NJ HVAC Contractor study materials
NJ HVAC Contractor study resources

NJ HVAC Contractor study plan

NJ HVAC Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Refrigeration Principles, Thermodynamics, and System Components & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling

  • Explain the vapor-compression cycle stage by stage and state the pressure-temperature relationship for at least three common refrigerants

  • Interpret a pressure-enthalpy diagram to locate subcooling, superheat, and the four cycle points for a stated operating condition

  • Identify compressor, metering device, evaporator, and condenser types and describe the failure mode each exhibits when starved or flooded

  • Apply EPA Section 608 handling rules: recovery requirements, evacuation levels, leak-rate thresholds, and recordkeeping for appliances by charge size

  • Demonstrate safe refrigerant cylinder handling, including hydrostatic relief awareness, liquid vs vapor charging, and cylinder heating prohibitions

Your checkpoint

A one-page hand-drawn P-h diagram with labeled cycle points plus a written table of evacuation levels and leak-rate trigger percentages by appliance class, self-scored against reference notes

Week 2

Refrigeration Principles, Thermodynamics, and System Components & Air Conditioning, Heat Pumps, and Refrigerant Systems Installation

  • Calculate superheat and subcooling from gauge and thermometer readings and state whether each indicates undercharge, overcharge, or restriction

  • Diagnose five common refrigerant-circuit faults from a described symptom set (high superheat with low subcooling, and so on)

  • Size and select line sets, metering devices, and evaporator coils for a described matched system

  • Describe heat pump reversing valve operation and defrost initiation, termination, and backup-lockout sequences

  • Sequence a leak-free evacuation and charging procedure from recovery through final verification

Your checkpoint

A troubleshooting matrix covering at least eight fault patterns with the measured superheat/subcooling, likely cause, and corrective action for each

Week 3

Heating Systems: Combustion, Furnaces, Boilers, and Hydronics & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling

  • Perform combustion analysis math: calculate excess air, stack temperature rise, and steady-state efficiency from a given flue reading

  • Identify draft categories and verify venting and combustion air requirements for Category I and Category IV appliances

  • Trace a gas train from service regulator through manifold and explain the function and test method for each safety control

  • Size and pipe a natural gas or propane distribution system using the longest-run method and appropriate tables

  • List clearance-to-combustible, condensate, and relief valve requirements for a residential boiler installation

Your checkpoint

A completed gas piping sizing worksheet for a sample two-appliance layout with pipe diameters, pressure drop, and combustion air method documented

Week 4

Heating Systems: Combustion, Furnaces, Boilers, and Hydronics & Load Calculations, Sizing, and Energy Code Requirements

  • Compare condensing and non-condensing boiler piping, primary-secondary hydronic loops, and circulator selection criteria

  • Compute heat loss for a sample house using the block load and room-by-room methods and reconcile the difference

  • Select equipment capacity from calculated load rather than rules of thumb and explain the effect of oversizing on humidity and cycling

  • Apply New Jersey energy code provisions for envelope, duct insulation, and equipment minimum efficiency

  • Verify boiler and furnace sizing against distribution capacity and available static pressure

Your checkpoint

A room-by-room load calculation for a sample single-family home with equipment selection justified in writing against the calculated load

Week 5

Air Distribution, Duct Design, and Indoor Air Quality & Load Calculations, Sizing, and Energy Code Requirements

  • Size supply and return ducts using friction-rate and velocity methods and check available static pressure against blower data

  • Apply Manual D equivalent-length and fitting-loss logic to a described trunk-and-branch layout

  • Diagnose airflow problems: excessive external static, undersized returns, and pressure imbalance across a closed door

  • Explain ventilation and IAQ requirements including outdoor air, filtration MERV selection, and moisture control targets

  • Identify duct sealing, insulation, and location requirements that affect energy code compliance

Your checkpoint

A duct layout sketch with friction-rate sizing calculations, total equivalent length, and predicted external static pressure for the sample system

Week 6

Electrical Controls, Motors, and Wiring for HVAC Equipment & Air Conditioning, Heat Pumps, and Refrigerant Systems Installation

  • Read and draw ladder diagrams for a call for heat, call for cool, and continuous fan using standard HVAC symbols

  • Troubleshoot motor circuits: PSC vs ECM, capacitor testing, start-assist components, and winding resistance checks

  • Verify control transformer loading, thermostat wiring configurations, and low-voltage short diagnosis

  • Apply electrical code requirements for disconnects, overcurrent protection, grounding, and conductor sizing for HVAC equipment

  • Test the sequence of operation on a heat pump with auxiliary and emergency heat, including lockout and balance point

Your checkpoint

A fully labeled ladder diagram for a heat pump with aux heat plus a written step-by-step sequence of operation keyed to each component in the diagram

Week 7

New Jersey Uniform Construction Code and Licensing Regulations & Safety, Fuel Gas Piping, and Environmental Refrigerant Handling

  • Map the New Jersey Uniform Construction Code subcodes to HVAC work and identify when a permit and inspection are required

  • Describe the licensing framework: contractor and master classifications, scope of work, business permit, and continuing education obligations

  • Outline the inspection sequence from permit application through rough-in, final, and certificate of occupancy or approval

  • State employer and employee responsibilities under OSHA for ladders, confined spaces, electrical safety, and refrigerant exposure

  • Identify notification, recordkeeping, and refrigerant sales-restriction obligations for a licensed New Jersey contractor

Your checkpoint

A permit-and-inspection flow checklist for a residential HVAC replacement project, annotated with the code or licensing authority cited at each step

Week 8

Business, Contracts, Estimating, and Project Management & New Jersey Uniform Construction Code and Licensing Regulations

  • Build a takeoff-based estimate for a sample replacement job including labor hours, overhead, markup, and contingency

  • Draft contract terms covering scope, change orders, payment schedule, warranty, and lien and insurance requirements

  • Create a project schedule with material ordering, permit lead time, and inspection milestones for a two-week job

  • Review the full domain list and write a personal weak-area list with a remediation action for each item

  • Complete a timed 60-question mixed practice set and analyze every miss by domain

Your checkpoint

A complete sample estimate and one-page contract summary for a residential replacement project, plus a scored practice-set error log grouped by domain

Milestones

Week 2: Score at least 80 percent on a self-made 25-question quiz covering refrigeration cycle, superheat and subcooling diagnosis, and refrigerant handling rules, with every miss rewritten as a corrected note card

Week 4: Produce a load calculation and equipment selection that a peer can follow line by line, and correctly answer at least 8 of 10 combustion and hydronics questions without notes

Week 6: Draw the heat pump ladder diagram and state the sequence of operation from memory in under 15 minutes, then verify against notes with no more than one error

Week 8: Achieve 75 percent or better on the timed 60-question mixed set with no domain scoring below 60 percent, and have a written remediation plan for any domain still under 70 percent