scored against reference notes
Refrigeration Principles, Thermodynamics, and System Components & Air Conditioning, Heat Pumps, and Refrigerant Systems Installation
Calculate superheat and subcooling from gauge and thermometer readings and state whether each indicates undercharge, overcharge, or restriction
Diagnose five common refrigerant-circuit faults from a described symptom set (high superheat with low subcooling, and so on)
Size and select line sets, metering devices, and evaporator coils for a described matched system
Describe heat pump reversing valve operation and defrost initiation, termination, and backup-lockout sequences
Sequence a leak-free evacuation and charging procedure from recovery through final verification
Your checkpoint
A troubleshooting matrix covering at least eight fault patterns with the measured superheat/subcooling, likely cause, and corrective action for each
Heating Systems: Combustion, Furnaces, Boilers, and Hydronics & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling
Perform combustion analysis math: calculate excess air, stack temperature rise, and steady-state efficiency from a given flue reading
Identify draft categories and verify venting and combustion air requirements for Category I and Category IV appliances
Trace a gas train from service regulator through manifold and explain the function and test method for each safety control
Size and pipe a natural gas or propane distribution system using the longest-run method and appropriate tables
List clearance-to-combustible, condensate, and relief valve requirements for a residential boiler installation
Your checkpoint
A completed gas piping sizing worksheet for a sample two-appliance layout with pipe diameters, pressure drop, and combustion air method documented
Heating Systems: Combustion, Furnaces, Boilers, and Hydronics & Load Calculations, Sizing, and Energy Code Requirements
Compare condensing and non-condensing boiler piping, primary-secondary hydronic loops, and circulator selection criteria
Compute heat loss for a sample house using the block load and room-by-room methods and reconcile the difference
Select equipment capacity from calculated load rather than rules of thumb and explain the effect of oversizing on humidity and cycling
Apply New Jersey energy code provisions for envelope, duct insulation, and equipment minimum efficiency
Verify boiler and furnace sizing against distribution capacity and available static pressure
Your checkpoint
A room-by-room load calculation for a sample single-family home with equipment selection justified in writing against the calculated load
Air Distribution, Duct Design, and Indoor Air Quality & Load Calculations, Sizing, and Energy Code Requirements
Size supply and return ducts using friction-rate and velocity methods and check available static pressure against blower data
Apply Manual D equivalent-length and fitting-loss logic to a described trunk-and-branch layout
Diagnose airflow problems: excessive external static, undersized returns, and pressure imbalance across a closed door
Explain ventilation and IAQ requirements including outdoor air, filtration MERV selection, and moisture control targets
Identify duct sealing, insulation, and location requirements that affect energy code compliance
Your checkpoint
A duct layout sketch with friction-rate sizing calculations, total equivalent length, and predicted external static pressure for the sample system
Electrical Controls, Motors, and Wiring for HVAC Equipment & Air Conditioning, Heat Pumps, and Refrigerant Systems Installation
Read and draw ladder diagrams for a call for heat, call for cool, and continuous fan using standard HVAC symbols
Troubleshoot motor circuits: PSC vs ECM, capacitor testing, start-assist components, and winding resistance checks
Verify control transformer loading, thermostat wiring configurations, and low-voltage short diagnosis
Apply electrical code requirements for disconnects, overcurrent protection, grounding, and conductor sizing for HVAC equipment
Test the sequence of operation on a heat pump with auxiliary and emergency heat, including lockout and balance point
Your checkpoint
A fully labeled ladder diagram for a heat pump with aux heat plus a written step-by-step sequence of operation keyed to each component in the diagram
New Jersey Uniform Construction Code and Licensing Regulations & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling
Map the New Jersey Uniform Construction Code subcodes to HVAC work and identify when a permit and inspection are required
Describe the licensing framework: contractor and master classifications, scope of work, business permit, and continuing education obligations
Outline the inspection sequence from permit application through rough-in, final, and certificate of occupancy or approval
State employer and employee responsibilities under OSHA for ladders, confined spaces, electrical safety, and refrigerant exposure
Identify notification, recordkeeping, and refrigerant sales-restriction obligations for a licensed New Jersey contractor
Your checkpoint
A permit-and-inspection flow checklist for a residential HVAC replacement project, annotated with the code or licensing authority cited at each step
Business, Contracts, Estimating, and Project Management & New Jersey Uniform Construction Code and Licensing Regulations
Build a takeoff-based estimate for a sample replacement job including labor hours, overhead, markup, and contingency
Draft contract terms covering scope, change orders, payment schedule, warranty, and lien and insurance requirements
Create a project schedule with material ordering, permit lead time, and inspection milestones for a two-week job
Review the full domain list and write a personal weak-area list with a remediation action for each item
Complete a timed 60-question mixed practice set and analyze every miss by domain
Your checkpoint
A complete sample estimate and one-page contract summary for a residential replacement project, plus a scored practice-set error log grouped by domain
Milestones
Week 2: Score at least 80 percent on a self-made 25-question quiz covering refrigeration cycle, superheat and subcooling diagnosis, and refrigerant handling rules, with every miss rewritten as a corrected note card
Week 4: Produce a load calculation and equipment selection that a peer can follow line by line, and correctly answer at least 8 of 10 combustion and hydronics questions without notes
Week 6: Draw the heat pump ladder diagram and state the sequence of operation from memory in under 15 minutes, then verify against notes with no more than one error
Week 8: Achieve 75 percent or better on the timed 60-question mixed set with no domain scoring below 60 percent, and have a written remediation plan for any domain still under 70 percent