- Qualifying party
- The licensed individual who passes the trade exam and is actively in charge of the contractor's HVAC work in New Mexico; loss of this person requires notice to CID and replacement within the rule's timeframe.
- CID license classification
- New Mexico Construction Industries Division issues licenses by classification and scope; HVAC work falls under mechanical classifications, and bidding outside that scope is a violation.
- License number display
- New Mexico contractors must show their license number on advertising, bids, and contracts, and may not contract for work beyond the classification held.
- Unlicensed contracting penalty
- Contracting without a New Mexico license is a misdemeanor and subject to CID citations and civil penalties; the contractor also loses lien and collection rights.
- Gross receipts tax
- New Mexico imposes gross receipts tax on the seller of services and goods; HVAC contractors pay it on receipts and must not treat it as a sales tax.
- Break-even revenue
- Break-even revenue equals fixed overhead divided by gross margin percentage; it shows the sales volume needed before the business earns any net profit.
- Labor burden
- Labor burden includes payroll taxes, workers' compensation, liability insurance, and benefits added to base wage to compute the true hourly cost used in estimates.
- Retainage
- A percentage, commonly 5-10%, withheld from progress payments until final acceptance; it is tracked as accounts receivable and affects cash flow planning.
- Bid bond
- A bid bond guarantees the contractor will enter the contract at the bid price if awarded; failure can result in forfeiture up to the bond amount.
- Waste factor
- A percentage added to takeoff quantities to cover cutting and scrap; typical values are 10-15% for sheet metal and 5-10% for pipe and fittings.
- Critical path float
- Float is the time an activity can slip without delaying project completion; activities on the critical path have zero float and must be managed closely.
- Substantial completion
- The stage when the work is sufficiently complete for the owner to use it for its intended purpose; it triggers warranty start, retainage release, and occupancy.
- Fall protection threshold
- OSHA 29 CFR 1926 requires fall protection at 6 feet in construction; New Mexico enforces through its state Occupational Health and Safety Bureau plan.
- Extension ladder ratio
- Extension ladders are set at a 4:1 slope, extend 3 feet above the landing, and are secured at the top; the top two rungs are not to be used.
- Confined space oxygen range
- Entry requires atmospheric testing with oxygen between 19.5% and 23.5%, a permit, an attendant outside, and a rescue plan before entry.
- Lockout/tagout
- Before servicing HVAC motors or controls, the disconnect must be locked and tagged, and zero energy verified, per OSHA 1910.147 requirements.
- Manual J
- Manual J calculates room-by-room heating and cooling loads from envelope, orientation, infiltration, and internal gains, and is the basis for equipment selection.
- Manual S
- Manual S selects equipment using manufacturer expanded performance data matched to the Manual J load, rather than nominal capacity alone.
- Sensible heat equation
- Sensible heat equals 1.08 times CFM times the temperature difference at sea level; at 5,000 feet the factor drops to about 0.83 because air density is lower.
- Total heat equation
- Total heat equals 4.5 times CFM times the enthalpy difference in Btu per pound; it combines sensible and latent loads in one calculation.
- Category IV furnace
- A condensing furnace operates with positive vent pressure and flue gas below the dew point; it vents in PVC or CPVC and produces acidic condensate requiring a trap.
- Combustion air openings
- Two permanent openings are required, one within 12 inches of the top and one within 12 inches of the bottom, each sized per the applicable code table.
- Boiler low-water cutoff
- A low-water cutoff shuts off the burner when water level drops below a safe point; it is required along with a relief valve and expansion tank.
- Superheat and subcooling
- Superheat is measured at the evaporator outlet and sets TXV or orifice charge; subcooling is measured at the condenser outlet and confirms liquid seal.
- EPA Section 608 venting ban
- Refrigerant may not be knowingly vented; recovery is required before opening a system, and technicians must hold the certification type matching the equipment.
- Recovery cylinder limit
- A DOT-approved recovery cylinder must not be filled above 80% of capacity by weight and must be labeled with the refrigerant type and amount.
- Fan laws
- CFM varies directly with RPM, static pressure with RPM squared, and horsepower with RPM cubed; these laws predict performance when fan speed changes.
- Friction rate
- Friction rate equals available static pressure divided by total effective length; residential duct design commonly targets 0.1 inch w.c. per 100 feet.
- Motor full-load amps
- Full-load amps are read from NEC Table 430.248 for single-phase and 430.250 for three-phase motors; branch conductors are sized at 125% of that value.
- Thermostat wire convention
- Standard thermostat colors are R for power, W for heat, Y for cooling, G for fan, and C for common; mismatched wiring causes staging and control faults.
- Nitrogen purge brazing
- A nitrogen purge prevents internal oxidation during brazing of copper refrigerant lines; 15% silver phos-copper is used for copper-to-copper joints.
- Rough-in inspection
- A rough-in inspection verifies framing, duct, piping, and electrical before concealment; it must be scheduled and passed before drywall or insulation covers the work.